Loading...
HomeMy WebLinkAboutFile Documents.121 Juan St.0040.2019 (5).ARBK MECHANICAL LEGEND NOTE ALL CAHDanwwcNG LINES INDICATE BELOW FLOOR ELEVATION UNLESS OTHERWISE GENERAL NOTES OR AS SHOWN ON DRAWINGS.PROVIDE CONDENSATE PUMP IF PROPER SLOPING OF DRAIN PIPE IS NOT ,�� NOTED ONADEQUATE.COORDINATE WITH PLUMBING CONTRACTOR. SYMBOL ABBREV. DESCRIPTION SYMBOLMM ABBREV. DESCRIPTION SYMBOL ABBREV. DESCRIPTION 1 ia. 1. FOLLOW ALL APPLICABLE CODES AND ORDINANCES.PAY ALL FEES AND PERMITS AND ATTAIN THE SAME. 13. THIS CONTRACTOR SHALL COORDINATE ALL DUCTWORK WITH OTHER TRADES PRIOR TO INSTALLATION. Cl1 MOTORIZED 2. ALL EQUIPMENT,INSULATION,AND CONTROLS TO MEET LOCAL JURISDICTIONAL AUTHORITY'S ADOPTED 14. WEATHERPROOF ALL MECHANICAL ROOF PENETRATIONS PER CODES AND ALL ROOFING MANUFACTURER • OABRYAN CONDENSER WATER cws WATER El SUPPLY ENERGY CODE. RECOMMENDATIONS. ` DUCT SI.DOOR FSHEEET PARTNERSHIP INC. CR TER SUPPLY RN VENTURI BALANCE NBA NUMBER WIDTH aBEcarvo 3. VISIT SITE AND ASCERTAIN EXISTING CONDITIONS PRIOR TO BID. 15. PROVIDE FIRE OR SMOKE DETECTORS ON RETURN FOR MECHANICAL SYSTEMS OVER 2000 CFM AS REQUIRED n 4. THE INFORMATION PRESENTED ON THIS DRAWING IS DIAGRAMMATIC AND IS NOT TO BE SCALED.IT DOES NOT BY CODES OR BUILDING STANDARDS.IF TWO OR MORE MECHANICAL SYSTEMS(I.E.ROOFTOP UNITS)SERVE u REFRIGERANT PI'J REDUCED PRESSURE WAFERACKPLOWPR IS DEPTH. NECESSARILY REPRESENT ALL ELBOWS,DUCT EXTENSIONS,OFFSETS,HANGERS,ETC.REQUIRED FOR A THE SAME AREA AND WHEN COMBINED EXCEED 2000 CFM,A FIRE OR SMOKE DETECTOR SHALL BE INSTALLED ARCHITECTS-A.I.A. Cal CHILLEDwRONPUSUlDDM BACR'FLOw PREVENrDR DUCT ELBOW wI TURNING VANE COMPLETE WORKING SYSTEM. ON THE RETURN OF EACH UNIT WHEN REQUIRED BY LOCAL AUTHORITIES. . ' - RH REFRIGERANT HOT GAS IS GAS COCK -HWS- HWS HEATING WATER SUPPLY -III- UNION5.TEE wITURxlxc vnrvss 5. SHOP DRAWINGS SHALL BE SUBMITTED ON ALL VALVES,FIXTURES,INSULATION,G.R.D.'S AND EQUIPMENT FOR 16. PROVIDE SLEEVES AND COLLARS FOR ALL DUCTWORK AND PIPES THROUGH WALLS,FLOORS,AND CEILINGS. -RAN- HWR HEATING WATER RETURN -I.- PIPE REDUCER RESPONSE PRIOR TO ORDERING.SIX(6)COPIES OF EACH IN ONE SUBMITTAL WITHIN 10 DAYS OF SIGNING SEAL ALL EXTERNAL PENETRATIONS WEATHER TIGHT WITH EXTERIOR COMMERCIAL GRADE CAULK. ENGINEERING ARCHITECTURE, -IFS- HPS HIGH PRESSURE STEAM I I STRAINER CONTRACT.CLEARLY NOTE ANY DEVIATION BETWEEN SUBMITTED ITEMS AND SPECIFIED ITEMS ON THE COVER FIREPROOF ALL PENETRATIONS OF FIRE RATED WALLS,FLOORS AND CEILINGS. HEAR HIGH PRESSURE STEAM RETURN ,�, STRAINER WBLOWOFFVALVE r QMANUAL DAMPER UADRANT. wlLorxwc SHEET OF THE SUBMITTAL FAILURE TOSUBMRMAYCAUSESPECIFIEDITEMSTOBEREJECTEDAND 17, CONFIRM VOLTAGE, ANDAMPACITYWITHELECTRICALCONTRACTORPRIORTOORDERINGEQUIPMENT. 5737 W 6TH AVE. PLANNING,INTERIORS -LIM- LPS LOW PRESSURE STEAM ~�, REPLACED AT CONTRACTOR'S EXPENSE. ALL CONTROL AND INTERLOCK WIRING FOR MECHANICAL EQUIPMENT BY MECHANICAL CONTRACTOR.THREE PHASE MOTORS TO HAVE MAGNETIC STARTERS WITH PROTECTION ON ALL THREE LEADS.CONTROLS AND LAKEWOOD CO 80214 PRESSURE STEAM RETURN F.o. FLOOR DRAIN ENTR 6. EXTRA COSTS OR CHANGES ALLOWED ONLY IF APPROVED IN WRITING BY THE ARCHITECT/OWNER WITH P.O.Box 2773 VACUUM EQUIPMENT ROOM DRAM MOTORIZED DAMPER DOLLAR AMOUNT PRIOR TO ORDERING.NO EXTENSIONS OF COMPLETION TIME ALLOWED WITHOUT WRITTEN HEATING/COOLING EQUIPMENT TO AUTOMATICALLY RESTART AFTER POWER FAILURE.ALL WIRE TO BE IN PHONE(303)421-3208 620 Main Street, Suite 8 -VAC- VAC TROGEx FLOOR SINK.HALF GRATE AUTHORIZATION. CONDUIT WHERE REQUIRED BY CODE. � F.B. FLOOR SINK IN GRATE /III FLEXIREDUCTCONNECTOR FAX (303)421-3209 Frisco,CO 80443 7. THIS CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL FIELD CONDITIONS PRIOR TO THE PURCHASE OF ANY 18. ALL RECIRCULATED AIR SHALL PASS THROUGH STANDARD 30%MERV 8,THROW AWAY FILTERS.PROVIDE ONE Tel: 970.668.1133 - WE FIRE WATER DRAIN ABOVESPIN-IN FITTING MI/ MATERIALS AND THE COMMENCEMENT OF ANY WORK AND IS TO NOTIFY THE ARCHITECT OF ANY ADDITIONAL CLEAN SET FOR OWNER AT PROJECT COMPLETION. Fax: 970.668.2316 ---- R.O. ROOF GRAIN As DUCTTuauFF Fen DISCREPANCIES FOR RESOLUTION. 19. A MINIMUM CLEARANCE OF 36 INCHES SHALL BE PROVIDED AROUND ANY EQUIPMENT OR COMPLY WITH --- TWO HOT WATER RECIRCUUTE 0 O,Ro, ROOF DRAIN• 8. PROVIDE OWNER WITH 3 SETS OF TYPEWRITTEN AND BOUND"OPERATING INSTRUCTIONS'FOR ALL SYSTEMS MANUFACTURER'S REQUIREMENTS(I.E.,FANS,PUMPS,BOILERS,AIR CONDITIONERS,ETC.)FOR SERVICE AND .► DOWNSPOUT NOEMME 5M DOOR UNDERCUT AND EQUIPMENT,INCLUDING MANUFACTURER'S MAINTENANCE MANUALS.INCLUDE APPROVED EQUIPMENT MAINTENANCE.GAS FIRED APPLIANCES SHALL BE VENTED PER THE MANUFACTURER'S LISTING.PROVIDE L - VENT VENTWASTE ® CO RLEANOST-VERTICAL SUBMITTALS,EQUIPMENT START-UP REPORTS,LUBRICATION,FILTER TYPES AND SIZES,BALANCE REPORT, COMBUSTION AIR AS REQUIRED PER CODE. 02 - VW GREASE WASTE II- CO CLEANOUT-HORIZONTAL uc®E FIREFIRE DAMPER DAMPER STARTING AND STOPPING PROCEDURES,AND LIST SERVICE CONTRACTOR'S 24 HOUR TELEPHONE NUMBERS. �Jti. E- Q y SAND OIL WASTE 1- EAR BREAK•MISC. _a 9. CONCEAL ALL WORK IN FINISHED AREAS. 20. TEMPERATURE CONTROLS-THE HVAC SYSTEM CONTROLS ARE TO BE FULLY AUTOMATIC.ALL CONTROLS ARE "ACM? --c- GAS Gas FIFE J L Era VENT THRD ROOF EEIN LING FIREDAMPER 10. CUT AND PATCH TO MATCH ADJACENT AREAS.NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED TO BE ELECTRIC.TEMPERATURE CONTROL SETUP AND SETBACK SHALL BE ACCOMPLISHED BY MEANS OF AN ® ELECTRIC THERMOSTAT WITH THE FOLLOWING FEATURES BEING STANDARD: O PIPE DDOOWNILI WITHOUT STRUCTURAL ENGINEER'S WRITTEN APPROVAL. PIPE TEE GOWN W x WR 11. GUARANTEE ALL LABOR AND EQUIPMENT FOR ONE YEAR FROM THE DATE OF ACCEPTANCE BY OWNER. a.ADJUSTABLE HEATING AND COOLING SETPOINTS. WALL HYDRANT b.NIGHT AND WEEKEND PROGRAMMABLE SETBACK. El PIPE ME UP Q! CONNECTION NEW TO EXISTING. 12. PROVIDE FACTORY AUTHORIZED START-UPS AND WRITTEN START-UP REPORTS ON ALL EQUIPMENT_ • -X- GATE VALVE H e c.AUTOMATIC CHANGEOVER BETWEEN HEATING AND COOLING CYCLES. OS XOBEBIBB FLEXIBLE PIPE CONNECTION 13. PROVIDE NICKEL-PLATED FLOOR,WALL,AND CEILING ESCUTCHEONS OF ADJUSTABLE TYPE ON ALL PIPES D.MINIMUM JOB EIGHT(8)HOUR BATTERY BACKUPS DURING POWER FAILURE. www.oparch.com -MN- GLOBE VALVE Q THERMOSTAT PASSING THROUGH WALLS,PARTITIONS,AND FLOORS AFTER PAINTING IS COMPLETED. B.OPTIMAL SYSTEM STARTUPS TO ENSURE CORRECT TEMPERATURE AT OCCUPANCY. -� ® P. PUMP BALL VALVE ® REMOTE SENSOR f. ALL CONTROL SYSTEMS SHALL BE DESIGNED AND PROVIDED BY A CONTROL MANUFACTURER WHO HAS 7. BEEN IN THE BUSINESS OF MANUFACTURING,DESIGNING AND INSTALLING CONTROL COMPONENTS AND O BUTTERFLY VALVEPREssuRENEmP.REUER ® CARBON DIOXIDE SENSOR MECHANICAL NOTES SYSTEMS FOR A MINIMUM OF TEN(10)YEARS. 6 RUG VALVE AIR VENT CARBON MONOXIDE SENSOR T QH HUMIOIsrAT �P 1. IDENTIFY ALL HVAC AND REFRIGERATION EQUIPMENT AS TO THE AREA SERVED BY THE EQUIPMENT. 21. HEATING AND COOLING LOAD DESIGN CONDITIONS: I'" CAS COCK AND UNION R GUIDE(SLEEVE) IDENTIFICATION SHALL BE ENGRAVED PLASTIC TAGS PERMANENTLY AFFIXED TO EACH PIECE OF EQUIPMENT. a.WINTER INDOOR DESIGN TEMPERATURE:70°F a STOP DRAIN VALVE PIPE EXPANSION PIPE ANCHOR DINT 2. PROVIDE ALL CURBS,SUPPORTS,AND ANCHORS FOR MECHANICAL WORK.NO CHAIN,TAPE,OR WIRE MAY BE b.WINTER OUTDOOR DESIGN TEMPERATURE:-15°F C! auto RawcoxTaoLVALVE USED FOR HANGING OR SUPPORTING.PROVIDE AND INSTALL ALL NECESSARY SHIMS AND LEVELING DEVICES c.SUMMER INDOOR DESIGN TEMPERATURE:75°F irJ SMOKE DETECTOR TO PROPERLY INSTALL ALL EQUIPMENT IN A LEVEL CONDITION. D.SUMMER OUTDOOR DESIGN TEMPERATURE:82°F/60°FWB Z "Lib BALANCING VALVE $ BOILER DRAIN VALVE EXISTING ITEM LINE WEIGHT DEMO ITEM LINE WEIGHT 3. RECEIVE,UNCRATE,ASSEMBLE,INSURE,AND INSTALL IN CONFORMANCE TO MANUFACTURER'S e.OVERALL DESIGN AIR LEAKAGE RATE:0.10 ACH(AVERAGE) I 0 TEMP. 2-WAY IN VW HOSE END E RECOMMENDATIONS ALL EQUIPMENT FURNISHED BY THIS CONTRACT AND FURNISHED BY THE OWNER. I. DESIGN AIR LEAKAGE RATE:90 CFM47 TEMP.CONTROL.s.Wnv CONNECTION. WEIGHTS N 4. THE NEW MECHANICAL SYSTEMS CONSISTING OF THE AIR DISTRIBUTION SYSTEM WITH:DUCTWORK,FLEXIBLE BA3 3.WAY VALVE eV) DI DUCT,DIFFUSERS,GRILLES,DAMPERS,CONTROL SYSTEMS,ETC.SHALL BE BY THE MECHANICAL CONTRACTOR. Q CO CA PRESSURE REDUCING VALVE AEI FLEX ;''.`L5 Fi[ 5. CEILING CAVITY IS NOT A RETURN AIR PLENUM. SEQUENCE OF OPERATION D A SOLENOID.. IR7 RELOCATED xD,/ X0ZE 6. DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS.OVERALL OUTSIDE DUCT DIMENSIONS SHALL BE ADJUSTED to Q'X DIFFUSER ID. TO ALLOW FOR ANV LINER THICKNESS. EXHAUST FANS: PRESSURE GAUGE Y VACUUM A M W a FLOW T05000 THERMOMETER RIGID DUCT 7. ALL SHEET METAL TO BE MADE AND INSTALLED TO SMACNA SEAL CLASS B STANDARDS WITH 45 DEGREE EF-1(WHOLE HOUSE VENTILATION) D T NEOIL a,%9EDaNTHISFRascT ARE MAXIMUM REDUCING,30 DEGREE MAXIMUM EXPANDING TRANSITIONS.ALL EXPOSED RECTANGULAR DUCTS TO FAN SHALL RUN CONTINUOUSLY TO PROVIDE VENTILATION WITH SWITCH FOR HIGHER CFM. W a O NOTE.NOTULGEBONsISF BE PAINT LOCK GALVANIZED. PROVIDE HOLLOW BLADE TURNING VANES ON 1.5 CENTERLINE RADIUS FOR ALL - I ELBOWS AND TEES.HVAC SUPPLY AND RETURN RECTANGULAR DUCTS TO HAVE A MINIMUM 1-1/2"THICK,RS ryj JO THERMAL PERFORMANCE,0.7 NRC SOUND ABSORPTION RATED DUCTLINER.ALL OUTSIDE AIR DUCTS TO HAVE BOILERS: LEGEND SPECIFICATION LIST NOTE NOT uVALVES OH THIS LIST ARE 2"THICK,R8 INSU ATION,0.9 NRC SOUND ABSORPTION RATED,UL 181 CLASS ONE FIBERGLASS DUCTLINER V NECESSARILY LAE000TxsFRaEcr ATTACHED WITH STIC-KLIPS I5"O.C.EACH WAY AND 100%COVERAGE OF FLAME PROOF ADHESIVE.INCREASE B-I DUCT TO ALLOW FOR LINER.SEAL ALL DUCT AIR TIGHT WITH TWO COATS OF DUCT SEALANT. BOILER B-1 AT EACH UNIT SHALL PROVIDE HEATING FOR THE INDIVIDUAL UNITS'BASEBOARD RADIATORS.BOILER SYMBOL DESCRIPTION SPECIFIED MANUFACTURER/MODEL EQUALS BY C/ 7 I ZZ Ca 11 or 8. CAULK ALL DUCT JOINTS AIR AND WATER TIGHT WITH PERMANENT COMMERCIAL CAULK PER MANUFACTURER'S CONTROLLER SHALL CONTROL THE BOILER OPERATION,PUMPS AND DOMESTIC WATER RESET.THERMOSTATS _ I Z MJd - TE VA IN GROUND Box MLwauKEE/los or its NIB. RED Vain RECOMMENDATIONS. ASSOCIATED WITH EACH ZONE SHALL OPERATE APPROPRIATE ZONE VALVES AND INTERFACE WITH THE BOILER a.w NO VALVE GR MILWAUKEE/ssoror ITNDT NIB. STOCKKAM 9. CONCEALED ROUND DUCTS SHALL BE LOW PRESSURE CONSTRUCTION,SEALED AIR TIGHT AND EXTERNALLY CONTROLLER. INSULATED WITH 1-1/2",3/4 LB.DENSITY BLANKET INSULATION WITH FOIL SCRIMCRAFT FACING.SEAL ALL A NEPTUNE G-50-IA OR EQUAL GLYCOL FEEDER(GF-1)MAINTAIN THE PROPYLENE GLYCOL MIXTURE NOTED ON THE N 1smT,F2s7MMIA1.sae,orlANO SERIES weCo STOCMUN DRAWINGS AT EACH BOILER B-1 SYSTEM, 2 DJ AUTO FLOW CONTROL VALVE JOINTS WITH CAULK AIR TIGHT. 151 Pwc VALVE 0. INTERIOR OF ALL DUCTS VISIBLE THROUGH GRILLES,DIFFUSERS,ETC.TO BE PAINTED WITH TWO COATS FLAT PUMPS: JC :5 BUTTERFLY VALVE MILWAUKEE 1 CLi 223 orr OL KEYSTONE CENTERLINE BLACK PAINT. S STOP/DRAIN VALVE WATTS/ea000 or scoot for - 11. ALL ROUND DUCT TAKEOFFS SHALL BE CONICAL BELL MOUTH SPIN-IN FITTINGS WHERE DUCT DIMENSION P-I(PRIMARY LOOP CIRCULATOR) A 'd PALL VALVE MILWAUKEE/Bwtoo or BA-150 NINCO APOLLO ALLOWS. PUMP SHALL OPERATE WHENEVER THERE IS A CALL FOR HEATING FROM THE SYSTEM. BALANCING VALVE ROWSET I ACCUSETTER GERARD 12. PROVIDE CONDENSATE DRAIN PIPING FOR ALL SPLIT SYSTEM COOLING COIL UNITS,I.E.FAN COIL UNITS, _pt,_ TEMP CONTROL- . FURNACES,AIR HANDLING UNITS,ETC.ALL UNITS SHALL HAVE INTERNAL DRAIN PANS OR PROVIDE A DRAIN P-2(BOILER CIRCULATOR) sit, Cg1 TEMP CONTROL.3.WAY BY TS.CONTRACTOR . • PAN CAPABLE OF CAPTURING ALL COOLING COIL CONDENSATION.PIPE DRAINS TO NEAREST PLUMING FIXTURE PUMP SHALL OPERATE UPON A CALL FOR HEAT FROM BOILER.INTERLOCK W/BOILER CONTROLLER. ti TEMPERING VALVE LEONARD LOWAER • LA PRESSURE REDUCING AVALVE SOLENOID VALVE ASCOT RED HAT SENOR BURKET BASEBOARD RADIATORS: b BALANCEWA VALVE • A WALL MOUNTED THERMOSTAT WILL CONTROL THE ACTION OF EACH ZONES CONTROL VALVE.UPON A CALL FOR ----'- v NTURII FLOWSEO VW GERUND BANCD HEATING FROM THE ZONE THERMOSTAT THE CONTROL VALVE SHALL OPEN. ___, REDUCED PSSUUNTOR WATTS I BOOTS • - 15 GAS COCK MAXIMOUBV37 or BM • - IlI STRAINER WATTS/SERIES 7/STWIA'REA.PA' OJFERACO PECRE? ONE I. STRAINER W,BLOWOFF VALVE WATTS/SERIESWANBS BLOB,VALVE COEIRACO K=CIDEY BALD MOUNTAIN V1 PRESSURE/1E1AP.RELIEF WATTS 1SEWESI0,1,10,NO,or 310 - r.))D E V E L 0 P DO E N T ll' MANUAL AIR VENT ROWSET OW • - T PT TAP FLOWSET/SUPERS. UNIVERSAL/NSP N PETERSON/PETE,PLUG Revisions: BOILER DRAIN VALVE MILWAUKEE IBA ISO H NIBCO RED EWHITE Contract/Pricing THERMOMETER TRERIGE/8X01Ao31a WEKSIERIAATH ASHCROFTIMA 2.15.2016 PERMIT REVISIONS T PRESSURE GAUGE TRERIDE/BDDC WEKSLERIEAIN ASHCROFT/MAG 11.14.2�1/0 ® . 0 DAMPER PERMIT REVISIONS 2 Al . • 12.12.2016 _ q FLEXIBLE PIPE METRAFLEXIMETRASRHEREERDN MASON IMFNCEFDM ANABER.SDATH1 MOO EFDM A51 H 26 ll'A AUTOMATIC AIR VENT ANTROL70S HOFFMAN FLOWSET 5.02.2011 _0,II1 GAS PRESSURE REGULATOR SGILUNBEWDERLAEEN - • MR ADMITTANCE VALVE STUDORVFM - • BALL DM VVI HOSE END CONNECTION APOLLOYB-IO3•t 1a'N.P.T.BY HOSE NIB. STOCpWA aDACm .LTT� 1 'L- ,_. e/elp7 W z? ,,,,,,, .,,OFt CL,.,,, Date: 8.21.2OI5 Project No: 2541.00 r,„ �� Drawn by: ATA ]IChecked by: RJW 08/2019 IV FOR000bG01411 6 E tonyf M 1 •0 MECHANICAL ©COPYRIGH NOTES ED ,r 019 5001-AHM1.0 MECHANICAL NOTES.DWG 8/1/2017 3:45 PM ASPEN BUILDING DEPARTMENT ill° Wriiii J CONDENSING BOILER SCHEDULE -JUAN STREET AHU II1 CAPACITY(MBH) WORK OPER TEMP. FLUE&COMB AIR OPER ELECTRICAL REQ O'BRYAN IBC BOILER ADDITIONAL I/ PARTNERSHIP,INC. TAG TYPE AFUE PRESS PRESS WT. MODEL ALT.OUTPUT MAX EQ FEATURES REQ. S.L.INPUT g000FT PSIG PSIG EWT(°F) LWT(°F) SIZE TYPE FT EA LBS. VOLT/PH AMP MOCP . ARCHITECTS-A.I.A. B-1 SL-28-160 CONDENSING 160 152 95 30 18 160 180 3"0 CPVC/PVC 100 142 120/1 2.1 15 1,2,5,6,7,8(F1),10,11,12 ~, SCH 40 FEATURES: ENGINEERING ARCHITECTURE, 'FLOWS BASED ON HIGH SPEED PUMP W/MAX4 FT PIPING P.D. 5737 W 6TH AVE. PLANNING,INTERIORS 1. PID CONTROL LOGIC MODULATATION(30%TO 100%) 8. FLUE TYPE: LAKEWOOD,CO 80214 2.ELECTRONIC INTERMITTANT IGNITIION (Fi}SEALED COMBUSTION/FLUE SCHEDULE 40 PVC/CPVC. P.O.Box 2773 3.439 STAINLESS STEEL HEAT EXCHANGER (F2)-FLUE VENT SCHEDULE 40 CPVC EQUALS BY: PHONE(303)421-3208 620 Main Street, Suite 8 4.30%PROPYLENE GLYCOL 9. PROVIDE TEKMAR 263 MULTI BOILER RESET CONTROL W/BOILER INTERFACE MODULES. TRIANGLE TUBE FAX (303)421-3209 Frisco,CO 80443 5. 50%PROPYLENE GLYCOL 10. HIGH WATER&FLUE TEMPERATURE MANUAL RESET CONTROL. LOCHINVAR Tel: 970.668.1133 6. LOW WATER/FLOW PRESSURE CUT OFF 11. CONCENTRIC VENT TERMINATION KIT(3"ONLY)MODEL HMV KIT 13. VIESSMAN Fax: 970.668.2316 7. OUTDOOR RESET CONTROL W/DOMESTIC WATER PRIORITY 12. NEUTRALIZER KIT FOR CONDENSATE. ❑ ` •y, HYDRONIC PIPE SIZING CHART HYDRONIC BASEBOARD RADIATION SCHEDULE :�' IP PIPE SIZE(IN) MAX GPM MANUFACTURER BTUH/ TUBE TUBE FIN FIN/ ENCLOS. PD ADDITIONAL FEATURES 1/21.3 TAG MODEL LF LENGTH TYPE SIZE SIZE LF HEIGHT ROWS EWT LWT GPM/FT (FT/LF) REQUIREDEl 3/44 4 1 8 BBR-1 STERLING SR-3/4-60 680.0 SEE PLANS CU 3/4" 23/4 x 60 9" 1 180 160 0.08 0.23 1,2,3,4,5 www.oparch.com 1-1/4 13 3-3/4" 1-1/2 20 BBR-2 STERLING SR-3/4-60 680.0 SEE PLANS CU 3/4" 2-3/4"x 60 9" 1 180 160 0.08 0.23 1,2,3,4,5,E 2 45 3-3/4" 2-1/2 85 FEATURES: 3 140 1.WALL MOUNTED THERMOSTAT. 4.PROVIDE WALL TO WALL ENCLOSURE,WHERE SHOWN. 4 300 2.50%PROPYLENE GLYCOL 5.PROVIDE 6"END TO FLOOR WITH ACCESS DOORS FOR VALVE ACCESS. 3.PROVIDE COIN VENT WITHIN BASEBOARD ENCLOSURE WHERE SHOWN. 6.PROVIDE RETURN PIPE HANGER WITHIN ENCLOSURE FOR SAME SIDE INLET/OUTLETS. 20 MINIMUM OUTSIDE AIR VENTILATION RATES(PER 2009 IMC) EXPANSION TANK SCHEDULE -JUAN STREET AHU CCC VENT CCCURED AVERAGE OCCUPANT RATE- OCCUPANT TOT ROOM ACTUAL ACCEPTANCE TOTAL m OCCUPANCY HVAC SO.Fr COLING SPACE VENT RATE@ # CFANP C/N VENT-OW VENT RATE MANUFACTURER VOLUME VOLUME ADDITIONAL D ROOM DESIGNATIONS CLASSIFICATION SYSTEMS (Az) HEIGHT(FT) VOLUME(CF) .35 ACH(CFM) BEDROOM# (Pz) (Rp) (RpPz) (Vb.) -CFM COMMENTS Private Dwelling- TAG MODEL LOCATION SERVICE TYPE (GALLONS) (GALLONS) FEATURES JUAN STREET AHU LiAng Area EF-1 1880 10 18800 110 4 5 15 75 110 120 1 TACO GARAGE MECH.XT- HEATING WATER DIAPHRAGM 5 8 1 NOTES: CX-30 ROOM 1 1 1. ABOVE IS BASED ON 2009 IMC CHAPTER 4 FEATURES: lyV d 1.50%PROPYLENE GLYCOL N b o• I ZZ "NOTE:SEE INLINE PUMP PIPING DETAL TO RESIDENCES BBRS FAN SCHEDULE -JUAN STREET AHU W di� T T T 1., ALT. FAN SONES AT ELECTRICAL ADDITIONAL Z 2 MOTORIZED \ CONTROL VALVE A A 3/4" TAG MANUFACTURER MODEL FAN TYPE CFM S.P. RPM OPER.PT. HP VOLTS/PHASE FEATURES REQ. 5 TO T-STAY.SEE PLANS (TYPO EF-1 AIRKING ESB 130D CEILING DIRECT 80/40 0.30 800 0.3 30 WATTS 115/1 1,2,3,4 (TYP.3) \'. AIR SEPARATOR b b 'O `MOUNT VALVES ON FEATURES: 1.CORRECT ALL FAN RPM FOR ALTITUDE. 3.TWO SPEED OPERATION. CONTINUOUS OPERATION AT EQUALS BY AS-1 WALL OF MECHANICAL ROOM 2.FLAT ROOF CAP OR WALL CAP BY FAN MANUFACTURER. LOW SPEED W/WALL SWITCH FOR HIGHER AIRFLOW. COOK TACO ACO2-125 Si,1 \ 4.GRAVITY BACKDRAFT DAMPER. S&P mi� T PANASONIC I .5 a L d *P-1 1-112' ( PUMP SCHEDULE -JUAN STREET AHU /� 3/4- i SEE PLUMBING � FOR DWH PIP NG ( REMARKS& l{J B 1 b a I MANUFACTURER LOCATION SERIES FLOW HEAD ELECT FEATURES ONE JJII,, �I TAG MODEL DUTY TYPE GPM FT -' VOLT/PH REQ'D 1 �� II2 II INLINE BALD MOIINTAIN GAS ICI 1 F3 I I _ P-1 TACO 2445 HEATING WATER PRIMARY PUMP CIRCULATOR 18 25 3450 ® 120/1 1,2,3 r..Y DEVELOPMENT 1 . INLINE 1/7-, EXPANSION TANK P-2 TACO 0012 BOILER CIRCULATOR CIRCULATOR 18 8 3250 M 120/1 1,2,3 Cr I xT-1 1" Revisions: 1-1/2•� 1-1/2"J IWH-1 FEATURES REQUIRED: EQUALS BY: Contract/Pricing 1.NON-OVERLOADING MOTOR SELECTION. BELL&GOSSETTn 2.15.2(dliv GLYCOL FEEDER .5I 3"CONCRETE 2.INTERCONNECT WITH BOILER CONTROLLER. GRUNDFOSS AXIOM MF200 1„� CURB 3.SUITABLE FUR50%PROPYLENE GLYCOL. ARMSTRONG PERMIT REvISIONS 11.14.2016 BOILER PIPING SCHEMATIC PERMIT REvISIONB 2 NO SCALE 12.12.2016 ASI n 26 5.02.2017 I ROOF OR BLDG.OVERHANG ", ACR, PITCH FLUE PIPE DOWN TOWARD 6'END TO FLOOR 6"END TO FLOOR .A • - OUTLET 1/4"PER FT.FOR W/ACCESS DOOR W/ACCESS DOOR z•�-. CONDENSATE DRAINAGE. AT VALVES,TYP. AT VALVES,TYP. '"L- T&P PORT- MANUAL AIR VENT, MANUAL AIR VENTS �.` WHERE NOTED ON PLANS. WHERE AIR VENT, PLANS. 7y&el/I f - 18" EXTEND THRU COVER. EXTEND THRU COVER. F C�`,Q MIN. PARAPET OR 711-19 / � T ad)-9-'�/gyAEs`•4.BUILDINGADJOINING „ \ / I\ \ / \ ," ..OF C�PT'CLEARANCE THIMBLE 1 ,,,,,,,,nB,,,ISOLATION VALVE CHECK VALVE) \�\/ IIIIIIIIIIIIII. ,!IIIIIIIIIIIII :II:i \�\/ IIIIIIIIIIIIII� IIIIIIIIIIII •STRAINER W/ BALANCE VALVE \ /BLO VALVE FLOWSETACCUSETTER / \-/ I. Date: 8.21.2015 OUTSIDE WALL MIN CPVC FLUE VENT 74 r, r4 r SUPPLY ��'� Project No: 2541.00 SUPPLY RETURN RETURN INLINE PUMP PIPING DETAIL O CARRY INSULATION BALL VALVE,CONTROL VALVE& CARRY INSULATION BALL VALVE,CONTROL VALVE& THRU SLAB TO FINISH BALANCING VALVE,REQUIRED THRU SLAB TO FINISH BALANCING VALVE,REQUIRED Drawn by: ATA NO SCALE FLOOR MATERIAL ONLY. FOR EACH ZONE OF CONTROL. FLOOR MATERIAL ONLY. FOR EACH ZONE OF CONTROL. SEE 2/M2.1 FOR PIPING SCHEMATIC. SEE 2/M2.1 FOR PIPING SCHEMATIC. PVC COMBUSTION AIR _ Checked by: RJW 1T'MIN ABOVE GROUND BASEBOARD HEATER- BASEBOARD HEATER- iW HORIZONTAL VENT TERMINATION O OPPOSITE SIDE RETURN O SAME SIDE RETURN O o3/08/2D19 NO SCALE NO SCALE NO SCALE I�GOOhC 01W11ANCE M 1 .1 tonvf ICAL DETAILS ©COPYRIGH AND SCHEDU,+ ED • 019 S00T-AHM1.1 MECHANICAL SCHEDULES AND DETAILS.DWG 8/1/2017 3:45 PM ASPEN BUILDING DEPARTMENT ' 13; 44 O'BRYAN PARTNERSHIP,INC. `` ( ARCHITECTS-A.I.A. ENGINEERING ARCHITECTURE, 5737 W 6TH AVE. PLANNING,INTERIORS LAKEWOOD,CO 80214 P.O.Box 2773 PHONE(303)421-3208 620 Main Street, Suite 8 FAX (303)421-3209 Frisco,CO 80443 Tel: 970.668.1133 Fax: 970.668.2316 GENERAL NOTES: ❑ ❑�.:; . 1. ROUTE HWSIR PIPING WITHIN THE INSULATED CEILING JOIST BAY. "Aid 2. MOUNT ALL T-STATS AND MECHANICAL CONTROLLERS AT 46"A.F.F. "AR•• PER ANSI A117.1 SECTION 1004.9. WORK NOTES: 0 • O1 BALANCE AND CONTROL VALVES FOR BASEBOARD HEATERS.SEE BOILER www.oparch.com PIPING SCHEMATIC.TYPICAL ALL RESIDENTIAL BASEBOARD HWS/R BRANCHES. O PROVIDE TACO 417 COIN VENT OR SIMILAR WITH BASEBOARD RADIATOR. INSTALL WITHIN THE BASEBOARD ENCLOSURE. O ROUTE 3/4"HWS DOWN IN WALL TO BASEBOARD RADIATOR.(TYP FOR ALL LOWER LEVEL BASEBOARDS.) O 3/4"HWS PENETRATION THRU FLOOR TO BASEBOARD RADIATOR.SEE M2.1 I O FOR CONTINUATION.(TYP.FOR ALL UPPER LEVEL BASEBOARDS.) 71 C O 6"0 EXHAUST WALL CAP.ENSURE AT LEAST 3 FT CLEARANCE FROM G OPERABLE OPENINGS. G co O 3"0 PVC COMBUSTION AIR AND 3'0 CPVC FLUE TO 5'0 CONCENTRIC VENT N TERMINAL.ENSURE AT LEAST 4 FT CLEARANCE BELOW OPERABLE `O OPENINGS. a paQ� 0 RADON MITIGATION VENT UP THRU SLAB TO 10'ABOVE GRADE.PROVIDE W I POWER J-BOX FOR FUTURE EXHAUST FAN. / tby O O 4"0 DRYER VENT THRU EXTERIOR WALL W/APPROVED BACKDRAFT I/�fV� pC V DAMPER WALL CAP.ENSURE AT LEAST 3 FT CLEARANCE FROM OPERABLE OPENINGS. ^ V r I El; Z CP CP T cr) (---P T < R © O 32 3 " l 4-11' R� i-'---1 I _ _ O Qpi ONE T - --_ 2�r i„F ['` • I �2LF BBR-1 �n■ T u�di� �I ' Y'ii BLF BBR-1 2 III! �I�• I�IY11' IMP l — "r •, IIIII� IIIII� IIIII� O r.3Y D E V sM0 F M E NI T 3LiBB2 L 41 , SLF BBR-1 —__ _—- •'•m� EF-1 R-1 I M 2 ---- --- O 1 I 1 3 LF BBRO-1-1 I' �I F BBR-1 - Revisions: _'. 1 Pric 9 i i ,'BBR 1 O I I OO i Contract/ in r 2 152(IJIv n-II II - I11 -1� ® � —i PERMIT REVISIONS rlllW=��� _ _ PERMIT REVISIONS 2 II N �cCLs7, _1 rk- kilt, IIIII111-r ■ 5 --- �2.12.2fI��h 111 I �F I I1�9'U. II O / Io ��312.k 0 l5LFBBR-1 I 1000: 4-- ASI 11 26 \, lii I� L _ DRYER VEN . 8.(I�2.2017 / '1 rI� A I I�� LEI om 25LFW/390DEGE . i I! ii iF 6• 1: ATLEAST \- I DII I RYER MAX Q.FT.� 5 LF B -1 !4i 6 LF BER-1L aoum,I ll II `J - 5LF BBR-16 ..•.„,..,',s I. 4L BB' 1 9/ei/i1 �'•Z. /� _ 6 LF BBR-1 I ) -- _ 4 LF BBR-2 —- i - . 1 ii" _ III,__. _ �_ i-_ '%9 '�.,�°A'AL�}`Q���`; 3 Q'��L 3. BBR-1 m EIMIE ,,,,OF CON-o" I 5LF BBR-2 - II EF 1 Date: 8.21.2ID15 I�) 4ii= CD 2 LF BBR-1 tbh 7 _u K. 1 I i --- Project No: 2541.00 Drawn by: ATA OO Checked by: RJW 1 rea'�J8/2019 O LOWER LEVEL MECHANICAL PLAN ( )UPPERLEVELMECHANICALPLAN ED M2.O SCALE:3116"=1'-0" Z tonyf 41)- ©COPYRIGH MECHANICAL P►,., ' ED 1 019 AHM2.0 MECHANICAL PLANS.DWG 6/1/2017 3:45 PM ASPEN BUILDING DEPARTMENT