HomeMy WebLinkAboutFile Documents.614 North St.0248.2017 (50).ARBK�e 1 of 7
p�
ZONING REVIEW CHECK LIST
Date: E C� (g Permit
Address: (n✓- r✓G Legal:
Parcel ID#
v� act-r, 1X-XX_
Zone District: r
Scope of work:
❑ New Construction ❑ Remodel/ Addition ❑ Demolition/ Relocation ❑ Single Family
❑ Duplex ❑ Accessory Structure ❑ Commercial ❑ Lodging ❑ Mixed -Use
❑ Multi — Family Number of Units []Employee Housing Number of Units _
Approvals Attached? _ Variances?
Approvals
Resolution
Ordinance
Reception number, book and page, etc.
Aspen City Council
HPC
P&Zl
Administrative
Variances
Other
Approval Drawings Attached? _ HOA Form? Zoning Compliance Form_
Notes:
SURVEY:
SURVEY HAS: / �l
Steep Slopes
20-30%
30%+
Easements
_
Property Lines
`
Fences
Topographic lines
Page 2 of 7
Lot Size Reductions:
20-30%
X 50%
_
30%
'X 100%
—
Easement
X 100%
_
TOTAL
=
GROSS LOT SIZE TOTAL REDUCTIONS NET LOT AREA
L H) 6--�; ,� 6-S
SITE: g /{/
Setbacks? Building Envelope? ' V Setbacks from approvals?
Zoning Rules: .
Front
Id
Side
1 S
Combined Side
I'
Rear
101
1 Garage
1 9
Distance Between Buildin
Minimum size lot needed per zoning: Single Familv I I Duplex
Site plan?
SITE PLAN HAS:
Property Lines
Setbacks
Buil' Envelo e
Fences
Pm+.ing
# of spaces I
I AC units
Patios
Micropile or Ground nails? Shown as within property lines?
Notes:
Page 3 of 7
FLOOR AREA: Net Lot Area
Gara e - 250 = 1250 then /2 = I Add to FA
> 250 then -125 = 1 Add to FA
Allowed FA
I Existing FA
I Proposed FA
1. New Additional FA
161 R, ri--
1 2 -7 ' ' 67r02- 1
Z 7 v -7 33
Allowed Deck
Proposed Deck
Deck being added to FA
DUPLEX:
Unit A:
1 Proposed FA:
Credit:
Unit B:
I Pro posed FA:
Credit:
Notes:
1 /!
HEIGHT Arch 1 U 0 ! = Site -78 `71 - 9
Hei t over Topography sheet? I I Sheet #
Maximum allowable Height I I Per Zoning? Per An ovals?
Elevations:
Max Height Line Shown? Natural Grade shown and labeled?
Finished Grade shown and labeled?
Notes: W,-C^ /!5
Page 4 of 7
LIGHTING
Exterior Light Plan? Pictures of Li is
Notes:
RDS
Signed Checklist?
Notes: R.j) S
Impact Fees:
Fees Waived?
Per
School land
TDM Parks
Existing SF
/1,000 x .16 —
FTE's
(First 4,500SF)
.32 =
FTE's
(Greater than 4,500SF)
Total Existing
FTE's
_
Proposed SF
/1,000 x 16 =
FTE's
(First 4,500SF)
32 =
FTE's
(Greater than 4,500SF)
Total Proposed
FTE's
Amount of FTE's applicant must mitigate for
If < or = .1 than use A below
If >.1
than use B below
A) FTE's: x $320,186 =
B) Can use all credits or a combination of .1 cash plus credits
Notes:
Page 5 of
COMMENTS:
1. Site Plan:
2. FA:
Page 6 of 7
3. Height:
4. Lighting:
OW7IM
6. Fees:
Page 7 of 7
7. Other