HomeMy WebLinkAboutFile Documents.743 Cemetery Ln.0011.2018 (4).ARBK 0011 &0012-2018-ARBK_BuildingComment2
00. 0011&0012.2018_BuildingCommentResponsesl.pdf(5)
Subject: PlanCheck
Page Label: 1 Still missing contractor signature
Author:justinh on the special inspection
File Name: 00. agreement, please resubmit that
signature.
0011&0012.2018_BuildingCommentResponsesl.pdf
Subject: PlanCheck
Page Label: 10 This comment has not been
Author:justinh adequately addressed,there are
File Name: 00. multiple intake and exhaust
"..:" M F 0011&0012.2018_BuildingCommentResponsesl.pdf louvers not being shown on the
elevations and sections(some
would only be shown on the
fh!oLt sections as they face towards
the adjacent unit on the garage
1 wall). Comment still stands,
please revise.
Subject: PlanCheck
`r=. Page Label: 10 The cutsheets provided with the
Author:justinh responses do not match what is
:,:;-, called out on your plans(plans
1 ==___ File Name: 00.
0011&0012.2018_BuildingCommentResponsesl.pdf call out two different Hot Springs
brand spa models,you provided
myzjE specs on Sundance spas). The
Fr7F.. cutsheet provided on the cover
does not state that this it is listed
to ASTM F-1346(the safety
cover standard required for all
pool and spa covers). This
comment still stands, provide
documentation for the spas that
show CEC certification and
documentation on the safety
covers that shows ASTM
F-1346.
a71E Subject: PlanCheck
vim.
This stone wall was not removed
—__. Page Label: 11
from the landscape plan,
`-`°` Author:justinh
a . 4 - File Name: 00. previous comment still stands
coordinate all plan sets to show
W E"., -- 0011&0012.2018—BuildingCommentResponsesl.pdf
" it either as proposed or removed
consistently, and if it is to remain
detail it in either the landscape
, �rym set or architectural set.
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT
�.-,v°--- -. Subject: PlanCheck
Page Label: 13 Are you saying that 2 bath fans
J' b° -- • -°" Author:justinh and a clothes dryer needs to be
"�:; File Name: 00. on for this ventilation to be
" "p 0011&0012.2018_BuildingCommentResponsesl.pdf balanced? If so, we will not
_ e accept that unless they were
Drawings have been updated to indicate bathroom exhaust fans will interlocked to automatically turn
"'m'"""' operate continuously.The previous Exhaust fan was replaced with on when the supply ventilation
�p:ws^.,M Broan model#ZB110M.This new fan has the capability to run�°°°°'°°'°� turns on for 1 hour every4(I do
_,,,„,A "°�""°' continuously.See provided cutsheet for additional information.745
.—. a,A°"'.�°o ° unit is balanced within 20%&743 unit is balanced within 20%.See not believe that is actually what
provided ventilation balance calculation sheets for details. is being proposed). Please
clarify or propose a balanced
ventilation system that balances
the homes supply and exhaust
automatically. We do not take
into account air infiltration,the
system needs to mechanically
balance supply and exhaust to
within 20%of each other by
itself. It may be helpful to have
your mechanical engineer call
me directly prior to resubmitting
to be sure that we are all on the
same page.
17.1 743 Mechanical Ventilation Calculation Equipment.743-745Cemetery2018.01 Round 1.pdf(1)
Subject: PlanCheck ✓
Page Label: 1 743 has 5 bedrooms, and I don't
°" ,.' ""` Author:justinh understand how you got your
NIMIwN°ems floor areas you are using for
Corrected ventilation calculation excel file.Updated excel files were both units, neither match what isr....1
sent as two separate excel files labeled with unit address. Updated floor shown on the plan sets. Please
areas were taken from the radiant floor service area tables which
include occupied spaces and excludes unoccupied spaces such as the revise/clarify your input on these
garages and mechanical rooms. forms.
A-Architecture.743-745 Cemetery.2018.9.Round 1.pdf(11)
I I Subject: PlanCheck
11 -.- Page Label:A-303 SEC. C-C You have the foundation drain
li ':,E° 2i. 1 1 and radon pipe reversed, please
�I:Io Author:justinh
=1�'.II ��uu� A File Name: A-Architecture.743-745 Cemetery.2018.9.Round revise.
atop` 1.pdf
MEI
Subject: PlanCheck Detail 16 on A501 calls out only
Page Label: A-306 SEC. F-F 1 layer of versashield. Please
Author:justinh revise one or the other for
m"Wmwr File Name: A-Architecture.743-745 Cemetery.2018.9.Round
��: -""°2-12:: 1.pdf consistency and identify whether
„,; e'. you are proposing the DaVinci
�w �""N
' » slate shingles or DaVinci shake
roof shingles on this note as well
as the detail,the ESR your
submitted covers both so I was
unclear which is actually
proposed.
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT
Subject: PlanCheck
This should be 13+10, not 30
Page Label:A-306 SEC. F-F +10. Please revise.
Author:justinh
File Name:A-Architecture.743-745 Cemetery.2018.9.Round
1.pdf
1 tl ti,:t t I
Subject: PlanCheck You still have multiple
Page Label:A-402 743 FIREPLACE•50745 FIREPLACE
1� iir - references to a 12" raised hearth
Pi: Author:justinh
extension in these details, revise
� �1— File Name: A-Architecture.743-745 Cemetery.2018.9.Round
III i N fii 1.pdf for consistency and clarity.
I
mar, li
,--- in.... _
Subject: PlanCheck
Page Label: CVR Cover Sheet State license to demolish is still
,,g ,E„,� ==o� ""' n Author:justinh required before the building
File Name: A-Architecture.743-745 Cemetery.2018.9.Round department can fully approve
1.pdf your permit.
Subject: PlanCheck A few sheets appear out of
�51 nl; Page Label: CVR Cover Sheet
it a°oi 6u E Author:justinh order, there is a zoning sheet
m<KNmmv - .. File Name: A-Architecture.743-745 Cemetery.2018.9.Round that does not belong in this set
1.pdf
(Z202 was included instead of
..a, .•a.o.. e.���w .a�oUka... ,.W . A202), and the radon plan is
duplicated. Please carefully go
MI
through this set to be sure pages
FE are ordered correctly and that
information is not being
duplicated when you resubmit
for round 2.
r m °— I Subject: PlanCheck
-FSEE
.-- Page Label: I %I T ID A-501 This handrail detail was not
'... response ondicated a` Author justinh revised as the response
mawrof
File Name: A-Architecture.743-745 Cemetery.2018.9.Round endeadsm
indicated and still exceeds the
Mends,misereme
1.pdf maximum perimeter of 6.25"per
R311.7.8.3. Previous comment
a} still stands, please revise.
off ,AL. CD
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT
Subject: PlanCheck
Page Label: I %I T ID A-501 The R10 foam (which I assume
Author:justinh is meant to be rigid insulation)
IB
.:,- a ti=°:um4;y, does not meet the R15
File Name:A-Architecture.743-745 Cemetery.2018.9.Round
1.pdf requirement and is not
consistent with your other
c
s,;_= , + details. Please revise to be 3"
— rigid insulation to meet the IECC
requirement and to be consistent
k Ak _ with your other details. Please
' identify thickness of the slab,
decking above the LVL joist
assembly, membrane etc so that
the patio/basement ceiling
assembly is fully detailed.
Several items are not called out
in this assembly.
Subject: PlanCheck
Page Label: I %I T ID A-501 Call out the specific R values of
Author:justinh your proposed insulation in all
°° w w.,o.-�a • :"_=-�.� File Name:A-Architecture.743-745 Cemetery.2018.9.Round your details, this previous
47 _- _= 1.pdf comment still stands there are
multip
e
aces where it is
-• ,• - , `, = alledlouttlor icons tent ynot
i
z_ l ; identified. Basement walls
Ai '.:6:',,,'
n „ require R15 continuous
. s insulation on either the interior or
exterior of the wall or R19 cavity
insulation on the interior.The
interior rigid insulation would not
be continuous as it is interupted
by the 2x furring.
a- ,jj Subject: PlanCheck
- - Page Label: I %I T ID A-501 These notes are not correct,
Author:justinh R317.1 requires all framing
members, siding and sheathing
File Name: A-Architecture.743-745 Cemetery.2018.9.Round within 6"of finished grade to be
1.pdf
__--_ treated wood (this is why the
foundation would otherwise be
N- required to extend 6"minimum
°` ` _ above grade normally). Revise
=~ °°° ° ° all your notes pertaining to this.
This would effectively be
requiring the entire first floor
exterior wall framing to be
treated wood, I just want to be
sure that you are clear on the
implications of this requirement.
AN i z . ,A. A. _ Subject: PlanCheck
Page Label: I %I T ID A-501 Adding all 4 air sealing detail
0� I , P- a Author:justinh sheets is confusing for your
• ,�= = File Name: A-Architecture.743-745 Cemetery.2018.9.Round builder as well as excessive.
n 1.pdf Please identify which method
�_
- �, you are proposing to use and I
will attach that one sheet and
remove the rest. I believe that it
was exterior sheathing per our
discussion back in September,
but I wanted to verify this.
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT