HomeMy WebLinkAboutFile Documents.800 S Mill St.0321.2017 (15).ARBK 132 Park Avenue Basalt, Colorado 81621 (970) 927-9119 www.ruddconstruction.com - 1 – 5TH AVE CONDOS UNIT 304 800 S. MILL STREET ASPEN, CO 81611 CONSTRUCTION MANAGEMENT PLAN Contact List General Contractor: Rudd Construction 970-927-9119 On Site Superintendent: TBD Safety Officer same as Site Superintendent Erosion Control Officer same as Site Superintendent Community Development Department: 920-5090 Fire Department: 925-5532 non-emergency Police: 920-5400 RFTA: 925-8484 Holy Cross Energy: 970-945-5491 Black Hills Energy: 1-800-563-0012 Aspen Valley Hospital: 970-925-1120 FOR ALL EMERGENCIES CALL 911 01/10/2018 132 Park Avenue Basalt, Colorado 81621 (970) 927-9119 www.ruddconstruction.com - 2 – Table of Contents 1.0 General 1.1 Purpose of plan 1.2 Applicability 2.0 Project introduction 2.1 Disturbance area 2.2 Location 2.3 Description 3.0 Project documentation 3.1 Permits 3.2 Public notification 3.3 Project sign 3.4 Contact designation 4.0 Project implementation 4.1 Dates of construction 4.2 Hours of construction 4.3 Sequence (Phasing) of construction 4.4 Adjoining property owners 4.5 Project fencing 4.6 Public health and welfare 4.7 Natural environment 5.0 Parking management 5.1 Parking Management Form 5.2 Emergency Vehicle Access and Ordinance 35 5.3 Construction parking details 5.4 Staging areas 5.5 Construction trailer, materials storage, and waste management 6.0 Traffic control 6.1 General 6.2 Haul routes 6.3 Onsite vehicle limitations 6.4 Delivery requirements 6.5 Traffic control plan 7.0 Pedestrian Control 7.1 General 01/10/2018 132 Park Avenue Basalt, Colorado 81621 (970) 927-9119 www.ruddconstruction.com - 3 – 8.0 Sediment and Erosion Control 8.1 Requirements 9.0 Fugitive Dust Control 9.1 Fugitive dust control plan 9.2 Requirements 10.0 Emissions 10.1 General 10.2 Emissions from diesel powered equipment 11.0 Noise Suppression 11.1 General 11.2 Noise suppression Plan 11.3 Noise limits and suppression requirements 11.4 Noise level measurements 11.5 Continued Noise Monitoring 11.6 Specific Restrictions related to manufacturing onsite 01/10/2018 132 Park Avenue Basalt, Colorado 81621 (970) 927-9119 www.ruddconstruction.com - 4 – 1.0 General 1.1 The Purpose of this Construction Management Plan is to aid the Contractor and the City of Aspen in the successful operation of the renovation for the 5th Ave Condos Unit 304 interior renovation, with minimal impact to the City of Aspen and its occupants 1.2 This Construction Management Plan (referred to as the CMP for the remainder of this document) shall be used for all Interior Renovation work that Rudd Construction will be performing while working at 5th Ave Condos Unit 304. 2.0 Project Location 2.1 The project disturbance area will be confined to the interior of the unit only. 2.2 See attached plan for disturbance area 2.3 The General Scope of the work is to provide a complete Interior renovation to include new cabinets, fixtures, drywall work and painting. No utility work is planned for the project 3.0 Project Documentation 3.1 The permit for this project has been applied for but has yet to be issued. 3.2 Public Notification; per city guidelines the properties located within 300’ will be notified of the upcoming construction activities and notice shall be posted on site. 3.3 Project Sign will be posted on site per City of Aspen Guidelines 3.4 See Front page of this document for Contact Information and designations 4.0 Project Implementation 4.1 The anticipated dates of Construction are from March 2018 to August 2018. 4.2 The hours of Construction are from 7:30 A.M. to 5:30 P.M. Monday through Friday. Under unusual circumstances there may be a need to work the occasional Saturday from 9:00 A.M. to 5:00 P.M. Rudd Construction does not work on Sundays or Major Holidays. 4.3 No Phasing of this project is required. 4.4 Since this is an interior renovation no adjoining properties should be effected by the construction work. 4.5 Due to the interior nature of the project no fencing is anticipated to be needed. 4.6 Due to the interior nature of the project there should not be any need to protect the health and welfare of the public from dangers of the work 4.7 No tree protection is needed 01/10/2018 132 Park Avenue Basalt, Colorado 81621 (970) 927-9119 www.ruddconstruction.com - 5 – 5.0 Project management 5.1 No Right of way work or use is needed 5.2 Emergency vehicle access will be maintained at all times at both entrances to the complex. 5.3 Parking Management. Rudd will have their personnel and subcontractors park on the site. Given the small size of the project there will be a limited number of employees and trade workers on the site. Rudd has a vanpool set up for other projects that can be utilized if needed for this site, our workers are all required to carpool or use the vanpool 5.4 Staging area will be within the property inside or on the patio area. 5.5 Right of way Limitations: None needed for project 5.6 Please see attached project site plan for all Staging areas and the anticipated Jobsite layout, there are no activities that should encroach on the City of Aspen right of ways. Toilets will be anchored to the ground by either staking or if on concrete by weighted sand bags. All deliveries and haul off of waste materials shall follow the specified official heavy haul route map. 5.7 During mass demo wood will be separated and will be disposed of separately from other materials, a dumpster will be maintained for all non- recycle materials. It is not anticipated to have large amounts of recyclable materials due to the minor nature of the work. All concrete and stone materials shall be kept separate and hauled off as needed. A bear proof dumpster will be provided for the contractors use for food trash. 6.0 Traffic Control 6.1 In the event that traffic control should become necessary for the project Rudd Construction will contract with a certified traffic control company. 6.2 See Attached vicinity map for Haul routes. Rudd Construction will watch and stay within maximum vehicle weights per the CDOT regulations 6.3 Given the limited project size no onsite vehicle limitations are needed 6.4 All Deliveries and load out will be occurring on the property and thus no signage will be required. Deliveries will only be done during normal working hours previously stated in this document. All Idle times will be watched on delivery equipment per the City of Aspen guidelines for idling equipment 6.5 A traffic control plan is not needed for this project 7.0 Pedestrian protection 7.1 Given the site location there should be no need for a pedestrian control plan for this project. 7.2 Limitations None given location 8.0 Sediment and Erosion Control 01/10/2018 132 Park Avenue Basalt, Colorado 81621 (970) 927-9119 www.ruddconstruction.com - 6 – 8.1 No storm water or erosion control measures are needed. 9.0 Fugitive dust control 9.1 None needed 10.0 Emissions 10.1 Rudd Construction maintains the minimum amount of equipment on site to accomplish the project tasks. All of this equipment is professionally maintained to keep the emissions below the acceptable levels. Idle times and warm up times will be monitored and kept within the standards set forth by the city. 11.0 Noise suppression 11.1 Due to the nature of the work happening on site it is anticipated that there will be noise levels greater than 70dB at the lot line. 11.2 Interior work only, no noise suppression measures are anticipated 11.3 None 11.4 None 11.5 None 11.6 None 01/10/2018