Loading...
HomeMy WebLinkAboutFile Documents.743 Cemetery Ln.0011.2018 (3).ARBK 0011_0012.2018.ARBK_Zoning Round 2 Comments Z-Zoning.743-745Cemetery.2018.9.Roundl.pdf(6) m /o 76.4�s Page: 'UB\ This needs to be revised to show Checkmark: Unchecked . � 50•Utility Easement Roc No..12842E Author:jeffreyb that there are no reas of lope File Name: Z-Zoning.743-745Cemetery.2018.9.Round1.pdf between 20/° 30/°and 30/°+ This needs to be revised to show that there e w t Response: The survey now shows that there are no areas of sloop between 20%-30%and slo20%30%nand 30 e 30%+and is submitted. In0loates 0X-20%slopes (no hatching) —14003 of,are0W 100% Page: 'UB\ ofA,' The previous survey showed t GPS Co"el7 Me"me"t Checkmark: Unchecked OPS-20 ELE✓=7906.4 that there were slopes in excess Author:jeffreyb of 20%compared to this one The previous survey showed that there were slopes in File Name: Z-Zoning.743-745Cemetery.2018.9.Roundl.pdf excess of20%compared to this one where there are where there are none.We would ehavealdli"e to nismforete"°what`hedi"eren a Response:The surveysubmitted is p.-de eloeameslopecondrdns.Thiing p like to understand what the pre-development slope conditions.This could be done through an interpolated grade application.Please see accepted. This is no longer an issue. difference is.We have a attached pre-application summary letter. mechanism for determining GRAPHIC SCALE pre-development slope conditions.This could be done through an interpolated grade application. Please see attached pre-application summary letter. Page: EET ID Z-005 Site Coverage Checkmark: Unchecked This sheet can be eliminated. Author:jeffreyb File Name: Z-Zoning.743-745Cemetery.2018.9.Round1.pdf This sheet cen be eliminated. The sheet is eliminated. Page: SHEET IDZ-2005 SHEET TITLEHFIfiHT OVFR TOI 745 Checkmark: Unchecked Author:jeffreyb 745 File Name: Z-Zoning.743-745Cemetery.2018.9.Round1.pdf Response: The note has been corrected to read 745. ;RAPHY � EIGHT ?I'' 7 AMA. IIVE OEPOGRAPIIY MOST RESTRICTIVE -5114' 11=MMICIEMa -6311G EMICEEM®' Page:Z.-UUOREVISED ROUND 1 VAREA CALCS. This table looks different from Checkmark: Unchecked TOTAL PAR 8111114,11. "" Author:jeffreyb what is on Z 002 .. File Name: Z-Zoning.743-745Cemetery.2018.9.Roundl.pdf .PECK AREA E..,._... o M Response:the table on Z-002 has been corrected to reflect the Deck Area Ml w_ �r Calculations that are on the Floor area sheets. -- RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Page:Z.-UUZREVISED ROUND 1 SUMMARY Checkmark: Unchecked 1,299+146=1,445+1,445=2,890 NET LOT AREA Author:jeffreyb File Name: Z-Zoning.743-745Cemetery.2018.9.Roundl.pdf jfilpummagawiggampamal STECOVERAGEo Response: Thie existing square footage has been corrected as noted above. ALLOWABLE FLOOR AREAS FOR THE LUPIL DEVELOPMENT �� n nmp �wRa.. PROPOSED FLOOR AREAS 0FF DUPIES DOLL 00MEM RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT