It appears that the existing water
service line is within close
proximity of the new column
footings. It should be confirmed
with the civil engineer that the
water line will not be negatively
affected with operation and also
any future
maintenance/replacement.
17.042C 614 W North Remodel - Permit 2017-10-02.pdf (1)
Page:[7] C-103 GRADING AND DRAINAGE
Author:justinf
Date:1/18/2018 10:13:58 AM
File Name: Civil Plans.614 W North St.2017.09.pdf
Please show drywell clearances
from column footings and
existing water service line once
installed. Confirm that
foundations and water line will
not be negatively affected by
drywell drainage. Standard City
clearance from service lines is
10 feet for drywell.
Civil Plans.614 W North St.2017.09.pdf (2)
Page:[7] C-103 GRADING AND DRAINAGE
Author:justinf
Date:1/17/2018 4:33:35 PM
File Name: Civil Plans.614 W North St.2017.09.pdf
Please provide
excavation/stabilization detail
that shows how drywell will be
installed. Please show that
layback or shoring will not
negatively affect trees, waterline,
and new column footings.
Please note that City does not
allow layback into ROW.
Page:11
Author:justinf
Date:1/18/2018 8:19:06 AM
File Name: Drainage Report.614 W North St.2017.10.pdf
Please show on plans. It
appears that at least one new
column footing is closer than 10
feet. Reference Structural
Drawings.
Drainage Report.614 W North St.2017.10.pdf (1)
D
C 5'-103/8"5'-15/8"5'-106
S6.001
12" DIA CONC PEDESTAL w/
(4) #5 VERT & #3 @ 12"o.c. -
TYP @ (4) LOCS
F2
F2
F2
It appears that the
existing water service
line is within close
proximity of the new
column footings. It
should be confirmed
with the civil engineer
that the water line will
not be negatively
affected with
operation and also
any future
maintenance/replace
ment.
Please show drywell
clearances from
column footings and
existing water service
line once installed.
Confirm that
foundations and
water line will not be
negatively affected by
drywell drainage.
Standard City
clearance from
service lines is 10feet for drywell.
Please provide
excavation/stabilization
detail that shows how
drywell will be installed.
Please show that
layback or shoring will
not negatively affect
trees, waterline, and new
column footings. Please
note that City does not
allow layback into ROW.
collects all runoff from the site and is designed to have capacity f
ons are proposed for the drywell, rather than the standard 4 feet. T
16 feet deep, with 10 feet of storage capacity. It is 10 feet away fro
Please show on plans. It
appears that at least one new
column footing is closer than
10 feet. Reference Structural
Drawings.
A callout has been added to sheet C-104 to pothole the water
service line at the proposed column, prior to construction.
Contractor shall contact design engineer if service line
conflicts with column installation.
Dimensions have been added to sheet C-104 for drywell
clearances. A variance has been submitted with this submittal
for drywell location within 10' of the residence and the property
line. An updated drywell detail has been added to sheet C-501.
Insulation will be installed around the existing water service
when it is within 7' of the drywell.
A stabilization plan has been provided with this submittal
showing how the drywell will be installed.
The drainage report has been updated and describes that an
impermeable liner has been added, which will direct water away
from the structural columns and supporting soils.
2/27/2018