Loading...
HomeMy WebLinkAboutresolution.council.095-22RESOLUTION #095 (Series of 2022) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CHANGE ORDER BETWEEN THE CITY OF ASPEN AND GILBERT SANCHEZ ARCHITECT PLLC AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE ORDER ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a change order for Old Powerhouse Preservation Design Services, between the City of Aspen and Gilbert Sanchez Architect PLLC, a true and accurate copy of which is attached hereto as Exhibit "A"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that change order for, $37,900 between the City of Aspen and Gilbert Sanchez Architect PLLC a copy of which is annexed hereto and incorporated herein and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ, AND ADOPTED by the City Council of the City of Aspen on the 9th day of August 2022. Torre, Mayor I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, August 9, 2022. Nicole Henning, City Clerk cept ne G up Collaboration I Opportunity I Guidance July 26, 2022 Mr. Rob Schober Capital Asset Director City of Aspen 130 South Galena Street Aspen, CO 81611 CITY OF ASPEN — CITY OFFICES: GILBERT SANCHEZ ARCHITECT PLLC PROPOSAL Dear Rob: The purpose of this letter is to recommend the approval of the Gilbert Sanchez Architect PLLC Proposed Change Order to master contract agreement which was executed on February 13, 2017, under resolution 15.2017. BACKGROUND In 2017, the City started work on the City Offices project and changed direction to accommodate ACRA while City Offices was built. Now, Council has directed the team to go back to the original plan to make the Old Powerhouse the permanent space for additional City offices and a possible public meeting room. This proposal is to reset the schematic design to the Old Powerhouse through permit documents. PROJECT COSTS The cost of this proposed change order is $37,000.00 for new schematic design process. Construction Administration will be handled in future change orders. As the design team understands the overall scope of the project there may be future design change orders. Total Cost of Proposed Change Order: $37,900 Best Regards, Jack Wheeler President Concept One Group, Inc. OLD POWERHOUSE REMODEL / PHASE III SUPPLEMENT TO THE AGREEMENT FOR ARCHITECTURAL SERVICES C/O Jack Wheeler Concept One Group wheeler@conceptonegroup.com Dear Jack, This letter outlines revisions to the Architectural Services identified in our AIA B101-2007 Agreement dated February 13, 2017. These services have previously been modified at the request of the City of Aspen to accommodate the City's changing needs. Phase I (Temporary location of City offices on the second floor) and Phase II (Temporary location of ACRA on the first floor) were completed in 2017 and 2018. This document addresses the anticipated scope of work for the Schematic Design tasks for Phase III which is intended to accommodate long-term City of Aspen office use. REVISIONS TO THE AGREEMENT ARTICLE 1.1 Add the following Phase III Schematic Design Scope of Work: Architect / Gilbert Sanchez Architect PLLC a. Schematic Design • Space Programming • Floor Plans • Roof Plan • Elevations • Exterior Lighting Plan • Preliminary Finish Selections • Coordination of the Design Team b. Pre -Application Conference with City of Aspen c. HPC Application + Initial HPC Review d. Three Progress Review Meetings w/ City Staff e. City Council Review 2. Civil Engineering Services / TBD a. Utilities b. Stormwater Management • Site Plan Impacts • Landscape Coordination • Gutters + Downspouts 3. Preservation Consultant / Wiss Janey Elsner a. Building Assessment • Masonry Preservation • Roof Assembly • Waterproofing gilbert sanchez architect pllc / 300 south spring street #202 / aspen, colorado 81611 / grsanchezaia@gmail.com 4. Structural Engineer / TBD a. Schematic Design Narrative • Roof Assembly • Elevator MEP Engineer / IMEG a. Review Previous Reports • Boiler • Alternative Energy Opportunities b. Schematic Design Narrative • Electrical • Mechanical • Plumbing • Fire Suppression 6. Landscape Architect / Bluegreen a. Tree Removal Identification b. Landscape Schematic Design ■ Site Plan Impacts • Civil Coordination • Gutters + Downspouts ARTICLE 1.2 Add the following: Documents for the Phase III Schematic Design tasks shall be completed by December 1, 2021. The date for HPC review is subject to the HPC calendar and remains to be determined. ARTICLE 11.5 Add the following. For Phase III Schematic Design work, see Exhibit E ByArchiteqU Gilbert Sanchez, AIA Principal, Gilbert Sanchez Architect PLLC Date: 10/08/21 By Client: Jackwheeler Concept One Group Date: gilbert sanchez architect pllc / 300 south spring street #202 / aspen, colorado 81611 / grsanchezaia@gmail.com 2 Phase III CoA Old Powerhouse Remodel Phase III Schematic Design Work October 8, 2021 '.EXHIBIT E Firm or Subconstultant Role on Project Fees Total Comments SD Expenses GSA Architect $15,000 $500 $15,500 ME Preservation + Roofing $12,000 $500 $12,500 TBD Civil Engineer $2,000 $300 $2,300 It is anticpated that stormwater management for the project will be required. TBD Structural Engineer $1,500 $300 $1,800 IMEG MEP Engineer $2,000 $1,000 $3,000 Fire Protection (sprinkler+alarm) performance spec only Bluegreen Landscape Architect $2,500 $300 $2,800 Work includes stormwater management solutions. 0 0 Design Team Fee Total $35,000 $2,900 $37,900