Loading...
HomeMy WebLinkAboutFile Documents.743 Cemetery Ln.0011.2018 (4).ARBK 0011 &0012-2018-ARBK_BuildingComment2 00. 0011&0012.2018_BuildingCommentResponsesl.pdf(5) Subject: PlanCheck Page Label: 1 Still missing contractor signature Author:justinh on the special inspection File Name: 00. agreement, please resubmit that signature. 0011&0012.2018_BuildingCommentResponsesl.pdf Subject: PlanCheck Page Label: 10 This comment has not been Author:justinh adequately addressed,there are File Name: 00. multiple intake and exhaust "..:" M F 0011&0012.2018_BuildingCommentResponsesl.pdf louvers not being shown on the elevations and sections(some would only be shown on the fh!oLt sections as they face towards the adjacent unit on the garage 1 wall). Comment still stands, please revise. Subject: PlanCheck `r=. Page Label: 10 The cutsheets provided with the Author:justinh responses do not match what is :,:;-, called out on your plans(plans 1 ==___ File Name: 00. 0011&0012.2018_BuildingCommentResponsesl.pdf call out two different Hot Springs brand spa models,you provided myzjE specs on Sundance spas). The Fr7F.. cutsheet provided on the cover does not state that this it is listed to ASTM F-1346(the safety cover standard required for all pool and spa covers). This comment still stands, provide documentation for the spas that show CEC certification and documentation on the safety covers that shows ASTM F-1346. a71E Subject: PlanCheck vim. This stone wall was not removed —__. Page Label: 11 from the landscape plan, `-`°` Author:justinh a . 4 - File Name: 00. previous comment still stands coordinate all plan sets to show W E"., -- 0011&0012.2018—BuildingCommentResponsesl.pdf " it either as proposed or removed consistently, and if it is to remain detail it in either the landscape , �rym set or architectural set. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT �.-,v°--- -. Subject: PlanCheck Page Label: 13 Are you saying that 2 bath fans J' b° -- • -°" Author:justinh and a clothes dryer needs to be "�:; File Name: 00. on for this ventilation to be " "p 0011&0012.2018_BuildingCommentResponsesl.pdf balanced? If so, we will not _ e accept that unless they were Drawings have been updated to indicate bathroom exhaust fans will interlocked to automatically turn "'m'"""' operate continuously.The previous Exhaust fan was replaced with on when the supply ventilation �p:ws^.,M Broan model#ZB110M.This new fan has the capability to run�°°°°'°°'°� turns on for 1 hour every4(I do _,,,„,A "°�""°' continuously.See provided cutsheet for additional information.745 .—. a,A°"'.�°o ° unit is balanced within 20%&743 unit is balanced within 20%.See not believe that is actually what provided ventilation balance calculation sheets for details. is being proposed). Please clarify or propose a balanced ventilation system that balances the homes supply and exhaust automatically. We do not take into account air infiltration,the system needs to mechanically balance supply and exhaust to within 20%of each other by itself. It may be helpful to have your mechanical engineer call me directly prior to resubmitting to be sure that we are all on the same page. 17.1 743 Mechanical Ventilation Calculation Equipment.743-745Cemetery2018.01 Round 1.pdf(1) Subject: PlanCheck ✓ Page Label: 1 743 has 5 bedrooms, and I don't °" ,.' ""` Author:justinh understand how you got your NIMIwN°ems floor areas you are using for Corrected ventilation calculation excel file.Updated excel files were both units, neither match what isr....1 sent as two separate excel files labeled with unit address. Updated floor shown on the plan sets. Please areas were taken from the radiant floor service area tables which include occupied spaces and excludes unoccupied spaces such as the revise/clarify your input on these garages and mechanical rooms. forms. A-Architecture.743-745 Cemetery.2018.9.Round 1.pdf(11) I I Subject: PlanCheck 11 -.- Page Label:A-303 SEC. C-C You have the foundation drain li ':,E° 2i. 1 1 and radon pipe reversed, please �I:Io Author:justinh =1�'.II ��uu� A File Name: A-Architecture.743-745 Cemetery.2018.9.Round revise. atop` 1.pdf MEI Subject: PlanCheck Detail 16 on A501 calls out only Page Label: A-306 SEC. F-F 1 layer of versashield. Please Author:justinh revise one or the other for m"Wmwr File Name: A-Architecture.743-745 Cemetery.2018.9.Round ��: -""°2-12:: 1.pdf consistency and identify whether „,; e'. you are proposing the DaVinci �w �""N ' » slate shingles or DaVinci shake roof shingles on this note as well as the detail,the ESR your submitted covers both so I was unclear which is actually proposed. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Subject: PlanCheck This should be 13+10, not 30 Page Label:A-306 SEC. F-F +10. Please revise. Author:justinh File Name:A-Architecture.743-745 Cemetery.2018.9.Round 1.pdf 1 tl ti,:t t I Subject: PlanCheck You still have multiple Page Label:A-402 743 FIREPLACE•50745 FIREPLACE 1� iir - references to a 12" raised hearth Pi: Author:justinh extension in these details, revise � �1— File Name: A-Architecture.743-745 Cemetery.2018.9.Round III i N fii 1.pdf for consistency and clarity. I mar, li ,--- in.... _ Subject: PlanCheck Page Label: CVR Cover Sheet State license to demolish is still ,,g ,E„,� ==o� ""' n Author:justinh required before the building File Name: A-Architecture.743-745 Cemetery.2018.9.Round department can fully approve 1.pdf your permit. Subject: PlanCheck A few sheets appear out of �51 nl; Page Label: CVR Cover Sheet it a°oi 6u E Author:justinh order, there is a zoning sheet m<KNmmv - .. File Name: A-Architecture.743-745 Cemetery.2018.9.Round that does not belong in this set 1.pdf (Z202 was included instead of ..a, .•a.o.. e.���w .a�oUka... ,.W . A202), and the radon plan is duplicated. Please carefully go MI through this set to be sure pages FE are ordered correctly and that information is not being duplicated when you resubmit for round 2. r m °— I Subject: PlanCheck -FSEE .-- Page Label: I %I T ID A-501 This handrail detail was not '... response ondicated a` Author justinh revised as the response mawrof File Name: A-Architecture.743-745 Cemetery.2018.9.Round endeadsm indicated and still exceeds the Mends,misereme 1.pdf maximum perimeter of 6.25"per R311.7.8.3. Previous comment a} still stands, please revise. off ,AL. CD RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Subject: PlanCheck Page Label: I %I T ID A-501 The R10 foam (which I assume Author:justinh is meant to be rigid insulation) IB .:,- a ti=°:um4;y, does not meet the R15 File Name:A-Architecture.743-745 Cemetery.2018.9.Round 1.pdf requirement and is not consistent with your other c s,;_= , + details. Please revise to be 3" — rigid insulation to meet the IECC requirement and to be consistent k Ak _ with your other details. Please ' identify thickness of the slab, decking above the LVL joist assembly, membrane etc so that the patio/basement ceiling assembly is fully detailed. Several items are not called out in this assembly. Subject: PlanCheck Page Label: I %I T ID A-501 Call out the specific R values of Author:justinh your proposed insulation in all °° w w.,o.-�a • :"_=-�.� File Name:A-Architecture.743-745 Cemetery.2018.9.Round your details, this previous 47 _- _= 1.pdf comment still stands there are multip e aces where it is -• ,• - , `, = alledlouttlor icons tent ynot i z_ l ; identified. Basement walls Ai '.:6:',,,' n „ require R15 continuous . s insulation on either the interior or exterior of the wall or R19 cavity insulation on the interior.The interior rigid insulation would not be continuous as it is interupted by the 2x furring. a- ,jj Subject: PlanCheck - - Page Label: I %I T ID A-501 These notes are not correct, Author:justinh R317.1 requires all framing members, siding and sheathing File Name: A-Architecture.743-745 Cemetery.2018.9.Round within 6"of finished grade to be 1.pdf __--_ treated wood (this is why the foundation would otherwise be N- required to extend 6"minimum °` ` _ above grade normally). Revise =~ °°° ° ° all your notes pertaining to this. This would effectively be requiring the entire first floor exterior wall framing to be treated wood, I just want to be sure that you are clear on the implications of this requirement. AN i z . ,A. A. _ Subject: PlanCheck Page Label: I %I T ID A-501 Adding all 4 air sealing detail 0� I , P- a Author:justinh sheets is confusing for your • ,�= = File Name: A-Architecture.743-745 Cemetery.2018.9.Round builder as well as excessive. n 1.pdf Please identify which method �_ - �, you are proposing to use and I will attach that one sheet and remove the rest. I believe that it was exterior sheathing per our discussion back in September, but I wanted to verify this. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT