AGENDA
CITY COUNCIL WORK SESSION
July 25, 2022
2:30 PM,
I.WORK SESSION
I.A.Work Session - Cozy Point Ranch and Maroon Creek Multi-use Trail Site Visits
1
AGENDA
City of Aspen, City Council Visit to Cozy Point Ranch & Maroon Creek Corridor
Work session
July 25, 2022 – 2:30 pm
Cozy Point Ranch
210 Juniper Hill Rd
2:15 - Departure from City Hall, Rio Grande level outdoor parking area
(Community Bank parking area. Please contact Matt Kuhn if transportation is needed.)
2:30 - Meet at the Camp Cabin – Austin, Matt, John and Nick
-Introductions / History
3:00 – Cozy Point LLC – Patti Watson - Description and walkthrough
3:30 – Farm Collaborative – Eden Vardy - Description and walkthrough
4:00 – Current Projects – Mike Tunte & John Spiess
-Grading and Drainage
-Learning Center
4:30 – Future projects – Matt Kuhn & John Spiess
-Riding Arena
-Butler Barn
-Quad and Housing Improvements
5:00 – Travel to Maroon Creek Trail
5:15 – Maroon Creek Trail Overview – John Spiess & Matt Kuhn
5:45 – Adjourn, return to City Hall
2
MEMORANDUM
TO:Mayor and City Council
FROM:John Spiess, Open Space & Natural Resource Manager
THROUGH:Matt Kuhn, Parks and Open Space Director
MEETING DATE:July 25th, 2022
RE:Cozy Point Ranch Site Visit
REQUEST OF COUNCIL:
The Parks and Open Space Department is seeking to provide a general overview of current Cozy Point
Ranch operations, and to discuss upcoming capital projects and seek Council guidance on project
prioritization at Cozy Point Ranch.
SUMMARY / BACKGROUND:
Cozy Point Ranch is a 168-acre City of Aspen open space property where lessees run a public
equestrian operation and a farm and garden learning center, with areas of wildlife habitat, a public
archery range, and historic buildings and agricultural activities. This authentic, working landscape,
located at the intersection of Highway 82 and Brush Creek Road, is the gateway to the communities of
Aspen and Snowmass.
The City of Aspen purchased Cozy Point Ranch in 1994. Monroe Summers was contracted by the
City to run the ranching operation in 2000, his leadership carried Cozy Point into the next decade
including the city embarking on a management plan process that began in 2014. From this work
emerged a 175-page management plan that was adopted by the City of Aspen in 2017. The overarching
vision established is a broad, future oriented concept of Cozy Point Ranch that honors the land’s history
and unique attributes, the community, and the goals of the City of Aspen Open Space and Trails
Program:
Preserving our valley’s ranching heritage and fostering ecological & community health through
innovative management approaches that provide locally-grown food and enhance equestrian and
agricultural operations, while connecting the community with the land.
The City of Aspen amended its 2003 conservation easement for the Cozy Point Property in the spring of
2021 to reflect the values expressed by the community in the 2017 Management Plan. This revision
creates a central core within the ranch from which both Lessees, the Farm Collaborative and Cozy Point
LLC, can run their operations in accordance with the 2017 Management Plan. As part of the process two
3
of the three activity envelopes have been consolidated on the central portion of the ranch and their
overall size has been reduced from 24 acres to 21 acres (see exhibit).
Cozy Point Ranch is currently home to two lease holders, Cozy Point LLC and the Farm Collaborative.
Both Leaseholders entered into 10-year lease agreements with the City of Aspen in the Spring of 2018.
Cozy Point LLC, an equestrian operation, leases 45.3 acres and the Farm Collaborative leases 14.23 acres
(See exhibit). The lease agreements are notably different in that Cozy Point LLC agrees to pay one half
of its net profit to the City and the City assumes one half of the expenses incurred by Cozy point LLC.
DISCUSSION:
Current Projects
Cozy Point Grading and Drainage
This project addresses significant drainage and safety concerns that exist on Cozy Point Ranch due to the
lack of consistent drainage infrastructure. The first phase of this project is being performed by the in-
house parks construction staff, and will redirect the drainage of water around the horse paddocks and
operational areas at Cozy Point Ranch during the summer of 2021 and 2022. The parking lot will be
redesigned for better efficiency and increase general safety of vehicle circulation. The second phase of
this project will relocate leech fields and improve the horse paddock area with new fencing and
improved footing. The second phase of the project will be completed in the summer of 2023 with a
hybrid mix of contracted services for large scale grading, fence construction, and utility infrastructure,
while the parks construction staff will participate in final grading, irrigation, and planting. Currently this
project is ongoing and is a high priority for completion, and remaining requested funding proposed in
the 2023 (100 Fund) capital budget is $1,000,000.
Farm Collaborative Learning Center
The Farm Collaborative Learning Center will formalize the current agricultural learning activities that
occur at Cozy Point today by bringing them under one roof. This educational facility will operate as a
“farm park” and will host an array of school programs and community outreach events to explore
methods for solving global climate challenges through local food production. This project is being
completed with private funding and grants pursued by the Farm Collaborative. City staff have helped to
support the extension of infrastructure as well as assisted in the permit process through Pitkin County.
Future Proposed Projects
Riding Arena Remodel/Replacement
The Riding Arena is a 25,000 square foot steel framed structure. Visual inspection of the building
indicate that the interior and exterior need an overhaul both to improve energy efficiency and
appearance. A recent structural analysis of the steel indicate that members are overstressed and
undersized per the current code. City Staff are still awaiting the final structural report which will indicate
whether the building can be strengthened and remodeled or if a total replacement is necessary.
Whether the building is replaced or remodeled, it is staffs hope that the building will have improved
energy efficiency and perhaps can hold solar panels on the large south facing roof.
Financials: The upcoming proposed Capital budget requests $75,000 in 2023 for architectural and
permitting work that leads into $500,000 proposed for 2024 for roof replacement and energy efficiency
improvements of the riding arena. Recent architectural and structural assessments indicate that the
4
buildings may not be able to support new roof assemblies as currently constructed, therefore the final
number in 2024 may be subject to change as further analysis is performed.
Boarding Facility Renovation
The Butler barn (also known as the Boarding Facility) is 10,500 square foot horse and tack barn. The barn
has seen some upgrades over the past several years to improve safety, however the original structure
was designed as a private horse facility, and does not fully meet the needs as a current publicly owned
horse facility. The wood framed structure is heavily used and requires consistent maintenance to
maintain safe conditions. In a recent study by an architect, it was suggested that this building will need
replacement in the short term because of wear and tear from the operation as well as the age of the
building.
Financials:This project has a proposed budget of $150,000 in 2024 with for planning, design, and
permitting, and is followed by a $1 million proposed funding allocation in 2025 for construction.
Wildlife Corridor Partnership Study
Staff have initiated conversations with several stakeholders regarding options of improving wildlife
transit in the vicinity of Cozy Point Ranch. The City is uniquely positioned to participate in this
conversation, since the City owns property on both sides of Highway 82 in areas of known wildlife
migration and movement. After initial conversations with Parks and Wildlife, and the Department of
Transportation, the City, in partnership with the Pitkin County Open Space and Trails program, will
undertake a feasibility study in 2023.
Financials: This project has a proposed budget of $50,000 in 2023.
Onsite Housing to support agricultural and equestrian operations:
Currently Cozy Point Ranch has 4 permanent residential units onsite. These units house staff for the
equestrian operation (Cozy Point LLC) and their families. There are two temporary units onsite that
house 4 employees for the Farm Collaborative. In 2019 an architectural contractor (Rowland and
Broughton) developed a preliminary housing master plan for the quad at Cozy Point ranch. The plan
looked at replacing the two existing freestanding housing units, adding three additional units for ranch
employee housing and remodeling the third pan abode as a bunkhouse. The current conservation
easement allows for this type of buildout within the ‘quad’ area, however, some questions remain
regarding water supply and wastewater treatment.
Financials: The planning and design of onsite housing improvements at Cozy Point Ranch is proposed to
begin in 2025 with $250,000 forecasted for planning and design, with implementation occurring in 2027
with a $4 million placeholder.
Brush and Cougar Creek Restoration
Brush Creek and Cougar Creek were both analyzed during the management plan process and identified
as future projects for ecological restoration. In the interim City staff have been working with
leaseholders to incrementally move operations away from the creek to achieve a 60 ft riparian buffer.
The design and implementation of an extensive riparian restoration will be needed to see significant
improvements in the riparian habitat and water quality. This project was originally slated for 2024 and
2025, but due to anticipated workload around the butler barn and riding arena, this has been pushed to
2026 and 2027.
5
Financials: The parks budget has identified $125,000 in 2026 and $275,000 in 2027 for design and
implementation of the Cougar and Brush creek restorations.
Summary and Council Discussion:
Is the following proposed project prioritization and timeline consistent with the majority of Council
members, or shall changes in timing and scope be made:
2023
1. Complete Grading and Drainage Project
2. Begin design and planning for Riding Arena improvements
3. Wildlife Corridor Feasibility Study
2024
1. Begin planning and design of Boarding Facility
2. Replace Riding Arena Roof (or complete structure)
3. Improve Juniper Hill Road surface (on Cozy Point Property)
2025
1. Construct new Butler Barn facility
2. Begin planning of Housing improvements
2026
1. Brush Creek and Cougar Creek restoration project
2027
2. Brush Creek and Cougar Creek restoration project
3. Housing Improvements
FINANCIAL/BUDGET IMPACTS:
The financial and project budget impacts are discussed in the preceding discussion in-line with each
project for improved project clarity.
Overall, the proposed projects comprise a significant portion of the Parks Fund budget over the next 5
years. It is not anticipated that this volume of projects and expenses will extend indefinitely, and it
should be noted that these projects aim to provide a stable, safe, and acceptable suite of facilities to
continue the various operations at Cozy Point Ranch for the foreseeable future. By making these
planned and targeted improvements, facility maintenance expenses will be buffered, reducing volatility
of unforeseen maintenance tasks.
ENVIRONMENTAL IMPACTS:
The projects that are underway will have a positive impact on the environment. The grading and
drainage project addresses critical water quality issues at the ranch and help further efforts to protect
and enhance Brush Creek and Cougar Creek.
Remodeling or rebuilding of the Butler barn and riding arena will generate construction waste and will
require large amount of material in their reconstruction. Improvements to these structures, however,
will improve energy efficiency and provide a potential location for a solar array that could produce
surplus energy according to a 2016 study.
6
ALTERNATIVES:
While staff have considered known variables and considerations, alternatives exist. Notably, Council
could direct staff to prioritize housing improvements over improvements to the riding arena and
boarding facility. This is something that staff have considered, however at this time, there are open
variables around waste water treatment, and potable water systems, that staff continue to work
towards long-term solutions.
Staff welcome further discussion on alternatives during the site visit and work session.
CITY MANAGER COMMENTS:
7
Full Property
Archery Range
Cougar Creek
Brush Creek
Cozy Point South
Aspen Mass OS
Cozy Point Ranch
Cozy Point Basics
- 168 Acres
- Purchased in 1994
- Open Space Designation 2003
- Conservation Easement 2003
(Ammended 2021)
- Management Plan Adopted 2017
8
Activity EnvelopeCozy Point Ranch
Activity
Envelope
A
(19 acres)
Activity
Envelope
B
(2 Acres)
9
Leased Areas
Cozy Point LLC
Cozy Point Ranch
Cozy Point LLC
Cozy Point LLC
Farm C.
Farm C.
10
11
MEMORANDUM
TO:Mayor and City Council
FROM:John Spiess, Open Space & Natural Resource Manager
THROUGH:Matt Kuhn, Parks and Open Space Director
MEETING DATE:July 25th, 2022
RE:Maroon Creek Multi-Use Trail
REQUEST OF COUNCIL:
The Parks and Open Space Department is seeking to provide Council with an update and site visit
regarding a large capital project that is being anticipated for 2023.
SUMMARY / BACKGROUND:
Maroon Creek is an important corridor for visitors and locals in the Aspen area. The current connection
between the roundabout at Highway 82 and the Aspen Recreation Center is a mixture of trail, sidewalk,
and roadway. While functional, the connection lacks clarity and does not provide a snow free route
year-round. This coupled with concerns about school safety and the rapid adoption of ebikes has added
urgency to provide a more clearly defined multi-modal trail within this corridor, and separate from the
district school campus. The project aims to create a safe year-round connection between the Highway
82 roundabout and the Aspen Recreation Center.
During phase 1 of the project city staff has worked with our consultant OTAK to examine potential
alignments for a 10-12’ wide hard surface multi-use trail. The schematic alignment that is taking shape is
generally within 30’ of the road for the entirety of the alignment with some of the segments being
directly adjacent to the road platform. Through the process the city has worked with stakeholders from
Pitkin County, private landowners, and the school district to understand opportunities and constraints
presented by various alignments.
DISCUSSION:
Segment 1: Aspen Chapel to Alberta Moore Drive
Segment 1 is directly adjacent to the Moore Open Space owned by Pitkin County. The trail is separated
from the road with a landscape buffer for this entire segment. Originating at the Highway 82
roundabout the trail will connect to the park and ride level as well as the chapel bridge level. The trail
platform in this area will generally contour through the landscape with a variety of trail construction
types including retaining walls, at grade platforms and guardrail protected sections.
12
Segment 2: Alberta Moore Drive to ARC service entrance
The city has been unable to secure an easement for the trail to exist on the private parcel (referred to as
the S&J Parcel, or West Moore parcel). This, coupled with difficulties in developing alignments on the
school district side of the Maroon Creek Rd, have led the design team to consider shifting Maroon Creek
Rd. to the east so that the addition of the trail can occur within the City Right of Way. The roadway
realignment would have a total length of 1,020 linear feet with an average horizontal shift of 7ft. This
horizontal shift would allow the trail to fit within the right of way on the western side of the road. The
trail within this segment would be directly adjacent to the roadway and separated by a 6” curb. It is
important to note that current drawings are based on existing GIS linework within the city database. City
staff have recently contracted with Sopris engineering for a field-based survey to verify right of way
locations as well topography and utilities. The potential construction impacts of shifting the Maroon
Creek road for this segment are significant, and staff are working to better understand project timelines
and seek strategies to reduce the impacts of this phase of the project.
Segment 3: ARC service entrance to ARC bus stop
Segment 3 negotiates the tight corridor from the ARC service entrance to the ARC parking lot. The
existing pedestrian connection between the ARC and the school campus will remain with the proposed
Maroon Creek Trail passing underneath the wooden bridge. To accommodate both the existing trail and
the proposed trail, the final segment of the wooden bridge will be rotated slightly towards the ARC and
the two paths will be separated by a wall until they are connected just north of the existing bus stop.
Segment 4: ARC bus stop to Highlands Trail
Segment 4 connects the ARC to the Highlands Trail at the Iselin tennis courts. This portion of the trail has
historically been difficult to navigate because of a lack of clarity and the multiple uses that converge at
this point including through traffic, parking, the bus stop and pedestrians entering and leaving the
facility. The proposed alignment moves the pathway to the east side of the parking lot which will
separate ARC users from trail through-traffic. The difficulty in this location is maintaining existing parking
as well as limiting impact to the landscape buffer. To fit the trail within this area the design suggests
reducing the parking stall lengths by 2 ft and using wheel stops to prevent bumper overhang on the trail.
This would change the 26 existing spots on the eastern edge of the parking lot to ‘compact’ parking
spots. After crossing the entrance to the ARC parking lot the trail will follow and alignment that is closer
to the road and connects to the new design for the Iselin tennis courts.
FINANCIAL/BUDGET IMPACTS:
The contract for the design, planning and engineering of the Maroon Creek Multi Use-Trail is included in
the 2021 Parks (100) Fund Capital Project Budget, as project 50964 Maroon Creek Road Trail. The
contract amount for the completion of Phase 1 of the Maroon Creek Multi Use Trail is $122,530. An
additional $150,000 is appropriated in the 2022 budget, and these funds will be used for the remainder
of the project survey, and construction documents. An opinion of probable cost was submitted by OTAK
in June of 2022 that anticipates a total project cost $3,964,704 and staff have proposed a $4 million
budget line in 2023 for construction. Staff anticipate seeking partnership funding opportunities for the
construction phase.
ENVIRONMENTAL IMPACTS:
13
Proposed alignments will impact currently undeveloped land adjacent to Maroon Creek Rd. Impacts will
be generally limited as the trail stays within 30 ft of the existing roadway. It is anticipated that the
implementation of this project will encourage the use of alternative methods of transportation within
the Maroon Creek corridor.
ALTERNATIVES:
Council could direct staff to seek alternative timelines for construction, or to delay the project.
Staff welcome discussion in-person during the site visit of the Maroon Creek multi-use trail project.
STAFF RECOMMENDATIONS:
Parks and Open Space Staff recommend support for the schematic alignment developed by city staff and
OTAK.
CITY MANAGER COMMENTS:
14
MAROON CREEK MULTI-USE TRAIL
The Study Area
15
Trail Characteristics and Design Parameters
MAROON CREEK MULTI-USE TRAIL
Surfacing:Paved surface that will be cleared of snow in the winter
Width: The trail will be a minimum of 10 ft wide to accommodate a variety of users.
Grade: The trail will meet ADA accessible guidelines, including a maximum 5% grade where
practical.
Separation from Road: Provide safety and comfort for all user groups by providing
separation from Maroon Creek Roadway where possible
Minimize Impacts: Prioritize alignments that have the smallest impact on the existing
conditions.
Winter Maintenance Considerations: Trails that are continuous with road
surface or directly adjacent to plowed surfaces are very difficult to maintain and should be avoided
where possible.
16
Project Phasing
MAROON CREEK MULTI-USE TRAIL
•Trail Layout Alternatives
•Opinion of Probable Cost
•Community Outreach
PHASE 1:November 2021 –August 2022
•Design Development
•Construction Documents
PHASE 2:August 2022 –January 2023
•Construction
PHASE 3:Summer 2023
17
MAROON CREEK MULTI-USE TRAIL
Segment 1
18
Section 1
19
Section 2
20
Section 3
21
Section 4
22
Section 5
23
Section 6
24
MAROON CREEK MULTI-USE TRAIL
Segment 2
25
MAROON CREEK MULTI-USE TRAIL
Segment 2
Begin Road Shift
End Road Shift
Proposed Wall
Total Length of Shift = 1,020 lf
Proposed Trail
Existing Road Edge
Proposed Road Edge
Average Shift = 7 ft
26
MAROON CREEK MULTI-USE TRAIL
Segment 2
27
MAROON CREEK MULTI-USE TRAIL
Segment 3
28
MAROON CREEK MULTI-USE TRAIL
Segment 3
29
MAROON CREEK MULTI-USE TRAIL
Segment 3
30
MAROON CREEK MULTI-USE TRAIL
Segment 3
31
MAROON CREEK MULTI-USE TRAIL
Segment 3
32
MAROON CREEK MULTI-USE TRAIL
Segment 4
33
MAROON CREEK MULTI-USE TRAIL
Segment 4
34
MAROON CREEK MULTI-USE TRAIL
Segment 4
35
MAROON CREEK MULTI-USE TRAIL
Estimate
36