Loading...
HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0235.2018 (10).ARBK0235.2018.arbk_engineering1_803 roaring fork road Page: [7] C.06 SITE LAYOUT Author: pjm File Name: Civil Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf Does inlet C1 capture yard runoff? Civil Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf (2) Page: [7] C.06 SITE LAYOUT Author: pjm File Name: Civil Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf Provide sizing calcs for the second drywell. It is not recommended to have utilities located so close to the drywells, they shall be outside the gravel perimeter of the drywells at a minimum. Does inlet C1 capture yard runoff? Provide sizing calcs for the second drywell. It is not recommended to have utilities located so close to the drywells, they shall be outside the gravel perimeter of the drywells at a minimum. As shown in the detail on sheet C.08, the drywells are proposed with grass access trays. This prevents the drywells from collecting the low point in the yard, so this inlet was added to the design for drainage as well as for the emergency overflow. Drywell sizing calcs are shown on C.03. The location of the two drywells was determined to keep excavation out of driplines. It was coordinated with the contractor to bend the conduits away from the drywells as much as possible during backfilling to ensure the most clearance possible. 02/11/2019