Page: [7] C.06 SITE LAYOUT
Author: pjm
File Name: Civil Plan Set Change Order.805 Roaring Fork
Road.2018.09.pdf
Does inlet C1 capture yard
runoff?
Civil Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf (2)
Page: [7] C.06 SITE LAYOUT
Author: pjm
File Name: Civil Plan Set Change Order.805 Roaring Fork
Road.2018.09.pdf
Provide sizing calcs for the
second drywell.
It is not recommended to have
utilities located so close to the
drywells, they shall be outside
the gravel perimeter of the
drywells at a minimum.
Does inlet C1 capture
yard runoff?
Provide sizing calcs
for the second
drywell.
It is not
recommended to
have utilities located
so close to the
drywells, they shall
be outside the gravel
perimeter of the
drywells at a
minimum.
As shown in the detail on sheet C.08, the drywells are proposed with grass access trays. This
prevents the drywells from collecting the low point in the yard, so this inlet was added to the design
for drainage as well as for the emergency overflow.
Drywell sizing calcs are shown on C.03.
The location of the two drywells was determined to keep excavation out of driplines. It was
coordinated with the contractor to bend the conduits away from the drywells as much as
possible during backfilling to ensure the most clearance possible.
02/11/2019