Loading...
HomeMy WebLinkAboutagenda.apz.202206211 AGENDA ASPEN PLANNING & ZONING COMMISSION June 21, 2022 4:30 PM, WebEx Virtual Meeting (See agenda packet for instructions to join the meeting) I.VIRTUAL MEETING INSTRUCTIONS TO JOIN ONLINE: Go to www.webex.com and click on "Join a Meeting" Enter Meeting Number: 2554 197 1613 Enter Password: 81611 Click "Join Meeting" -- OR -- JOIN BY PHONE Call: 1-650-479-3208 Enter Meeting Number: 2554 197 1613 Enter Password: 81611 II.ROLL CALL III.COMMENTS IV.MINUTES None V.DECLARATION OF CONFLICT OF INTEREST VI.PUBLIC HEARINGS VI.A.624 E. Cooper Avenue - Commercial Design Review, PUBLIC HEARING 624 E Cooper.Memo.20220621.pdf 624 E Cooper.Resolution Draft.20220621.pdf 624 E Cooper.Exhibit A.Commercial Design Review Criteria.pdf 624 E Cooper.Exhibit B.Referral Comments.pdf 624 E Cooper.Exhibit C.Application.20220621.pdf VII.OTHER BUSINESS VII.A.Requests to Pay Fee-in-Lieu in Providing Affordable Housing Mitigation Recommendation to City Council 1 2 Q2 Staff Memo and Exhibits.pdf Q2_P&Z Resolution.pdf VIII.ADJOURN NEXT RESOLUTION NUMBER: #11, SERIES 2022 TYPICAL PROCEEDING FORMAT FOR ALL PUBLIC HEARINGS 1) Conflicts of Interest (handled at beginning of agenda) 2) Provide proof of legal notice (affidavit of notice for PH) 3) Staff presentation 4) Board questions and clarifications of staff 5) Applicant presentation 6) Board questions and clarifications of applicant 7) Public comments 8) Board questions and clarifications relating to public comments 9) Close public comment portion of bearing 10) Staff rebuttal/clarification of evidence presented by applicant and public comment 11) Applicant rebuttal/clarification End of fact finding. Deliberation by the commission commences. No further interaction between commission and staff, applicant or public 12) Chairperson identified the issues to be discussed among commissioners. 13) Discussion between commissioners* 14) Motion* *Make sure the discussion and motion includes what criteria are met or not met Revised January 9, 2021 2 MEMORANDUM TO: City of Aspen Planning and Zoning Commission FROM: Sarah Yoon, Historic Preservation Planner II THROUGH: Amy Simon, Planning Director MEETING DATE: June 21, 2022 Re: 624 E. Cooper Avenue – Commercial Design Review, PUBLIC HEARING Applicant: Deryk Cave, owner of Mezzaluna Restaurant Representatives: Grant Sutherland Location: 624 E. Cooper Avenue Current Zoning and Use: Commercial (C-1) Summary: The applicant is requesting approval to construct a permanent porch-like structure covering 499 square feet of the adjacent courtyard space that is currently used for outdoor seating. Prior to the COVID-19 exceptions, temporary umbrellas have been used to provide shade for customers seated in this area. STAFF RECOMMENDATION: Staff recommends the Planning and Zoning Commission approve the proposed application. Figure 1: Aerial Image of Site REQUEST OF THE PLANNING AND ZONING COMMISSION (P&Z): The Applicant is requesting the following Land Use approval from the Planning and Zoning Commission. The Planning and Zoning Commission is the final review authority, however, Commercial Design Review is subject to Call-up Notice by City Council. • Commercial Design Review (Section 26.412) to construct a permanent covered porch structure. The Commercial Design Review includes an assessment of the following topics: building materials, design details, and pedestrian amenities. This scope of work is subject to a one-step process that consolidates the conceptual and final review into a single review process. 624 3 Page 2 of 3 BACKGROUND: 624 E. Cooper Avenue is a commercial use building in the Commercial (C-1) Zone District, and the Mezzaluna restaurant is located on the ground level. The adjacent courtyard space was traditionally used as outdoor seating for the restaurant with temporary umbrellas as shading devices during the summer season. In response to the COVID-19 pandemic, the Aspen City Council initiated the Winter in Aspen Vitality (WAV) program to provide flexibility for businesses to stay open and compliant with the public health order. The deadline for this program was extended several times to remain compliant with the evolving conditions of the pandemic and the public health orders. After careful evaluation, staff received clear direction from City Council to proceed with the removal of all temporary outdoor enclosures constructed through this program by May 11, 2022. Owners were given permission to maintain their enclosure if they were actively pursuing proper Land Use approval. PROPOSAL: The applicant proposes to remove the temporary enclosure that was built during COVID-19 and construct a new permanent porch-like overhang with a 3:12 pitch that is open on all sides. The building material proposed for this feature is painted metal columns and beams and a class A roof assembly that will meet structural loads for year-round use. The area covered with this structure is approximately 499 square feet. No doors, walls, or windows are proposed with this design. Figure 2: Structure built during the COVID-19 pandemic Figure 3: Proposed porch cover feature STAFF COMMENTS: The proposed design is a permanent structure that is open on all sides and does not include any permanently affixed features to enclose the space such as screens, windows, or doors. The applicant will need to provide structural details signed and stamped by an engineer and a detailed roof assembly showing the underlayment product for the building permit. As proposed, this structure is exempted from Growth Management Mitigation requirements and the Mountain View Plane Review but subject to Commercial Design Review, specifically related to materials and pedestrian amenities. Commercial Design Review: The project site is in the character area defined as Commercial Area (CA) which consists of commercial architecture predominantly from the modern era. Materials featured in this area include highly textured brick, heavy timbers, and metal. The application of these materials should be subtle and reminiscent of traditional techniques. The metal beams, columns, and roof are all materials found in the character area and have proven durability to withstand Aspen’s climate. See Exhibit A for design guidelines/standards and staff findings. 4 Page 3 of 3 Pedestrian Amenity: The objective behind pedestrian amenity is to create meaningful open spaces that convey human scale and provides vitality at the street level. These spaces are typically open to view from the street, open to the sky, and not permanently enclosed with walls. The guidelines specially call out outdoor seating areas as an appropriate use of pedestrian amenity space. According to the guidelines, pedestrian amenity space should be 25% of the gross lot area of the commercial property. According to the calculations provided in the application, the existing pedestrian amenity space totals 5,330 square feet where 3,199 square feet is required. The design guidelines provide an opportunity for pedestrian amenity to be covered if the street- facing portion is entirely open and approved by a review board (PA1.5). If approved, the area beneath the covered roof would remain in compliance with the Pedestrian Amenity requirements. REFERRAL COMMENTS: The application was referred out to other City Departments who have requirements that may significantly affect the permit review. Please see Exhibit B for full comments. RECOMMENDATION: Staff recommends that the Planning and Zoning Commission approve the request to construct the proposed porch structure with the following condition: 1. Consult with the Parks Department regarding the tree in the existing planter box. PROPOSED MOTION: “I move to approve Resolution #XX, Series of 2022 to construct porch structure as proposed.” EXHIBITS: Resolution #XX, Series of 2022. A. Review Criteria – Commercial Design Review B. Referral Comments C. Land Use Application 5 624 E. Cooper Avenue P&Z Resolution #XX, Series 2022 Page 1 of 2 RESOLUTION #XX (SERIES OF 2022) A RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION GRANTING COMMERCIAL DESIGN REVIEW APPROVAL FOR A PERMANENT PORCH STRUCTURE ON THE PROPERTY LOCATED AT 624 E. COOPER AVENUE, LEGALLY DESCRIBED AS PORTIONS OF LOTS K, L AND M, AND ALL OF LOTS N AND O, BLOCK 100, CITY AND TOWNSITE OF ASPEN, COUNTY PITKIN, STATE OF COLORADO. Parcel ID: 2737-182-25-005 WHEREAS, the Community Development Department received an application for the land use review for the development of 624 E. Cooper Avenue, from Applicant Deryk Cave, Owners of Mezzaluna Restaurant, represented by Grant Sutherland, for Commercial Design Review; and, WHEREAS, the Community Development Department staff reviewed the application for compliance with the applicable review standards; and, WHEREAS, upon review of the application and the applicable Land Use Code standards and Commercial Design Guidelines/Standards, the Community Development Director recommends approval of Commercial Design Review; and, WHEREAS, The City of Aspen Planning and Zoning Commission reviewed and considered the development proposal under the applicable provisions of the Municipal Code as identified herein, reviewed and conserved the recommendation of the Community Development Director and took and considered public comment at a duly noticed public hearing on June 21st, 2022; and, WHEREAS, the City of Aspen Planning and Zoning Commission finds that the development proposal meets the applicable review criteria and that approval of the request is consistent with the goals and objectives of the Land Use Code; and, WHEREAS, the City of Aspen Planning and Zoning Commission finds that this Resolution furthers and is necessary for the promotion of public health, safety, and welfare; and, WHEREAS, The City of Aspen Planning and Zoning Commission approves Resolution #XX, Series of 2022, by a X to X (X-X) vote, granting approval of the Commercial Design Review as identified herein. NOW, THEREFORE BE IT RESOLVED BY THE ASPEN PLANNING AND ZONING COMMISSION: 6 624 E. Cooper Avenue P&Z Resolution #XX, Series 2022 Page 2 of 2 Section 1: Commercial Design Review: Pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal Code, the Commercial, Lodging and Historic District Design Standards and Guidelines, the Planning and Zoning Commission hereby approves the request for Commercial Design Review to construct a permanent porch structure over the courtyard with the following condition of approval: 1. Consult with the Parks Department regarding the tree in the existing planter box. Section 2: Material Representations All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Community Development Department or the Aspen City Council are hereby incorporated in such plan development approvals and the same shall be complied with as if fully set forth herein, unless amended by other specific conditions or an authorized authority. Section 3: Existing Litigation This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 4: Severability If any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED BY THE COMMISSION at its regular meeting on the 21st day of June, 2022. APPROVED AS TO FORM: PLANNING AND ZONING COMMISSION: _______________________________ ___________________________________ Katharine Johnson, Assistant City Attorney Teraissa McGovern, Chair ATTEST: _______________________________ Cindy Klob, Records Manager EXHIBIT A: Rendering and Proposed Site Plan of Approved Porch Structure 7 DATE REVISION NOTES TITLE # PAGE # the PBRworkshop 301 W. HYMAN STE. #6 ASPEN CO 81611 970-274-0481 or amos@pbrworkshop.com 3.21.22 C.O.A. LU APPLICATION N 499 sq.ft. PORCH 38 ' - 5 " 14'-5" 28 ' - 9 " 38 ' - 5 " 14'-5" 28 ' - 9 " 38'-5" 11 ' - 1 1 " 8' - 8 " 19'-4" PRO-PANEL METAL CLASS "A" ROOF SYSTEM METAL COLUMN ATTACH TO ISLAND PLANTER PER ENGR. METAL FLASHING 8' - 8 " 11 ' - 1 1 " 14'-5" ME Z Z A L U N A 62 4 E . C O O P E R A V E . AS P E N , C O L O R A D O 8 1 6 1 1 PA R C E L I D 2 7 3 7 1 8 2 2 5 0 0 5 PROPOSED SOUTH ELEVATION - 1/4" SCALE PROPOSED ROOF PLAN - 1/4" SCALEPROPOSED SITE PLAN - 1" = 10' SCALE PROPOSED WEST ELEVATION - 1/4" SCALE PRO-PANEL METAL CLASS "A" ROOF SYSTEM BENCH ISLAND PLANTER FENCE 3:12 3 12 A 1.0 SITE, ROOF ELEVATION EXHIBIT A: Rendering and Proposed Site Plan of Approved Porch Structure 8 Exhibit A Commercial Design Review, 624 E. Cooper Avenue Review Criteria Exhibit A – Commercial Design Review and Staff Response Page 1 of 4 26.412.060. Commercial Design: Review Criteria. An application for commercial design review may be approved, approved with conditions or denied based on conformance with the following criteria: A. Guidelines and Standards 1. The Commercial, Lodging, and Historic District Design Standards and Guidelines are met as determined by the appropriate Commission. The Standards and Guidelines include design review criteria that are to be used to determine whether the application is appropriate. 2. All applicable standards in the Commercial, Lodging and Historic District Design Standards and Guidelines shall be met unless granted a Variation pursuant to Section 26.412.040.D, Variations. Relevant Commercial Design Guidelines and Standards: General – Materials and Details: 1.22 (Standard) Complete and accurate identification of materials is required. • Provide drawings that identify the palette of materials, specifications for the materials, and location on the proposed building as part of the application. • Physical material samples shall be presented to the review body. An onsite mock-up prior to installation may be required. Staff Findings: Description of proposed material and location provided in the application. Physical samples may be requested at a later time. Staff finds this criterion is met. 1.23 (Standard) Building materials shall have these features: • Convey the quality and range of materials found in the current block context or seen historically in the Character Area. • Convey pedestrian scale. • Enhance visual interest through texture, application, and/or dimension. • Be non-reflective. Shiny or glossy materials are not appropriate as a primary material. • Have proven durability and weathering characteristics within Aspen’s climate. • A material with an integral color shall be a neutral color. Some variation is allowed for secondary materials. Staff Findings: Painted metal beams and columns are proposed for the permanent structure. Metal roof is proposed a neutral brown color and the materials will not have a shiny or glossy finish. Contemporary metal finishes are found in the commercial character area and have proven durability in Aspen’s climate. Staff find this criterion is met. General – Lighting, Service and Mechanical Areas: 1.31 (Guideline) Minimize the visual impacts of utility connections and service boxes. • Group and discreetly locate these features. 9 Exhibit A Commercial Design Review, 624 E. Cooper Avenue Review Criteria Exhibit A – Commercial Design Review and Staff Response Page 2 of 4 • Use screening and materials that compliment the architecture. Staff Findings: All temporary electrical connections to be removed and no new connections are proposed, therefore, no additional screening is required. Staff finds this criterion is met. Pedestrian Amenity – Street Level Pedestrian Amenity (PA1) PA1.3 (Guideline) Street level Pedestrian Amenity spaces should be equal to a minimum of 1/3 of the total Pedestrian Amenity requirement. • For example, a requirement of 300 square feet of Pedestrian Amenity can be comprised of three 100 square feet spaces; but cannot be comprised of one 275 square feet space and one 25 square feet space. Staff Findings: According to the floor area calculations provided by the applicant, 1/3 of the total pedestrian amenity required for this site is approximately 1,056 square feet on the street level. The existing street level pedestrian amenity is calculated at 3,500 square feet. If approved, covered area would still meet Pedestrian Amenity requirements. Staff finds this criterion is met. PA1.4 (Standard) Street level Pedestrian Amenity shall be within 18 inches above or below the existing grade of the street or sidewalk which abuts the space. Staff Findings: The existing street level pedestrian amenity abuts the sidewalk with no visible grade change. This condition is to remain. Staff finds this criterion is met. PA1.5 (Standard) Street level Pedestrian Amenity areas shall be open to the sky. • Direct access to the Pedestrian Amenity from the street is required. • A street level Pedestrian Amenity space may be covered, subject to HPC or P&Z approval. If the space is covered, the street-facing portion shall be entirely open. Staff Findings: The proposed roof will not be open to the sky, but it has direct access to the street and all street-facing portions of the pedestrian amenity is open and viewable from the street. If approved, covered area would still meet Pedestrian Amenity requirements. Staff finds this criterion is met. PA1.6 (Standard) Design meaningful street level space that is useful, versatile, and accessible. • Small unusable spaces are inappropriate. • Consider providing space for future outdoor merchandising or restaurant seating opportunities when designing the space. • Providing good solar access, capturing mountain views, and providing seating is recommended. • Do not duplicate existing nearby open space. • Storage areas, delivery areas, parking areas, or trash areas are not allowed uses within Pedestrian Amenity space. 10 Exhibit A Commercial Design Review, 624 E. Cooper Avenue Review Criteria Exhibit A – Commercial Design Review and Staff Response Page 3 of 4 Staff Findings: This covered area will be used by the restaurant for extra outdoor seating which will provide vitality to the street and utilize the space in a meaningful way. Staff finds this criterion met. PA1.7 (Guideline) Design amenity space that enhances the pedestrian experience and faces the street. • On corner lots, Pedestrian Amenity space may be considered on side streets or adjacent to the alley rather than facing primary streets. Staff Findings: Although this is not a corner lot, the use of the space as outdoor seating for the restaurant will enhance the pedestrian experience and connect pedestrian activity from the street to the pedestrian amenity space. Staff finds this criterion met. PA1.8 (Guideline) Street level Pedestrian Amenity space should reinforce the property line. Consider the context of the block when selecting an appropriate technique. Examples include: • Overhangs: A cantilevered roof or retractable awning that stretches to the property line. • Fences: A low fence, mostly transparent, that allows views into the Pedestrian Amenity space. • Landscape: Low planter boxes. If including trees, the mature tree canopy size should not prohibit views into the amenity space. Hedgerows over 42 inches are prohibited. • Street Furniture: Permanent, fixed benches or other pedestrian-related elements may be considered to establish property lines. • Surface Material: A change in hardscape material to differentiate between Pedestrian Amenity and right-of-way. Staff Findings: The proposed covering is located within the existing street level pedestrian amenity space. There are existing planter boxes, fences and use of hardscape material to differentiate between the public right-of-way and the pedestrian amenity space on private property. Staff finds this criterion met. PA1.9 (Guideline) Street level Pedestrian Amenity may be appropriate on a case-by-case basis within the Commercial Core Historic District. • Consider the existing context of the block . • Clearly define the property line as defined in PA1.8. • In this District, street level Pedestrian Amenity should be subordinate to the line of building fronts. Staff Findings: The existing street level pedestrian amenity and the proposed changes all remain subordinate to the entrance of the buildings. Staff finds this criterion is met. 11 Exhibit A Commercial Design Review, 624 E. Cooper Avenue Review Criteria Exhibit A – Commercial Design Review and Staff Response Page 4 of 4 Commercial Area (C-1) – Architecture 4.2 (Guideline) Variations on traditional 19th-century commercial design are encouraged. • Design solutions should reference some traditional commercial characteristics. These include tall storefront windows, defined entries, and smaller windows on upper levels. • Creative interpretations of 19th-century design is recommended. • Design should support, but not imitate historic architecture. • Properties adjacent to an AspenModern landmark may relate to, but not mimic the AspenModern architecture. This will be addressed on a case-by-case basis, considering the context of the block. Staff Findings: The overall context of this block is more Modern than Victorian, however, the structure is a porch-like feature that references historic characteristics without it being a direct imitation of 19th century design. Staff finds this criterion is met. 4.6 (Guideline) Flat roof forms are appropriate and reinforce the commercial nature of the neighborhood. • Other roof forms may be considered on a case-by-case basis depending on the context of the block, adjacent historic landmarks, and other restrictions such as viewplanes. Staff Findings: Although a flat roof form is utilized for this commercial building, the pedestrian level coverings are pitched in this area. The proposed pitch is in context with the surrounding awnings/coverings associated with this space. Staff finds this criterion is met. Commercial Area (C-1) – Details and Materials 4.7 (Guideline) Large storefronts are recommended on the ground level. • If large storefronts are not used, ground level details should reinforce Staff Findings: Large storefront windows exist and are maintained with this proposal. Architectural details are derived from the existing design of the building. Staff finds this criterion is met. 4.8 (Guideline) If non-traditional materials are used, they should be subtle in appearance and location and applied using traditional techniques Staff Findings: The use of modern materials such as steel I-beams and columns are subtle in appearance and relate to the existing design of the commercial building. Staff finds that this criterion is met. 12 Exhibit B Referral Comments, 624 E. Cooper Avenue Exhibit B – Referral Comments Page 1 of 1 Parks Department Comments : Dave Radeck, david.radeck@aspen.gov 1. Parks would like to see the tree that was removed from the north planter box replaced. The City Forester can suggest species. Building Department Comments: Justin Hahn, justin.hahn@aspen.gov Please see annotated comments provided by the Building Department on the next page. 13 624 E Cooper CDS Building Comments Subject: PlanCheck Page Label: 20 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: Fully engineered structural design for the porch, signed and stamped by an engineer, is required for building permit approval of permanent installation. Mezzaluna Porch Application.pdf (8) Subject: PlanCheck Page Label: 20 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: Provide documentation of class A roof assembly and corresponding detailing. Metal roofing by itself does not accomplish class A rating, an underlayment product will likely be required. Subject: PlanCheck Page Label: 24 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: Show any proposed outdoor heaters or exterior lighting. If exterior lighting is proposed an exterior lighting ComCheck for the building will be required to be submitted for review/approval at building permit. Subject: PlanCheck Page Label: 24 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: Snow stops are required along the lower edge of the porch. Subject: PlanCheck Page Label: 24 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: Provide an updated seating plan under the porch for building permit that shows compliant egress from all existing building exits and provides compliant accessible dining options and route. Fully engineered structural design for the porch, signed and stamped by an engineer, is required for building permit approval of permanent installation. Provide documentation of class A roof assembly and corresponding detailing. Metal roofing by itself does not accomplish class A rating, an underlayment product will likely be required. PRO Show any proposed outdoor heaters or exterior lighting. If exterior lighting is proposed an exterior lighting ComCheck for the building will be required to be submitted for review/approval at building permit. 1'-11" 1'-11" 3 1 Snow stops are required along the lower edge of the porch. Provide an updated seating plan under the porch for building permit that shows compliant egress from all existing building exits and provides compliant accessible dining options and route. 14 Subject: PlanCheck Page Label: 24 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: Provide engineered design/detailing for porch structure connection at the existing building. Subject: PlanCheck Page Label: 24 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: Dimension the clear head height under the lowest portion of the porch roof to demonstrate compliance with IBC 1003.2. Subject: PlanCheck Page Label: 26 Author: justinh File Name: Mezzaluna Porch Application.pdf Color: The columns for the porch structure require proper support to frost depth. It's unclear whether that is being provided from the exploration, be sure the proposed design is compliant in this regard. 14'-5" OSED ROOF PLAN - 1/4" SCALE 3 12 Provide engineered design/detailing for porch structure connection at the existing building. 11'-11" 8'-8" 8'-8"11'-11" 14'-5" PROPOSED SOUTH ELEVATION PROPOSED ROOF PLAN - 1/4" SCA ALE 3 12 Dimension the clear head height under the lowest portion of the porch roof to demonstrate compliance with IBC 1003.2. DATE REVISION NOTES TITLE # PAGE # the PBRworkshop 301 W. HYMAN STE. #6ASPEN CO 81611970-274-0481 or amos@pbrworkshop.com 3.21.22 C.O.A. LU APPLICATION N MEZZALUNA 624 E. COOPER AVE. ASPEN , COLORADO 81611 PARCEL ID 273718225005 #1 FOUNDATION EXPLORATION#2 FOUNDATION EXPLORATION CONCRETE UNDERSLAB CONCRETE UNDERSLAB 5" THCK. FINISH SLAB 4" THCK BRICK PAVER 2" THCK. OVER 1" SAND BASE +0" +4" +22" T.O.SLAB T.O. WALL T.O. FINISH SLAB 12/2/21 FOUNDATION EXPLORATIONDONE BY CHIP PATTERSON 970-948-9566 A 2.0 FOUNDATIONEXPLORATION The columns for theporch structure requireproper support to frostdepth. It's unclearwhether that is beingprovided from theexploration, be surethe proposed design iscompliant in thisregard. 15 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 LAND USE APPLICATION APPLICANT: REPRESENTIVATIVE: Description: Existing and Proposed Conditions Review: Administrative or Board Review Required Land Use Review(s): Growth Management Quota System (GMQS) required fields: Net Leasable square footage Lodge Pillows Free Market dwelling units Affordable Housing dwelling units Essential Public Facility square footage Have you included the following? FEES DUE: $ Pre-Application Conference Summary Signed Fee Agreement HOA Compliance form All items listed in checklist on PreApplication Conference Summary Name: Address: Phone#: email: Address: Phone #: email: Name: Project Name and Address: Parcel ID # (REQUIRED) 16 17 624 E. COOPER AVENUE MEZZALUNA "PORCH" LAND USE STANDARDS REPORT March, 21 2022 PARCEL ID# 273718225005 Contents: Page: Cover Image 1 Contents 2 Summary Letter 3 Description 4 Code Analysis 5-17 Process Sketch 18 Drawing Package 19-24 HCE Survey Contract 25-30 Proof of Ownership Documents 31 Legal Description 32 Vicinity Map 33 Signed Fee Agreement 34 HOA Agreement Document 35 Pre-Application Conference Document 36-39 18 Summary Letter March 21, 2022 Mr. Kevin Reyes City of Aspen - Planner of the Day 427 Rio Grande Pl Aspen, Colorado 81611 Re: Making permanent the existing porch at Mezzaluna - PID 273718225005 Dear Mr. Reyes, Please find attached to this letter; a land use application for OPTION1: Pursue Land Use Approval to make permanent the existing porch structure at 624 E. Cooper Ave, Mezzaluna. As you are aware, in 2020, a temporary roof structure was erected in the courtyard of the Hunter Plaza building, through an exemption response to COVID-19 Health Department requirements. For the past two years, this temporary structure has provided Mezzaluna with an area for socially distanced seating during restaurant operational hours and public use/access during the remainder. The current temporary roof structure can remain until May 1, 2022. The applicant proposes to reduce the existing structure to 499 sq.ft., remove all side- walls, drop downs, and the temporary electrical service. Based on these modifications, the proposed structure is a porch by definition of the City of Aspen Land Use Code. The application responses for General Review Criteria, Pedestrian Amenity Space, and Commercial Character Area are based upon the above definition. Please note this application is submitted without the requested survey, dated within one year. Included, is a survey from 1998, a survey from 2006, and a current contract for survey services from High Country Engineering. No substantial change to the survey is expected. The applicant requests that this application be accepted as complete and processed with the understanding that a current survey will be obtained prior to any P&Z hearings. Awaiting the updated survey (7-8 weeks) will cause bring the trigger date of May 1, 2022, and either removal of the existing structure or threat of daily fines. Thank you for your review, and we look forward to working with you on this project. Deryk Cave & Grant Sutherland owners of Mezzaluna Restaurant 19 Description Mezzaluna is a locally-owned and operated restaurant offering inexpensive eats and drinks for the past 35 years. Mezzaluna Aspen opened in 1987 as an original tenant of the newly completed Hunter Plaza building located along the North side of the 600 block of E. Copper Ave. Hunter Plaza is a single building of approximately 9,506 sq.ft., separated into eight (8) units. The building is flanked either-side; Chateau Aspen to the East and currently the James Pearce Store (Ozzies Shoes) to the West. The North property line abuts the alleyway. The South of the building is set back from Cooper Avenue and the sidewalk. A large street facing courtyard opens to the street mid-block. It is divided by three (3) one hundred (100") square inch brick island planters. They are equally spaced and offer an elevation transition from East to West. The building facade is a repetitive pattern of brick facade and commercial storefront glass bay windows. Each repetition is shrouded by an oversized and exposed painted steel post and I-beam detail. Metal awning framework protrude from each shroud of bay windows offering slight protection. Mezzaluna has always used approximately 50% of the courtyard for outdoor dining. Historically, oversized umbrellas were used to protect diners from rain & sun but only on a temporary basis as Aspen winters tended to reduce the life span of installations. In 2020, a temporary roof structure was erected in the courtyard through an exemption response to COVID-19 Health Department requirements. It was temporarily permitted as a 732 sq.ft. structure and as-built at 685 sq.ft. For the past two years, this temporary structure has provided Mezzaluna with socially distanced seating during restaurant operational hours and public use and access during the remainder. The roof structure was slatted for removal to the dump by April 30 of 2021. This date was extended due to the continuation of the COVID pandemic by the City Council and is now May 1, 2022. This application to make the existing structure permanent includes the following alterations; reduce the existing footprint of the porch roof to 499 sq.ft. Remove the temporary structure of three (3) wood posts and replace with two (2) steel columns. Each column would be affixed to the northern two island planters. The structural review will by Albright& Associates at time of building permit application. Initial discovery has already been completed. The existing roof will be reduced in size and remain as a 3:12, shed pitch, 'class A' metal pro-panel roof, brown in color. Mezzaluna could be considered an institution in the restaurant field. The porch structure will replace past years of umbrella matrices and allow a local business to remain in downtown Aspen. 20 Code Analysis City of Aspen Land Use Code and Commercial, Lodging and Historic Design Standards in small font;  Applicant Response is in bold 624 E. Cooper Ave. at the Hunter Plaza Building PID 273718225005 Zone District:        Commercial C‐1 Character Area:        Commercial Area Lot Size:         12,794 sq.ft. (gross and net) Existing Footprint: 9,506 sq.ft.     Proposed Porch: 499 sq.ft Definitions ‐ Sec.26.104.100. Porch. An uninsulated, unheated area under a roof, enclosed on at least one (1) side by an exterior wall of a building and open  on at least two (2) sides to the outdoors, with or without screens. 1. Commercial Design Review A. General Review Criteria All General review criteria should be addressed. Particular attention should be given to the criteria related to Materials and Details  (1.22‐1.25). For example, materials should have proven durability and weathering characteristics within Aspen’s climate.  Additionally, materials should be non‐reflective. Shiny or glossy materials are not appropriate as a primary material. 1.1 All projects shall provide a context study. 1.1 Property line of subject property is shown in AQUA. Adjacent parcels are shown in  BLUE  21 1.2 All projects shall respond to the traditional street grid. 1.2 Orientation of the proposed porch follows the street grid and parallels the existing  buildings and the City of Aspen street grid layout. 1.3 Landscape elements should complement the surrounding context, support the street scene, and enhance  the architecture of the building. 1.3 The landscape of the courtyard is a concrete slab over radiant heating and multiple  floor drain locations. The courtyard is divided by three large island planters. Each are  100" by 100" and rise above the ground +/‐28" offering an excellent place to sit. The  center island has large stone sculpture surrounded by a water feature. The south  planter contains a single mature ash tree. The north planter contains seasonal flower  plantings.  1.4 Where there is open space on a site, reinforce the traditional transition from public space, to semi‐public  space to private space. 1.4 The proposed porch reinforces the transition from the public sidewalk to a shared  outdoor seating area to Mezzaluna. The temporary structure nearly reached to south  sidewalk. The proposed porch is set back from the sidewalk. It is also lower than the  existing parapet roof helping to transition from public area to semi‐private outdoor  seating area. 1.5 Maintain alignment of building facades where appropriate. 1.5 The building maintains its alignment and is appropriate. No change is proposed to  the primary building.  1.6 When a building facade is set back, define the property line. Review the context of the block when  selecting an appropriate technique. 22 1.6 Street furniture in the form of a bench helps to define the setback along the South  property line. The island planters also help to give definition. 1.7 Develop alley facades to create visual interest.  1.7 No changes are proposed to the Alley facade. Focus and visual interest is on the  Aspen Art Museum across the alleyway.  1.8 Consider small alley commercial spaces, especially on corner lots or lots with mid block access from the  street. 1.8 Alley access is provided and will remain at a mid block location. 1.9 Minimize the visual impacts of parking. 1.9 This property does not provide on‐site parking. 1.10 A new building should appear similar in scale and proportion with buildings on the block. 1.10 A new building is not proposed in this application. The proposed porch is ancillary  to the building mass and is in scale with the surrounding context of the block. 1.11 A minimum building height difference of 2 feet from immediately adjacent buildings is required. 1.11 A new building is not proposed in this application. The proposed ancillary porch is  more than 2 feet below the building it is attached to. 1.12 On lots larger than 6,000 square feet, break up building mass into smaller modules. 1.12 The lot is larger than 6,000 sq.ft. The proposed porch helps to break up the mass  of the building by offering variation to height and asymmetry to the courtyard. 1.13 Development adjacent to a historic landmark should respond to the historic resource. 1.13 Does not apply to this application. 1.14 Commercial entrances shall be at the sidewalk level and oriented to the street. 1.14 A double glass door entrance to Mezzaluna is oriented toward Cooper Avenue. 1.15 Incorporate an internal airlock or air curtain into first floor commercial space. 1.15 Mezzaluna has an internal airlock accessed either side by double glass doors.  1.16 Entries that are significantly taller or shorter than those seen historically or that conflict with the  established scale are highly discouraged. 1.16 The entry to Mezzaluna has remained the same for 35 years. It reflects the  context of the block. It is the fabric of the block. 1.17 ATM's and vending machines visible from the street are prohibited. 23 1.17 No ATMS or venting machines are visible from the street.  1.18 The roofscape should be designed with the same attention as the elevations of the building. 1.18 The proposed porch does not include an mechanical equipment or solar panels.  The design is shed in style and gently slopes to the West. A simple gutter collects  storm water and distributes it into the island planters. At its highest, the porch roof is  36" below the adjacent flat roof of the existing building. 1.19 Use materials that complement the design of the building facade. 1.19 The proposed porch uses two (2) metal columns and one (1) I beam that relate, at  a reduced size, to the metal detail of the existing buildings' facade. The joists remain  exposed wood and carry a traditional 'class A' pro‐panel roof system. These materials  have shown excellent sustainability over the past two years. 1.20 Incorporate green roofs and low landscape elements into the rooftop design where feasible. 1.20 A green roof is not feasible.  1.21 Minimize visibility of rooftop railings. 1.21 This application does not include any rooftop railings. 1.22 Complete and accurate identification of materials is required 1.22 The proposed porch uses three materials; steel, wood, and metal trim. The  structure is made from two (2) painted metal columns and one (1) painted metal I‐ beam. Wood joists span from the proposed I beam to the existing I beam of the  primary mass. Atop the joists is a brown colored pro‐panel roof. Painted metal  flashing at eaves and gable end. 24 1.23 Building materials shall have these features:  Convey the quality and range of materials found in the current block context. Convey pedestrian scale. Enhance visual interest through texture, application, and/or dimension. Be non-reflective. Shiny or glossy materials are not appropriate as a primary material. Have proven durability and weathering characteristics within Aspen’s climate. A material with an integral color shall be a neutral color. Some variation is allowed for secondary materials. 1.23 The building materials used in the construction of the porch convey the quality  and range of materials found along Cooper Avenue. The metal roof used has a dull  brown color that is both non‐reflective and secondary to the existing brick facade  color. In addition, the steel columns and I beam will be matched in black matte paint  that will relate to the existing metal detail of the principal buildings' facade as well as  protect the structure from the environment.  1.24 Introducing a new material, material application, or material finish to the existing streetscape may be  approved by HPC or P&Z if the following criteria are met:  Innovative building design. Creative material application that positively contributes to the streetscape. Environmentally sustainable building practice. Proven durability. 1.24 The materials used to construct the porch have shown proven durability save the  replacement of temporary wood posts for steel columns. The roof of the porch was re‐ used from a previous project and can be considered an environmentally sustainable  building practice.  1.25 Architecture that reflects corporate branding of the tenant is not permitted. 1.25 The architecture does not reflect a corporate brand or Mezzaluna.  1.26 The design of light fixtures should be appropriate to the form, materials, scale, and style of the building. 1.26 No exterior lighting fixtures are proposed in this application.  1.27 Trash and recycle service areas shall be located along an alleyway where one exists, and screened from  view with a fence or door. 1.27 No change is proposed to the existing trash and recycle area. It remains along the  alleyway and is screened from view.  1.28 Design trash and recycle areas thoughtfully and within the style of the building, with the goal of  enhancing pedestrian and commercial uses along alleys. 1.28 No change is proposed to the trash and recycle area. It remains along the  alleyway and is screened from view.  1.29 Delivery areas shall be located along an alleyway where one exists. 1.29 No change is proposed to the delivery area. It is located along the alleyway.  1.30 Mechanical equipment, ducts, and vents shall be accommodated internally within the building and/or co‐ located in the roof. 1.30 No change is proposed to any mechanical equipment, ducts, or vents.  25 1.31 Minimize the visual impacts of utility connections and service boxes. 1.31 All temporary electrical service will be removed. The proposed porch does not  include utility connections or service boxes.   1.32 Transfromer location and size are dictated by City and utility company standards and codes. 1.32 No change proposed to transformer location or size.   1.33 All remodel projects shall meet Standards 1.22 and 1.23. 1.33 See response to Standards 1.22 and 1.23.  1.34 Consider updating windows, doors, and/ or primary entrances to better relate to the Character Area and  pedestrian experience. 1.34 This application does not propose any doors or windows. The porch will be open  on three sides. The fourth side is connected to the building facade allowing the store  front bay windows to read through to passing pedestrians. The porch offers  pedestrians an optional shelter.  1.35 Design alterations to relate to the existing building style and form that may remain. 1.35 The use of exposed steel columns and I beam relate back to the existing building  style which contains larger scale versions in the facade. The proposed porch design is  minimal and simple.  1.36 Incorporate elements that define the property line in accordance with Guideline 1.6. 1.36 A bench currently sits parallel to the South property line giving definition. The  proposed porch is set back from and parallel to the South property line helping to  define depth.  1.37 Creative solutions that incorporate ADA compliance into the architecture are encouraged. 1.37 The reduction of support posts help incorporate ADA compliance by reducing  impasses areas when circulating that patio. Prior use of oversized umbrellas paired  with large concrete ballast base‐plates hindered having a 36" continuous travel path  through the seating area to an exit. The new design is minimal and simple allowing  better access for all.      B. Pedestrian Amenity Space Commercial, Lodging and Historic District Design Standard, PA1.5 requires street level  Pedestrian Amenity areas to be open to the sky unless coverage is approved by HPC or P&Z.  Enclosing this outdoor space will reduce the amount of pedestrian amenity space that  currently exists. Pursuant to Land Use Code Section 26.412.070, Pedestrian Amenity, 25  percent of the Gross Lot Area of the property is required to be provided as pedestrian  amenity, regardless of the existing onsite pedestrian amenity amount. P&Z will determine  the appropriate method or combination of methods for providing the required amenity.  26 These methods include providing an off‐site pedestrian amenity, or a cash‐in‐lieu provision.  Sec. 26.412.070. ‐ Pedestrian Amenity. (a)Applicability and Requirement. The requirements of this Section shall apply to the  development of all commercial, lodging and mixed‐use development within the CC, C‐1, MU, NC,  S/C/I, L, CL, LP and LO Zone Districts, as well as any Essential Public Facility pursuant to Section  26.412.020(a). This area represents the City's primary pedestrian‐oriented downtown, as well as  important mixed‐use, service and lodging neighborhoods. Development in these zone districts  consisting of entirely residential uses is exempt from these provisions. Remodel and renovation  activities that do not trigger demolition, and which maintain one hundred percent (100%) of the  existing pedestrian amenity present on the site are exempt from this Section. Changes to  pedestrian amenity space as a result of required accessibility or building code compliance are  exempt from compliance with the twenty‐five percent (25%) requirement if demolition is not  triggered. Sec.26.412.070 The property lot size is 12,794 sq.ft. and requires 25% or 3,199 sq.ft. of  public amenity space. There is an existing public amenity space of 5,330 sq.ft. This  application proposes a porch addition of a 499 sq.ft. that will cover a portion of the  existing pedestrian amenity space at grade (3,110 sq.ft. as proposed). The addition of  the second story deck pedestrian amenity bring the total pedestrian amenity area to  4,831 sq.ft. and meets the requirement. Lot Size:         12,794 sq.ft. (gross and net) 25% of 12,794 = 3,199 sq.ft. required by code REQUIRED EXISTING PROPOSED Pedestrian Amenity: 3,199 sq.ft. 5,330 sq.ft.*4,831 sq.ft. > 3,199  *(grade 3,500 sq.ft. + second floor 1,830 sq.ft.)                            LOT AREA PEDESTRIAN AMENITY PA1.1 Maximize solar access to Pedestrian Amenity space on the subject property. PA1.1 The existing pedestrian amenity space is appropriately located to the south of  the lot. The (3,000 s.f.) three thousand square foot plus size courtyard allows solar  access to all the buildings eight (8) units. There is no pedestrian amenity space on the  North side. 27 PA1.2 Consider all four corners of an intersection when designing street level amenity space on a corner lot. PA1.2 While Mezzaluna is mid block, the overall building does sit on the North East  corner of the intersection of Hunter Street and Cooper Avenue. No new pedestrian  amenity space is proposed. To the North West was the Boogies Building which has  since been replaced. The South West side contains the Sky Gallery and the South East  side holds the Aspen Square Building. PA1.3 Street level Pedestrian Amenity spaces should be equal to a minimum of 1/3 of the total Pedestrian  Amenity requirement. PA1.3 The existing pedestrian amenity space is located in one contiguous space and  consists of 3,500 s.f. at street level. The lot size is 12,794 s.f. 25% of the existing lot  size equals 3,199 s.f. of required public amenity. The existing project has a surplus of  pedestrian amenity space. The proposed porch would not affect this requirement. PA1.4 Street level Pedestrian Amenity shall be within 18" above or below the existing grade of the street or  sidewalk which abuts the space. PA1.4 The existing pedestrian amenity space is level with the abutting public sidewalk. PA1.5 Street level Pedestrian Amenity areas shall be open to the sky. PA1.5 The proposed structure will shield a portion of the pedestrian amenity area  from the sky, but will still satisfy the code requirement as the property carries a  surplus of pedestrian amenity space. All portions of the covered pedestrian amenity  space will remain entirely open along the vertical planes and have direct and open  access to Cooper Avenue.  PA1.6 Design meaningful street level space that is useful, versatile, and accessible. PA1.6 No new pedestrian amenity space is proposed. The addition of a porch over a  portion of the existing pedestrian amenity is proposed. It is appropriate as it creates a  usable space for restaurant seating.  PA1.7 Design amenity space that enhances the pedestrian experience and faces the street. PA1.7 The proposed porch offers an option to the passing pedestrian of a protected  seating area while still outdoors in unconditioned space. PA1.8 Street level Pedestrian Amenity space should reinforce the property line. Consider the context of the  block when selecting an appropriate technique.  PA1.8 A bench sits parallel to the South Property line offering definition. This is  reinforced by the corner of the island planter that is 28" above grade.  PA1.9 Street level Pedestrian Amenity may be appropriate on a case‐by‐case basis within the Commercial Core  Historic District..  28 PA1.9 Not Applicable. The property is not located in the Commercial Core Historic  District. PA1.10 Street level Pedestrian Amenity may include providing public access to the mountain or river in the  Mountain Base and River Approach Character Areas through a trail easement, subject to Parks and  Engineering approval.  PA1.10 Not Applicable. The property is not located in the Mountain Base and River  Approach Character Areas. PA1.11 Within the Main Street Historic District, required building setbacks may be used toward a Pedestrian  Amenity requirement.  PA1.11 Not Applicable. The property is not located in the Main Street Historic District. PA2.1 A second floor Pedestrian Amenity shall be in the form of a deck that is visible from, and adjacent to              the street.  Railing height shall not be increased above the minimum IBC requirement.  Historic landmark parapets may be exempt, subject to HPC approval.  Railings shall be a minimum of 50% transparent unless located in the Commercial Core Historic               District where transparent railings may not be appropriate, given the pattern of decorative cornices               capping buildings.  PA2.1 The existing second level deck is both visible and adjacent to Cooper Avenue. Railings are minimal, 36" brick facade parapet wall with 6" metal tube cap.    PA2.2 Pedestrian Amenity is highly discouraged on the roof of the second floor.  PA2.2 No pedestrian amenity is proposed on the roof of the second floor. All  pedestrian amenity is located at grade or as a deck on the second level. PA2.3 Second floor amenity shall be accessed directly from the street.  Remodels and historic landmarks may be exempted from this requirement, subject to P&Z or HPC approval.  29 A separate exterior entrance is preferred.  A public access easement may be requested by the City as part of an approval.  PA2.3 Access to the second floor amenity is accessed directly from Hunter Street in the  form of an enclosed exterior staircase. Alternative access to the deck is via the  courtyard by a second enclosed exterior staircase. No changes are proposed in this  application. The second floor amenity is existing. PA2.4 Second floor Pedestrian Amenity should be equal to a minimum of 50% of the total Pedestrian Amenity  requirement. PA2.4 Grade level pedestrian amenity space equals 3,500 sq.ft. Second Floor  Pedestrian Amenity space equals 1,830 sq.ft. or 52%, meeting this requirement. PA2.5 All second floor Pedestrian Amenity shall be open to the sky.  Small seasonal umbrellas or retractable canopies may be allowed, subject to Planning Staff, HPC or P&Z  approval, as long as these features do not cover the entire space and do not obstruct views in from the street.  PA2.5 Second Floor Pedestrian Amenity is open to the sky save for a retractable  umbrella thats use is seasonal. PA2.6 Design meaningful space that is useful, versatile and accessible.  Small unusable spaces are inappropriate.  Consider providing space for future outdoor merchandising or restaurant seating opportunities.  Providing good solar access, mountain views, and seating is recommended.  Storage area or trash area are not allowed uses within pedestrian amenity space. PA2.6 The design and usability of the Second Floor pedestrian amenity space is  contiguous and provides excellent southern solar access, mountain views, and open  seating. There are no storage or trash areas located on the deck. PA2.7 The Pedestrian Amenity shall be directly connected to a publicly accessible area.  A second floor Pedestrian Amenity in a lodge may be accessible from a restaurant, lobby, or other adjacent  public space.  Access to second floor Pedestrian Amenity shall be integrated into the architecture, either through an interior  or exterior space. PA2.7 Access to the second floor amenity is accessed directly from Hunter Street in the  form of an enclosed exterior staircase. Alternative access to the deck is via the  courtyard by a second enclosed exterior staircase. No changes are proposed in this  application. The second floor amenity is existing. PA2.8 Design wayfinding to the second floor amenity into the architecture.  PA2.8 Wayfinding to the second floor amenity is achieved through the enclosed  30   EXTERIOR STAIRCASE OFF HUNTER STREET PA3.1 ‐ PA3.2 Pedestrian Malls Pedestrian Amenity.  PA3.1 ‐ PA3.2 Not Applicable. The property is not located in the Pedestrian Mall Area. PA4.1 New midblock Pedestrian Amenity walkways shall not be located in a block face that already has a   midblock walkway.  PA4.1 Not Applicable. The property does not include new pedestrian amenity located  in a block face that already has a mid block walkway. PA4.2 Mid block Pedestrian Amenity shall provide access to additional commercial space. PA4.2 The existing pedestrian amenity is designed as a courtyard that opens to  multiple commercial spaces as well as a stairway to second floor office space and deck  area. The courtyard extends more than 70 feet back from the street edge and offers  access to the alley. PA4.3 Mid block Pedestrian Amenity walkways shall be open to the sky.  PA4.3 The mid block pedestrian amenity walkway is not open to the sky for the last 40  feet to the alleyway. It is covered by the principal building containing second floor  offices. The covered portions of the pedestrian amenity allow for the 25%  requirement to be met. PA4.4 Design the space to be surrounded with high quality materials and architectural details. PA4.4 The simple design uses the highest quality steel and black matte paint.  The  31 color will match the existing building in both quality and appearance. PA4.5 A mid block Pedestrian Amenity should include lighting and landscape elements. PA4.5 The mid block pedestrian amenity includes three large planter islands. Existing  recessed lighting is included at all areas that are covered by the existing principal  building.  PA4.6 Design wayfinding to the mid block walkway into the architecture.  PA4.6 An emergency exit sign will be located at the north end of the roof structure. PA5.1 ‐ PA5.9 Subgrade Courtyard Pedestrian Amenity.  PA5.1 ‐ PA5.9 Not Applicable. The property does not have subgrade courtyard  pedestrian amenity. PA6.1‐PA6.5 Off‐site improvements shall be located within the block of the subject property. PA6.1‐PA6.5 The applicant does not propose any off‐site pedestrian amenity  improvements but is open to any suggestion by P&Z in the event that they determine  it warranted. Applicant agrees to abide by all design standards relating to off‐site  pedestrian amenity.  PA7.1 ‐ PA7.6 Interior Courtyard Pedestrian Amenity.  PA7.1 ‐ PA7.6 Not Applicable. The property does not have interior courtyard  pedestrian amenity. C. Commercial Character Area This property is located within the Commercial Character Area as defined in the  Commercial, Lodging and Historic District Design Standards and Guidelines. All criteria  within this Character area should be addressed.  4.1 Properties adjacent to the Commercial Core Historic District require careful consideration when siting a         new building.  4.1 Not Applicable. The building has already been sited. 4.2 Variations on the traditional 19th‐century commercial design are encouraged. 4.2 The proposed design is simple and basic. It uses a skeleton frame construction  system, a typical 19th‐century commercial design characteristic.  4.3 Two‐story buildings area appropriate. 4.3 The existing building is a two‐story building. The second story is set back and has a  minimal footprint. 4.4 Maintain a minimum floor to ceiling height of 10 feet for the first floor and 9 feet for the second floor. 32 4.4 The existing building has a first story height of 11 feet and a second floor of 8 feet.  4.5 Maintain an architectural distinction between the street level and upper floors to reinforce 19th‐century         commercial traditions. 4.5 The proposed design is simple, basic, and driven by economic demand.   4.6 Flat roof forms are appropriate and reinforce the commercial nature of the neighborhood. 4.6 The proposed porch has a slight pitch of 3:12. Where it attaches to the side of the  building, there is a flat roof as suggested by this standard.   4.7 Large storefronts are recommended on the ground level. 4.7 No changes are proposed to the existing large storefront bay windows that wrap  the building at ground level.  4.8 If non‐traditional materials are used, they should be subtle in appearance and location and applied  using traditional techniques. 4.8 No applicable. Non‐traditional materials are not proposed. 33 34 DATE REVISION NOTES TITLE # PAGE # the PBRworkshop 301 W. HYMAN STE. #6 ASPEN CO 81611 970-274-0481 or amos@pbrworkshop.com 3.21.22 C.O.A. LU APPLICATION N MEZZALUNA 624 E. COOPER AVE. ASPEN , COLORADO 81611 PARCEL ID 273718225005 VICINITY MAP TEAM DRAFTSMAN: THE PBRWORKSHOP 301 W. HYMAN #6 ASPEN, CO 81611 (970) 274-0481 ENGINEERING: ALBRIGHT & ASSOCIATES 401 PARK AVE CARBONDALE, COLORADO 81623 (970) 927-4363 SITE OWNER: MEZZALUNA RESTAURANT 624 E. COOPER AVE ASPEN, COLORADO 81611 MASONRY: CHIP PATTERSON ASPEN COLORADO (970) 948-9566 1 - COVER COVER SHEET CONTRACTOR: RUTGERS CONSTRUCTION 256 TWINING FLATS ROAD ASPEN, COLORADO 81611 (970) 925-8229 CONSULTING: ASPEN DESIGN HOUSE denise@aspendesignhouse.com (970) 618-3174 @ AT &AND ABV.ABOVE hpAC AIR CONDITIONING ACT.ABOVE COUNTERTOP ACOUST.ACOUSTICAL ADDN'L.ADDITIONAL ADJ.ADJACENT AFF.ABOVE FINISH FLOOR AGG.AGGREGATE ALUM.ALUMINUM ALT.ALTERNATE ARCH.ARCHITECTURAL AVG.AVERAGE BD.BOARD BF.BOTH FACES BIC.BUILT-IN CABINET BLDG.BUILDING BLK.BLOCK BLK'G.BLOCKING BLW BELOW BTM.BOTTOM BTWN.BETWEEN BVL.BEVELED BW.BOTH WAYS CAB.CABINET CF CUBIC FEET CLG.CEILING CJ.CONTROL JOINT CLR.CLEAR CMU CONCRETE MASONRY UNIT CNTR.COUNTER C.O.CLEAN OUT COL.COLUMN COMP.COMPOSITION CONC.CONCRETE CONN.CONNECTION CONT.CONTINUOUS CONTR.CONTRACTOR CT.CERAMIC TILE DBL.DOUBLE DET.DETAIL DEPT.DEPARTMENT D.F.DOUGLAS FIR DIA.DIAMETER DIM.DIMENSION DIV.DIVISION DN DOWN DW DISHWASHER DWG.DRAWING (E)EXISITNG EA.EACH EJ.EXPANSION JOINT ELECT.ELECTRIC/ELECTRICAL ELEV.ELEVATION EMER.EMERGENCY EN.EDGE NAIL EOP.EDGE OF PAVEMENT EOS.EDGE OF SLAB EQ.EQUAL EQUIP.EQUIPMENT EXT.EXTERIOR FA.FIRE ALARM FACP FIRE ALARM CONTROL PANEL FAU FORCED AIR UNIT FFE.FINISHED FLOOR ELEVATION FG.FIXED GLASS FH.FIRE HYDRANT FIN.FINISH FLR.FLOOR GA.GAUGE GALV.GALVANIZED GC.GENERAL CONTRACTOR GFI.GROUND FAULT INTERRUPTER GI.GALVANIZED IRON GLB.GLUED LAMINATED BEAM GND.GROUND GSM.GALVANIZED SHEET METAL GYP.BD. GYPSUM WALL BOARD HB HOSE BIBB HC HOLLOW CORE / HANDICAP HDWR.HARDWARE HORIZ.HORIZONTAL HP.HIGH POINT HT.HEIGHT HTG.HEATING HVAC HEATING/VENTILATION/AIR CONDITIONING HW.HOT WATER IBC.INTERNATIONAL BUILDING CODE ID.INSIDE DIAMETER INCL.INCLUDED INFO.INFORMATION INSUL.INSULATION INT.INTERIOR INF.INFRARED IRC. INTERNATIONAL RESIDENTIAL CODE LAM.LAMINATE LB.POUND LF.LINEAL FOOT LVL.LAMINATED VENEER LUMBER MAX.MAXIMUM MECH.MECHANICAL MFR.MANUFACTURER MH.MAN HOLE MIN.MINIMUM MIR.MIRROR MISC.MISCELLANEOUS MW.MICROWAVE MOD.MODULE MTL.METAL (N)NEW NEC NATIONAL ELECTRIC CODE NIC.NOT IN CONTRACT N/A NOT APPLICABLE NTS.NOT TO SCALE O/OVER O.C.ON CENTER O.D.OUTSIDE DIAMETER OFD.OVERFLOW DRAIN OH.OVERHEAD OPP.OPPOSITE PERF.PERFORATED PLAM.PLASTIC LAMINATED PLYWD PLYWOOD PNT.PAINT PP.POWER POLE PSF POUNDS PER SQUARE FOOT PT.PRESSURE TREATED PVC.POLY VINYL CHLORIDE PVMT.PAVEMENT PUE.PUBLIC UTILITY EASEMENT QT.QUARRY TILE R.RISER RAD.RADIUS RD.ROOF DRAIN RDWD.REDWOOD REINF.REINFORCING REF.REFRIGIERATOR REQ'D REQUIRED RET.RETAINING REV.REVISION RM.ROOM RO.ROUGH OPENING SC.SOLID CORE SCHED.SCHEDULE SD SOAP DISPENSER SDR.STORM DRAIN SECT.SECTION SF SQUARE FOOT/FEET SHT.SHEET SHLVS.SHELVES SHWR.SHOWER SIM.SIMILAR SLR.SEALER SPECS.SPECIFICATIONS SQ.SQUARE S&P SHELF & POLE SS SANITARY SEWER S.S.D.SEE STRUCTURAL DRAWINGS S.ST.STAINLESS STEEL STD.STANDARD STL.STEEL STOR.STORAGE STRUCT.STRUCTURAL SUSP.SUSPENDED S.W.SHEARWALL T.TREAD TC.TRASH COMPACTOR TEL.TELEPHONE TEMP.TEMPERED T&G TONGUE & GROOVED TV TELEVISION TYP.TYPICAL UON UNLESS OTHERWISE NOTED UPN UNIFORM PLUMBING CODE VCT VINYL COMPOSITION TILE VENT.VENTILATION VERT.VERTICAL VIF.VERIFY IN FIELD VNR.VENEER W/WITH WC.WATER CLOSET WD.WOOD W.WASHER WH.WATER HEATER W/O WITHOUT WP.WATER PROOF YD.YARD ABBREVIATIONS PROJECT DATA JURISDICTION: CITY OF ASPEN BUILDING DEPARTMENT 130 S. GALENA, 3RD FL.OOR ASPEN CO, 81611 APPLICABLE CODES: 2015 International Existing Building Code DESIGN CRITERIA: GROUND SNOW LOAD 100 psf WIND DESGIN SPEED 89/B SISMEIC DESIGN CAT C WEATHERING SEVERE FROST LINE DEPTH 36" TERMITE NONE TO SLIGHT DECAY NONE TO SLIGHT WINTER DESIGN TEMP -15F UNDERLAYMENT YES FLOOD HAZARD NONE AIR FREEZING INDEX 2000 MEAN ANNUAL TEMP 40 SHEET INDEX 1-COVER Cover Sheet and Index A.1.1 Pedestrian Amenity Calculations Parcel ID: 273718225005 Property Address: 624 E.COOPER AVE. ASPEN CO 81611 HUNTER PLAZA - 600 E. COOPER AVE. Type: C-1 DISTRICT NO CHANGE TO FAR A.1.0 Site Plan, Roof Plan, Porch Elevations A.2.0 Foundation Exploration PORCH - ADDITION SURVEY Survey - 98' HUNTER PLAZA PERSPECTIVE SURVEY Survey - 06' 35 36 37 DATE REVISION NOTES TITLE # PAGE # the PBRworkshop 301 W. HYMAN STE. #6 ASPEN CO 81611 970-274-0481 or amos@pbrworkshop.com 3.21.22 C.O.A. LU APPLICATION N 499 sq.ft. PORCH 38'-5" 14'-5" 28'-9" 38'-5" 14'-5" 28'-9" 38'-5" 11'-11" 8'-8" 19'-4" PRO-PANEL METAL CLASS "A" ROOF SYSTEM METAL COLUMN ATTACH TO ISLAND PLANTER PER ENGR. METAL FLASHING 8'-8"11'-11" 14'-5" MEZZALUNA 624 E. COOPER AVE. ASPEN , COLORADO 81611 PARCEL ID 273718225005 PROPOSED SOUTH ELEVATION - 1/4" SCALE PROPOSED ROOF PLAN - 1/4" SCALEPROPOSED SITE PLAN - 1" = 10' SCALE PROPOSED WEST ELEVATION - 1/4" SCALE PRO-PANEL METAL CLASS "A" ROOF SYSTEM BENCH ISLAND PLANTER FENCE 3:12 3 12 A 1.0 SITE, ROOF ELEVATION 38 DATE REVISION NOTES TITLE # PAGE # the PBRworkshop 301 W. HYMAN STE. #6 ASPEN CO 81611 970-274-0481 or amos@pbrworkshop.com 3.21.22 C.O.A. LU APPLICATION N MEZZALUNA 624 E. COOPER AVE. ASPEN , COLORADO 81611 PARCEL ID 273718225005 PEDESTRIAN AMENITY CALCULATIONS LOT AREA = 12,794 SQ.FT. (AREA IN GRAY) REQUIRED PEDESTRIAN AMENITY = 25% of 12,794 = 3,199 SQ.FT. EXISTING PEDESTRIAN AMENITY @ GRADE (AREA IN GREEN) = 3,500 SQ.FT. EXISTING PEDESTRIAN AMENITY @ SECOND FLOOR (AREA IN GREEN w/HATCH) = 1,830 SQ.FT. PROPOSED PEDESTRIAN AMENITY 3,110 SQ.FT.(GRADE) + 1,830 SQ.FT. (2ND. FLR.) = 4,940 SQ.FT. *Calculation of pedestrian amenity shall include stairs, walkways or other means of accessing pedestrian amenity space from rights-of-way or internal circulation ways counted as non-unit space per Section 26.575.020. A 1.1 PEDESTRIAN AMENITY 39 DATE REVISION NOTES TITLE # PAGE # the PBRworkshop 301 W. HYMAN STE. #6 ASPEN CO 81611 970-274-0481 or amos@pbrworkshop.com 3.21.22 C.O.A. LU APPLICATION N MEZZALUNA 624 E. COOPER AVE. ASPEN , COLORADO 81611 PARCEL ID 273718225005 #1 FOUNDATION EXPLORATION #2 FOUNDATION EXPLORATION CONCRETE UNDERSLAB CONCRETE UNDERSLAB 5" THCK. FINISH SLAB 4" THCK BRICK PAVER 2" THCK. OVER 1" SAND BASE +0" +4" +22" T.O.SLAB T.O. WALL T.O. FINISH SLAB 12/2/21 FOUNDATION EXPLORATIONDONE BY CHIP PATTERSON 970-948-9566 A 2.0 FOUNDATION EXPLORATION 40 41 42 43 44 45 46 47 Legal Description Property Address: 624 E COOPER AVE, ASPEN, CO 81611 - Mezzaluna (602 E COOPER AVE, ASPEN, CO 81611 - Hunter Plaza Associates LLC) Subdivision: CITY AND TOWNSITE OF ASPEN Block: 100 Lot:K AND:- Lot: Thru O PT OF K-O 48 Vicinity Map 49 50 51 PRE-APPLICATION CONFERENCE SUMMARY DATE: October 21, 2020 PLANNER: Kevin Rayes | kevin.rayes@cityofaspen.com | 970.429.2797 PROJECT NAME AND ADDRESS: Mezzaluna / 624 E. Cooper | Installation of an Exterior Trellis/Canopy PARCEL ID# 2737-182-25-005 REPRESENTATIVE: N/A DESCRIPTION: The subject property is home to Mezzaluna, a restaurant located within the Commercial (C-1) zone district. Exterior seating associated with the restaurant is located within an adjacent courtyard. This area contains several temporary umbrellas and heating structures, but otherwise remains uncovered and open to the sky. The applicant plans to install a trellis or canopy in the courtyard to provide more robust weather protection for patrons dining outside. At this time, details related to materials, design and size of the structure are being contemplated. Based on initial conversations, the applicant prefers to install a permanent structure with retractable awnings along the walls and on the roof. The land use reviews’ and mitigation fees associated with installing a structure can vary substantially. This pre- application provides three options for the applicant to consider. OPTION 1: Pursue Land Use Approval to Install a Permanent Structure: ❖ Install a Structure that is Open on All Sides: Installing a permanent structure, that is open on all sides, requires Commercial Design Review and approval from the Planning and Zoning Commission (P&Z), pursuant to Code Section 26.412, Commercial Design Review. As of the date of this pre-application, P&Z could review this request in January 2021 at the earliest. The Commercial Design Review Criteria are strict, and approval is not guaranteed. The criteria prescribed in the Commercial, Lodging and Historic District Design Standards and Guidelines should be addressed. These criteria are broken down into the following three sections: 1. General Review Criteria All General review criteria should be addressed. Particular attention should be given to the criteria related to Materials and Details (1.22-1.25). For example, materials should have proven durability and weathering characteristics within Aspen’s climate. Additionally, materials should be non-reflective. Shiny or glossy materials no not appropria te as a primary material. 2. Pedestrian Amenity Space Commercial, Lodging and Historic District Design Standard, PA1.5 requires street level Pedestrian Amenity areas to be open to the sky. Given the proposed scope of work , complying with this standard on-site may be a challenge. Land Use Code Section 26.412.070.B, Provision of Pedestrian Amenity , outlines several alternatives that may be used to meet the requirement . 3. Commercial Character Area This property is located within the Commercial Character Area as defined in the Commercial, Lodging and Historic District Design Standards and Guidelines. All criteria within this Character area should be addressed. Following review and approval from P&Z, the application will be subject to Call Up from City Council as required in Land Use Code Section 26.412.40.F.3, Call-up. Depending on the final design and proposed scope of work, additional reviews may be necessary. Upon receipt of an application, Community Development staff will inform the applicant if additional reviews will be needed. 52 1. Mitigation is required only for the days in excess of 14 in a 12 -month period and may be paid via cash-in-lieu. ❖ Installing an Enclosed Structure: The applicant is considering installing a canopy or trellis structure. Pursuant to Land Use Code Section 26.470.070, Exempt Development, trellis structures and retractable canopies are exempt from Growth Management and Commercial Design Review provided the structure remains open on all sides and does not contain any form of walls, screens or windows. If retractable walls, screens or windows are permanently affix ed to the structure, the entire footprint of the structure would likely count as net leasable space and would need to mitigate according to Land Use Code Section 26.470.050, Calculations. If retractable walls, screens or windows are installed to the structure but ar e removable then the following would apply: whenever walls, screens or windows are installed , Growth Management Review and Commercial Design Review would be considered exempt if the installations remain for 14 days or less in a 12-month period and are approved pursuant to Chapter 26.450, Temporary & Seasonal Uses. Walls, screens or windows installed longer than 14 days in a 12-month period must comply with Commercial Design standards and Growth Management Review.1 For example, if the applicant wishes to enclose the structure during the winter months, both reviews would apply and affordable housing mitigation would be required. Example: If Walls, screens or windows are installed on a 600 sq. ft. canopy or trellis for 21 days, mitigation would be required for a total of seven days . The mitigation calculation includes the expected lifespan of a building, which is currently 30 years. The Code prescribes a generation rate of 4.7 FTEs per 1,000 sq. ft. of net leasable space. Lastly, the code requires a mitigation rate of 65 percent. The calculation is as follows: • 600 sq. ft. / 1,000 sq. ft. = .6 sq. ft. • 0.6 sq. ft. x 4.7 FTEs = 2.82 FTEs Generated • 2.82 FTEs x 65% mitigation rate = 1.833 FTEs to be mitigated if structures are in use 100 % of the year • FTEs / 365 days per year = 0.0050219 daily rate • 0.0050219 x 7 days = 0.0351533FTEs • 0.0351533 x $342,599.02 cash -in-lieu rate= $12,043.45 • $12,043.45 / 30 years = 401.44 due for mitigation of the structure for 7 days OPTION 2: Install a temporary structure for Winter 2020 -2021 and remove it by May 1, 2021 : Existing public health orders have reduced the maximum occupant capacity in restaurants. To support businesses, the City of Aspen is exempting Commercial Design Review and Growth Management for temporary enclosures installed during the Winter of 2020 -2021. The applicant may consider installing a temporary enclosure for the upcoming winter with the understanding that any temporary enclosures, signage, lighting and structures must be removed by May 1, 2021. Option 3: Install a temporary enclosure for Winter 2020-2021 and pursue land use approvals to permanently maintain the structure: If the applicant is interested in erecting a permanent structure as soon as possible, one could be installed during the Winter of 2020 -2021. The structure would be exempt from Growth Management Review and Commercial Design Review until May 1, 2021. In the interim, the applicant could pursue the necessary land use approvals described above to maintain the structure permanently. As previously mentioned, Commercial Design Review is strict and there is no guarantee the structure would be approved permanently. Failure to receive approval by May 1 st would require immediate removal of the structure. 53 RELEVANT LAND USE CODE SECTIONS: Section Number Section Title 26.304 Common Development Review Procedures 26.470.080 General Review Standards 26.470.100.E Growth Management, Expansion or new commercial development 26.412 Commercial Design Review 26.412.40.F.3 Call-up For your convenience – links to the Land Use Application, the Land Use Code and the Commercial, Lodging, & Historic District Design Standards and Guidelines are below: Land Use Application Land Use Code Commercial Design Standards REVIEW BY: Options 1 & 3: Permanent Structure (Remaining past May 1, 2021): ▪ Community Development staff for complete application and: o If permanent, open structure: Planning & Zoning Commission for Commercial Design Review o If permanent, enclosed structure: City Council for Commercial Design and Growth Management Review Option 2: Temporary Structure (Removed by May 1, 2021): ▪ Community Development staff for administrative review PUBLIC HEARING: Options 1 & Option 3- Yes ▪ Permanent Open Structure: Planning & Zoning Commission ▪ Permanent Enclosed Structure: City Council PLANNING FEES: Options 1 & 3: $3,250 Deposit for 10 hours of staff time (additional or less hours will be billed or refunded at a rate of $325 per hour) REFERRAL FEES: $325 per hour, City Engineering- additional hours will be billed as necessary TOTAL DEPOSIT: $3,575 APPLICATION CHECKLIST – PLEASE EMAIL APPLICATION TO: KEVIN.RAYES@CITYOFASPEN.COM  Completed Land Use Application and signed Fee Agreement.  Pre-application Conference Summary (this document).  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application. The purpose of this requirement is to show that the Applicant has the authority to apply for a Land Use Case.  A written description of the proposal and an explanation in written, graphic, or model form of how the proposed development complies with the review standards relevant to the development application . Please include drawings/diagrams of the preferred lot configuration.  A recent site improvement survey (no older than 1 year) 54  A letter from the HOA discussing the preferred lot configuration.  HOA Compliance form (Attached to Application) Once the copy is deemed complete by staff, the following items will then need to be submitted:  Total fee for review of the application. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. 55 MEMORANDUM TO: City of Aspen Planning and Zoning Commission FROM: Jeffrey Barnhill, Planner I THROUGH: Amy Simon, Planning Director MEMO DATE: June 10, 2022 MEETING DATE: June 21, 2022 RE: P&Z Recommendation related to FIL requests to City Council REQUEST OF THE PLANNING AND ZONING COMMISSION: The Planning and Zoning Commission is asked to review, consider and send a recommendation to City Council related to Affordable Housing Mitigation requirements and the ability for four properties currently in the building permit review process to pay Fee-in-Lieu (FIL) to meet mitigation requirements. This recommendation and the eventual review by Council is a response to a current shortage of available Affordable Housing Certificates in the market. Staff recommends P&Z approve the Resolution – providing P&Z support for the identified properties/projects to pay FIL. SUMMARY AND BACKGROUND: The Affordable Housing Certificates Program – now in effect for over a decade – has been successful in providing incentive for the private sector to produce affordable housing units. Since the inception of the program, housing fo r more than 100 FTEs has been produced – without any public dollars being expended. The program is dependent on two things: 1) the willingness of the private sector to successfully complete affordable housing projects, and 2) the demand for AH credits by free-market commercial and residential development to meet their mitigation requirements. The City, to encourage the program, established AH Certificates as the preferred means to provide affordable housing mitigation for single-family and duplex development. Primarily, this was accomplished by disallowing the payment of FIL for mitigation requirements above 0.1 FTEs. A property owner pursuing a permit may pay the first 0.1 FTEs due for a given project in cash, but to the extent that additional mitigation is due above this threshold, AH Certificates must be provided to meet the mitigation calculated for the project. (Please note that there are other alternatives, such as voluntarily deed restricting the subject unit to Resident Occupied, or buying another free- market residential unit in town and deed restricting it as mitigation, however these have been unpopular and likely cost prohibitive options.) 56 Staff Memo, P&Z Recommendation Page 2 of 4 The Land Use Code has long offered a process for paying FIL over 0.1 FTEs with cash for larger mitigation requirements, but it requires a request and approval by Council, following a recommendation from P&Z. No applicant has pursued that option due to a perception that approval would be unlikely. Following is the code language that describes this process: 26.470.110. C. Provision of required affordable housing via a fee-in-lieu payment. The provision of affordable housing in excess of 0.10 Full-Time Equivalents (FTEs) via a fee-in-lieu payment, upon a recommendation from the Planning and Zoning Commission shall be approved, approved with conditions or denied by the City Council based on the following criteria: 1) The provision of affordable housing on site (on the same site as the project requiring such affordable housing) is impractical given the physical or legal parameters of the development or site or would be inconsistent with the character of the neighborhood in which the project is being developed. 2) The applicant has made a reasonable, good-faith effort in pursuit of providing the required affordable housing off site through construction of new dwelling units, the deed restriction of existing dwelling units to affordable housing status, or through the purchase of affordable housing certificates. 3) The applicant has made a reasonable, good-faith effort in pursuit of providing the required affordable housing through the purchase and extinguishment of Certificates of Affordable Housing Credit. 4) The proposal furthers affordable housing goals, and the fee-in-lieu payment will result in the near-term production of affordable housing units. The City Council may accept any percentage of a project's total affordable housing mitigation to be provided through a fee-in-lieu payment, including all or none. At present, there are not AH Certificates available in the marketplace. There are a number of Certificates unextinguished (40+ FTEs), but they are unavailable for purchase as they are held by entities that have already dedicated their use to commercial and residential projects in the pipeline. Staff has confirmed this condition through analysis of the spreadsheet that we use to track the Certificates program and correspondence with individuals that are seeking Certificates to meet mitigation requirements associated with building permits and previous projects that have AH Deferral Agreements for working locals. Staff has also had conversations with the entities that are holding unextinguished Certificates to understand their intentions. It is clear that there is a problem in the market. As noted above, in the 10+ year history of the Certificates Program, these requests represent the first time that we have had requests to pay FIL above the 0.1 FTE threshold. Looking at potential AH Certificates projects that are in the development pipeline, this is a condition in the market that is going to take some time to resolve. 57 Staff Memo, P&Z Recommendation Page 3 of 4 In response, staff has established a policy and a process to facilitate these requests in a “batched” review. In Quarter 1 of this year, five property owners requested to pay FIL for their full mitigation. It is now Quarter 2. At this meeting, P&Z is asked to consider requests from two property owners to pay FIL for their full mitigation. These projects have both exhausted their opportunities to purchase and extinguish Afforda ble Housing Certificates. These are both projects that require 1.5 FTE or less in meeting mitigation requirements and are for building permits that are in their final stages prior to issuance, or are previously completed projects that were granted mitigation deferrals for local, working residents. It is important to note that the projects that are a part of this request to pay FIL have mitigation requirements that are just a fraction of an FTE over the 0.1 mitigation that can be paid in cash by right. It is not reasonable to expect the property owners to pursue the other mitigation options offered by the code for the relatively small employee generation related to their homes. It is intended that until the shortage conditions in the market improve, that this process will occur quarterly. STAFF DISCUSSION: With staff’s confirmation of the conditions in the Certificates market, it was clear that a solution needed to be identified to allow otherwise compliant development projects to proceed through the permit issuance process. It is hoped that this process will accomplish the following: 1) provide some predictability for projects that are in the development pipeline and are nearing building permit issuance. 2) prevent the clogging up of P&Z and Council agendas with these requests. 3) maintain important components of the AH Certificates Program, so that the essentials of the program are not undermined. 4) Allow for a seamless and simple transition back to AH Certificates as the primary mechanism for mitigation once the market conditions improve. In staff’s view, if the process is not facilitated in this way, it would likely lead to suboptimal outcomes for Community Development customers that have projects that have mitigation requirements and additionally, could potentially undermine important aspects of Aspen’s AH mitigation system. Below are the projects that are requesting to pay FIL in this round of review. In the information provided for each, the FTE and dollar amounts of the FIL a re estimates that will be confirmed and finalized as the last step of the building permit process. The land use code establishes that FIL for most residential mitigation is to be calculated at the Category 2 level, which is currently $376,475 per FTE. These numbers will typically not change, unless a small technicality emerges in the final reviews. 58 Staff Memo, P&Z Recommendation Page 4 of 4 • 411 Pearl Court – 1.06 FTE / $399,063.50 (Building Permit) • 114 W Hopkins (Molly Gibson Residences) - 1.13 Cat 4 FTE / $269,716.36 (Building Permit) (Please note that the Molly Gibson Residences are associated with the redevelopment of the Molly Gibson Lodge and as such mitigation was approved during Planned Development review to be at Category 4, which requires a fee of $238,687.04 per FTE [Ordinance No. 3, Series of 2015]. The Molly Gibson Residences required 2.65 Category-4 FTEs for mitigation. They purchased 1.52 Category-4 FTEs which left them 1.13 Category-4 FTEs short which they hope to mitigate with this process. [See Exhibit A]) CONCLUSION AND NEXT STEPS: On July 12, 2022, Council will consider P&Z’s recommendation and will decide whether to authorize FIL for the identified projects. With this approval, each of the projects would pay the finalized FIL amount as part of the permit issuance process. It is likely that this process will be replicated in Quarter 3 of 2022 – sometime in early September. RECOMMENDATIONS: Staff recommends the Planning and Zoning Commission approve Resolution XX, providing support for payment of FIL for the subject properties. EXHIBITS: A – Letters from the applicants that were included as part of the application to request to pay FIL 59 60 May 25, 2022 City of Aspen Attn: Jeffery Barnhill via email: jeff.barnhill@aspen.gov 130 S. Galena St. Aspen, CO 81611 (970) 920-5090 Owner Info Attn: Lauren Scannell Elevate Development and Design No. 002, LLC PO Box 5223 Snowmass Village, CO 81615 email: Lauren@elevatednd.com (317) 730-3783 Re: Fee-in-Lieu Housing Mitigation for a New Single Family Residence at 411 Pearl Court, Aspen, Colorado Dear City of Aspen Community Development Department, We’d like to request a fee-in-lieu housing mitigation for the affordable housing , School Land Fees, Parks Fees and TDM/Air Quality. Alongside our client, our planners, and ourselves reached out and exhausted our options for trying to secure credits. It seems at this time there are no significant number of affordable housing credits available in our community. Our client understands the community's need for the fee and is prepared to provide a check for the required 1.01 Category 2 FTEs totaling a sum of $380,239.75, for single family residence at 411 Pearl Court.. Signed: Nick Miscione, AIA, Principal Design Architect MISCIONE DESIGN STUDIO -- ARCHITECTURE & INTERIORS -- 116 S. BILL CREEK ROAD, CARBONDALE, CO 81623 -- 970.315.2371 61 Planning and Zoning Commission Res. No. xx, Series of 2022 Page 1 of 2 RESOLUTION NO. xx (SERIES OF 2022) A RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION RECOMMENDING APPROVAL BY CITY COUNCIL OF THE ABILITY OF CERTAIN DEVELOMENT PROJECTS TO PAY FEE-IN-LIEU FOR REQUIRED AFFORDABLE HOUSING MITIGATION REQUIREMENTS, PER MUNICIPAL CODE SECTION 26.470.110.C. WHEREAS, The Affordable Housing Certificates Program has been established as the preferred mechanism within the Land Use Code to provide required affordable housing mitigation; and, WHEREAS, the Land Use Code provides a process for an applicant to make a request to Aspen City Council to pay Fee-in-Lieu in meeting mitigation requirements as an alternative to Affordable Housing Certificates in Section 26.470.110.C; and, WHEREAS, Community Development Staff has analyzed the current market conditions for Affordable Housing Certificates and has determined that there is a shortage, making it practically impossible to acquire Affordable Housing Certificates; and, WHEREAS Community Development has presented and discussed this issue with the Planning and Zoning Commission; and, WHEREAS, at a regular meeting on June 21, 2022, the Planning and Zoning Commission considered the requests of two property owners to pay Fee-in-Lieu in meeting affordable housing mitigation requirements, and reviewed staff’s memo, and by a X - X (X-X) vote approves Resolution No. XX, Series of 2022, recommending Council consideration and approval of the requests to pay Fee-in-Lieu. NOW, THEREFORE BE IT RESOLVED BY THE PLANNING AND ZONING COMMISSION OF THE CITY OF ASPEN, COLORADO THAT: Section 1: Planning and Zoning Commission recommends the following projects be allowed to pay Fee-in-Lieu in meeting affordable housing mitigation requirements: 411 Pearl Court – Building Permit - 1.06 FTE / Category 2 - $399,063.50 114 W Hopkins Ave – Building Permit - 1.13 FTE / Category 4 - $269,716.36 The FTE and valuations of the Fee-in-lieu as presented are estimates only and will be finalized prior to building permit issuance. Section 2: This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. 62 Planning and Zoning Commission Res. No. xx, Series of 2022 Page 2 of 2 Section 3: If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision and shall not affect the validity of the remaining portions thereof. FINALLY, adopted, passed, and approved this 21st day of June 2022. Approved as to form: Approved as to content: ______________________________ __________________________________ Katherine Johnson, Assistant City Attorney Teraissa McGovern, Chair Attest: _______________________________ Cindy Klob, Records Manager 63