HomeMy WebLinkAboutFile Documents.98 Glen Dee Rd.0034.2019.ARBK 1
HealthSafe Inspections Inc
390 Apple Drive
Basalt CO 81621
970-920-2100
Jim Baker
CDPHE Asbestos Building Inspector, Asbestos Air Monitoring Specialist (AMS) &
Project Designer Certification #13437
CDPHE Lead-Based Paint Inspector & Lead Hazard Assessor Certification #23607
ASBESTOS REPORT
DATE
01/23/2019
CLIENT
Sam & Belinda Oster
PROPERTY ADDRESS
98 Glen Dee Road, Highlands Villas #10, Aspen, Colorado 81611
CLIENT BACKGROUND & CONCERNS
The Clients, Sam & Belinda Oster, hired HealthSafe Inspections, Inc. (hereinafter,
HealthSafe) to perform a limited asbestos inspection for their kitchen remodel project.
This asbestos report is limited to the kitchen impacted floor, ceiling and walls only.
01/30/2019
2
VISUAL INSPECTION & LABORATORY FINDINGS
An inspection was conducted by Jim Baker of HealthSafe on Monday, January 21, 2019
with Sam Oster present during the inspection and sample collecting. All suspect asbestos
containing materials (ACM) or suspect asbestos containing building materials (ACBM)
were identified by their respective homogenous materials reflecting the same in
consistency, appearance and application/installation date(s) and sampled randomly
respective to the scope of those materials slated for disturbance-demolition-disposal
(DDD). Those materials collected and analyzed by EPA 600 Method PLM analysis are
the following:
1. Kitchen Sheet Vinyl Flooring, a homogeneous miscellaneous flooring material
requiring a minimum of at least two samples [samples 1-2: K-SV-1,2], collected
from the northwest corner and southeast corner, respectively. The PLM analytical
estimated results: NONE DETECTED.
2. Kitchen Knock-Down Texture, a homogeneous spray-applied and troweled
surfacing material/texture [samples 3-5: K-KD-1,2,3], collected from the kitchen
ceiling, west side and north sides of the kitchen backer walls, respectively. This
surfacing material/texture is on ceilings and walls of the kitchen and vicinity. The
estimated impact area of DDD is more than 10 sf, but less than 1,000 sf, requiring
a minimum of at least three surfacing/texture material samples. The PLM
analytical estimated results: NONE DETECTED.
3. Kitchen Drywall System Joint Compound: a homogeneous miscellaneous seam
taping compound requiring at least two samples [samples 6-7: K-JC-1,2],
collected from the kitchen entry backer wall outside corner and the west upper
soffit outer corner, respectively. This material is applied to the kitchen drywall
system. The PLM analytical estimated results: NONE DETECTED.
4. Kitchen Composite-Layered Drywall System, a homogeneous taped and joint
compounded drywall system (classified as a miscellaneous material as a complete
integral system) [sample 8: K-J], collected from the inside southwest corner of the
dining room side of the kitchen backer wall. These composite layered taped and
joint compounded drywall materials are on ceilings and walls of the kitchen with
a knock-down surfacing material/texture. The estimated impact area of DDD is
more than 10 sf, but less than 1,000 sf (<200 sf), requiring a minimum of at least
a single composite core sample of all drywall layers in conjunction with the joint
compound samples in paragraph 3 above. The PLM analytical estimated results:
NONE DETECTED.
A total of 8 suspect homogeneous ACM/ACBM bulk samples were collected and 8
samples were analyzed. The bulk samples were analyzed by EPA 600 PLM analytical
methods by a NVLAP accredited laboratory in accordance with Colorado State
Regulation 8 for the presence of asbestos mineral fibers. There is NO asbestos in all 8
samples.
See supporting Hayes Microbial Consulting, Inc. data report #19002914.
01/30/2019
3
HEALTHSAFE CONCLUSIONS
• There is NO asbestos in any of the kitchen suspect building materials slated for
DDD. NO asbestos abatement will be required for any of the kitchen-related
building materials. All building waste and debris can be disposed of in any landfill
which accepts normal, non-hazardous building waste.
Sincerely Submitted,
Jim Baker
COLORADO & FEDERAL ASBESTOS REGULATIONS SUMMARY
Regulation No. 8 Part B – Asbestos of the Colorado Department of Public Health and
Environment (CDPHE), Air Quality Control Commission requires a State-certified
Asbestos Building Inspector to inspect and collect bulk samples of all suspect asbestos
containing materials (ACM) or suspect asbestos containing building materials (ACBM)
prior to their disturbance, removal or demolition and disposal. The suspect materials shall
be analyzed by a NVLAP accredited laboratory by polarized light microscopy (PLM)
using EPA 600 analytical method. A material which is estimated to contain more than 1%
asbestos is classified as ACM/ACBM and regulated by the State and Federal
governments. Any friable (able to crush or reduce to powder by finger pressure) asbestos
with trace amounts of asbestos fibers or less than 1% must be point-counted using EPA
400 analytical method to prove that it is indeed less than 1%; if not, it must be classified
as ACM/ACBM and shall be treated as a State and Federal regulated material. Any
friable asbestos containing material (greater than 1% asbestos concentration) or
ACM/ACBM that could be rendered friable during its removal or demolition and disposal
shall require an asbestos abatement by a certified asbestos abatement contractor to
remove and dispose of the material(s).
A Colorado State (CDPHE) issued asbestos abatement permit is required for the
following trigger levels of ACM/ACBM:
1. Residential buildings of four or fewer units--if more than 32 square feet of any
surface coverage (e.g., gypsum wallboard or drywall and associated applied surfacing
01/30/2019
4
materials/textures, acoustic sprays, joint compounds, plaster, etc.), 50 feet of asbestos
covered or asbestos insulated pipe or any material which would fill a 55-gallon drum is
going to be disturbed, removed or disposed of, an asbestos abatement permit is required.
2. Residential complexes with more than four residential units, public access areas to a
residential building, commercial and retail buildings, public and civic buildings,
industrial buildings--if more than 160 square feet of surfacing materials, 260 linear feet
or more than 35 cubic feet (NESHAP) or 55-gallon drum (CDPHE) of suspect
ACM/ACBM is going to be disturbed, removed or disposed of, an asbestos abatement
permit is required under NESHAP and by the CDPHE. See note below on OSHA.
The regulations require an absolute minimum of 3 samples (EPA suggests 9) per
homogenous suspect surfacing and TSI materials and an absolute minimum of 2 samples
of homogenous miscellaneous materials or any number of “samples sufficient to
determine whether a material is ACM” (Reg8.IV.D.3). More samples are required based
on surface area or volume. These are minimums; the asbestos building inspector has the
field responsibility to determine homogenous materials and the number of samples to
collect per material; more than the minimum number of samples may be necessary at the
discretion of the inspector. An assessment of friability and functional space conditions of
the materials are also the inspector’s field responsibilities.
OSHA compliance is required for all employers and employees no matter the
quantity of asbestos present with strict regulations regarding 10 sf or more of TSI or
friable surfacing materials, and therefore it does not matter what the quantity or
State trigger levels are: all suspect ACM/ACBM shall be inspected and tested for
asbestos prior to their disturbance, removal and disposal for worker protection and
safety. See EPA 40 CFR 763.121 Worker Protection Rule, OSHA 29 CFR 1910.134
Respirator Protection Standard, OSHA 29 CFR 1910.1001 General Industry Standard and
OSHA 29 CFR 1926.1101 Construction Standard regulations when dealing with asbestos
hazards.
Note: County or City regulations may be more stringent.
01/30/2019
HMC #19002914
contact@hayesmicrobial.com
http://hayesmicrobial.com/
Analysis Report prepared for
HealthSafe Inspections
390 Apple Drive
Basalt, CO. 81621 USA
Phone: 970-920-2100
Job Name: Oster
98 Glen Dee Rd. #10
Aspen, CO 81611
Date Sampled: 01-21-2019
Date Analyzed: 01-23-2019
Report Date: 01-23-2019
EPA Laboratory ID# VA01419
NVLAP Lab Code: 500096-0 Asbestos License: 300435 License: #PH-0198
Page 1 of 4
01/30/2019
HMC #19002914
HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621 USA
January 23, 2019
Client Job Number:
Client Job Name:Oster
98 Glen Dee Rd. #10
Aspen, CO 81611
Dear HealthSafe Inspections,
We would like to thank you for trusting Hayes Microbial for your analytical needs. On January 23, 2019 we received 8 samples by FedEx for the job
referenced above. 8 samples were received in good condition.
The results in this analysis pertain only to this job, collected on the stated date and should not be used in the interpretation of any other job. This report
may not be duplicated, except in full, without the written consent of Hayes Microbial Consulting, LLC.
This laboratory bears no responsibility for sample collection activities, analytical method limitations, or your use of the test results. Interpretation and
use of test results are your responsibility. Any reference to health effects or interpretation of mold levels is strictly the opinion of Hayes Microbial
Consulting. In no event, shall Hayes Microbial Consulting or any of its employees be liable for lost profits or any special, incidental or consequential
damages arising out of your use of the test results.
Steve Hayes, BSMT(ASCP)
Laboratory Director
Hayes Microbial Consulting, LLC
Page 2 of 4
01/30/2019
HMC #19002914
EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621 USA
Phone: 970-920-2100
Job Number:
Collected by:
Email:
Jim Baker
healthsafeinspections@gmail.com
Job Name:Oster
98 Glen Dee Rd. #10
Aspen, CO 81611
Date Collected:
Date Received:
Date Reported:
01/21/2019
01/23/2019
01/23/2019
#Sample Name Description Asbestos Fibers Other Fibers Non- Fibers
1 1 K-SV-1 Vinyl Floor / White
(None Detected)
15 % Cellulose fibers
85 %
2 2 K-SV-2 Vinyl Floor / White
(None Detected)
(None Detected)
100 %
3 3 K-KD-1 Brittle / White
(None Detected)
(None Detected)
100 %
4 4 K-KD-2 Brittle / White
(None Detected)
(None Detected)
100 %
5 5 K-KD-3 Brittle / White
(None Detected)
(None Detected)
100 %
6 6 K-JC-1 Joint Compound / White
(None Detected)
(None Detected)
100 %
7 7 K-JC-2 Joint Compound / White
(None Detected)
(None Detected)
100 %
8 8 K-J Drywall / White/Brown
(None Detected)
12 % Cellulose fibers
88 %
Layer 2 K-J Joint Compound / White
(None Detected)
(None Detected)
100 %
Layer 3 K-J Drywall/Joint Compound / White
(None Detected)
(None Detected)
100 %
Notes: Composite of Drywall and Joint Compound.
Signature: Date:01/23/2019 Reviewed by: Date:01/23/2019
Page 3 of 4
01/30/2019
HMC #19002914
Asbestos - Additional InformationHealthSafe Inspections
390 Apple Drive
Basalt, CO 81621 USA
Phone: 970-920-2100
All samples were received in acceptable condition unless otherwise noted on the report. This report must not be used by the client to claim product certification, approval, or
endorsement by AIHA, NIST, NVLAP, NY ELAP, or any agency. The results relate only to the items tested. Hayes Microbial Consulting reserves the right to dispose of all samples
after a period of 60 days in compliance with state and federal guidelines.
All Polarized Light Microscopy (PLM) results include an inherent uncertainty of measurement associated with estimating percentages by PLM. Measurement uncertainty data can be
provided when requested.
'None Detected' - Below the detected reporting limit of 1% unless point counting is performed, then the detected reporting limit is .25%.
Per NY ELAP198.6 (NOB), TEM is the only reliable method to declare an NOB material as Non-Asbestos Containing.
Any NY ELAP samples that are subcontracted to another laboratory will display the name and ELAP Lab Identification number in the report page heading of those samples. The
original report provided to Hayes Microbial Consulting is available upon request.
Signature: Date:01/23/2019 Reviewed by: Date:01/23/2019
Page 4 of 4
01/30/2019
01/30/2019
01/30/2019