HomeMy WebLinkAboutFile Documents.743 Cemetery Ln.0011.2018 (5).ARBK 0011 &0012-2018-ARBK_BuildingComment2
00. 0011&0012.2018_BuildingCommentResponsesl.pdf(5)
,; � Subject: PlanCheck
°'°�°°°' ✓
:• ° �p'L °° °t' Page Label: 1 Still missing contractor signature
Author:justinh on the special inspection
File Name: 00. agreement, please resubmit that
0011&0012.2018 BuildingCommentResponsesl.pdf signature.
Response Round 2:Attached please find the contractor signature page.
Subject: PlanCheck
Page Label: 10 This comment has not been
Author:justinh adequately addressed,there are
File Name: 00. multiple intake and exhaust
"'Z.' M F 0011&0012.2018_BuildingCommentResponsesl.pdf louvers not being shown on the
elevations and sections(some
- Response: The 8 exterior louvers have been added to the would only be shown on the
Ft!I ILI ~ID �" Bldg. Sections and Elevations. Contractor to coordinate sections as they face towards
exact location in the field. the adjacent unit on the garage
-� E ---�-- wall). Comment still stands,
please revise.
Subject: PlanCheck x
`r=. Page Label: 10 The cutsheets provided with the
Author:justinh responses do not match what is
I ; �••. =,a. called out on your plans(plans
File Name: 00.
Powna. � mu, 0011&0012.2018_BuildingCommentResponsesl.pdf call out two different Hot Springs
brand spa models,you provided
. ..? specs on Sundance spas). The
,uP 1:1„ Response: The Hot Tub Spa for 743 and 745 is Sundance cutsheet provided on the cover
Victoria=53 Sq.Ft. does not state that this it is listed
The spa cover will be produced by"Beyond Nice". Beyond to ASTM F-1346(the safety
Nice Spa covers has a listed ASTM F-1346 compliance,as cover standard required for all
stated on the literature attached here. pool and spa covers). This
comment still stands, provide
documentation for the spas that
show CEC certification and
documentation on the safety
covers that shows ASTM
F-1346.
Subject: PlanCheck X
This stone wall was not removed
—__. Page Label: 11
from the landscape plan,
' `-`tl"°` EZ° Author:justinh
File Name: 00. previous comment still stands
coordinate all plan sets to show
"
,=== 1/1 rf 0011&0012.2018—BuildingCommentResponsesl.pdf
it either as proposed or removed
consistently, and if it is to remain
detail it in either the landscape
rym Response Round 2: The stone wall was removed from set or architectural set.
the Landscape Plan in Round 1.The landscape plans
are attached.
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT
; •_ -�v°_ _�,°N°• -. Subject: PlanCheck ✓
i.
Page Label: 13 Are you saying that 2 bath fans
J` fi° -- • -°" Author:justinh and a clothes dryer needs to be
File Name: 00. on for this ventilation to be
" "p 0011&0012.2018_BuildingCommentResponsesl.pdf balanced? If so, we will not
=o°p� .,,, accept that unless they were
am. ,
interlocked to automatically turn
Response: See Mechanical Plans and responses attached. on when the supply ventilation
turns on for 1 hour every 4(I do
• -. ,A°�.-o not believe that is actually what
is being proposed). Please
clarify or propose a balanced
ventilation system that balances
the homes supply and exhaust
automatically. We do not take
into account air infiltration,the
system needs to mechanically
balance supply and exhaust to
within 20%of each other by
itself. It may be helpful to have
your mechanical engineer call
me directly prior to resubmitting
to be sure that we are all on the
same page.
17.1 743 Mechanical Ventilation Calculation Equipment.743-745Cemetery2018.01 Round 1.pdf(1)
Subject: PlanCheck ✓ 743 has 5 bedrooms, and I don't
Page Label: 1
_._ Author:justinh understand how you got your
__ _ _ File Name: 17.1 743 Mechanical Ventilation Calculation floor areas you are using for
- Equipment.743-745Cemetery2018.01 Round 1.pdf both units, neither match what is
m shown on the plan sets. Please
Response: See Mechanical Plans and responses attached. revise/clarify your input on these
forms.
A-Architecture.743-745 Cemetery.2018.9.Round 1.pdf(11)
I I Subject: PlanCheck ✓
ii M°m Page Label:A-303 SEC. C-C You have the foundation drain
ii a°aroa� . I I and radon pipe reversed, please
�I o.. Author:justinh
�II{• a °u,� File Name: A Architecture.743 745 Cemetery.2018.9.Round revise.
1.pdf
Mil Response:This note has been corrected.
Subject: PlanCheck ✓
Page Label: A-306 SEC. F-F Detail 16 on A501 calls out only
Author:justinh 1 layer of versashield. Please
File Name: A-Architecture.743-745 Cemetery.2018.9.Round revise one or the other for
1.pdf consistency and identify whether
you are proposing the DaVinci
K _,�.,.a.".,.�. shingles DaVinci
\I"
Response: The proposed roof material is Asphalt Shingles slateroo shingles orn this note shakes well
and the notes have been corrected on all Sections and as the detail,the ESR your
— — Building elevations to note ans Asphalt roof. submitted covers both so I was
unclear which is actually
proposed.
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT
Subject: PlanCheck ✓
This should be 13+10, not 30
Page Label:A-306 SEC. F-F +10. Please revise.
Author:justinh
File Name:A-Architecture.743-745 Cemetery.2018.9.Round
1.pdf
.77:-. ° l."I Response: This note has been corrected.
1 t/ ti-,,t t
Subject: PlanCheck, You still have multiple
Page Label:A-402 743 FIREPLACE•50745 FIREPLACE
iir "' references to a 12" raised hearth
:V Author:justinh
11111111111
I iii ,= — I File Name: A Architecture.743 745 Cemeter 2018.9.Round extension in these details, revise
=I N I lip 1.pdf y for consistency and clarity.
ear
tangy Response:The notes and drawings have been corrected.
,—.,.— Ism
Subject: PlanCheck 1r
Page Label: CVR Cover Sheet State license to demolish is still
g,,ra «o� '"' n Author:justinh required before the building
File Name: A-Architecture.743-745 Cemetery.2018.9.Round department can fully approve
1.pdf your permit.
' Response: See attached Demolition approvals.
Subject: PlanCheck X A few sheets appear out of
r15 t of of Page Label: CVR Cover Sheet
pslka°o« °o u° E Author:justinh order, there is a zoning sheet
N<KN^nCE RM '" .. File Name: A-Architecture.743-745 Cemetery.2018.9.Round that does not belong in this set
1.pdf (Z202 was included instead of
R.�E5E .•a�.o..�e..a�oUka.�.. ,•W A202), and the radon plan is
Response: The sheets have been reviewed and duplicated. Please carefully go
MI
corrected. through this set to be sure pages
FE are ordered correctly and that
information is not being
duplicated when you resubmit
for round 2.
g=m °'' Subject: PlanCheck ✓
5 Page Label: I %I T ID A-501 This handrail detail was not
w 8 a`'I'' Author:justinhend stIll exceeds Ole revised as the response
File Name: A-Architecture.743-745 Cemetery.2018.9.Round indicated and still exceeds the
as.a amen sa° maximum perimeter of 6.25"per
�.. 1.pdf
1 R311.7.8.3. Previous comment
Pog still stands, please revise.
Response: The detail has been revised.
OH12,1,AL O aYa R9.
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT
Subject: PlanCheck x
Page Label: I %I T ID A-501 The R10 foam (which I assume
Author:justinh is meant to be rigid insulation)
File Name:A-Architecture.743-745 Cemetery.2018.9.Round
=m "........, does not meet the R15
1.pdf requirement and is not
consistent with your other
�, ,�+ details. Please revise to be 3"
- Response: The details have been revised.
rigid insulation to meet the IECC
" requirement and to be consistent
k, with your other details. Please
identify thickness of the slab,
decking above the LVL joist
assembly, membrane etc so that
the patio/basement ceiling
assembly is fully detailed.
Several items are not called out
in this assembly.
Subject: PlanCheck it
Page Label: I %I T ID A-501 Call out the specific R values of
Author:justinh your proposed insulation in all
"" File Name:A-Architecture.743-745 Cemetery.2018.9.Round your details, this previous
=- 1.pdf comment still stands there are
places where it is
�� %I Response:The details have been revised to call out called t or inconsistently not
... identified. Basement walls
the insulation values.
6- p..• f�, _7 require R15 continuous
__x -- insulation on either the interior or
D. —,m exterior of the wall or R19 cavity
insulation on the interior.The
interior rigid insulation would not
be continuous as it is interupted
by the 2x furring.
Subject: PlanCheck X
°. _ Page Label: I %I T ID A-501 These notes are not correct,
14 -_ Author:justinh R317.1 requires all framing
File Name: A-Architecture.743-745 Cemetery.2018.9.Round
!� members, siding and sheathing
1.pdf within 6"of finished grade to be
. r treated
Response: The details have been revised to show foundation would otherwise be
treated wood within form 6"above rade. Notes have reqreat
above grade normally). Revise uiredwood to extend(this 6is"why minimumthe
= g
been added to S 1 to reinforce the Code R317.1 regarding all your notes pertaining to this.
siding and sheathing within 6"of grade to be treated wood. This would effectively be
requiring the entire first floor
exterior wall framing to be
treated wood, I just want to be
sure that you are clear on the
implications of this requirement.
gl k _liS. . i Subject: PlanCheck ✓
Page Label: I %I T ID A-501 Adding all 4 air sealing detail
0� •
i , ii a Author:justinh sheets is confusing for your
• ,t a• � = File Name: A-Architecture.743-745 Cemetery.2018.9.Round builder as well as excessive.
`n, 1.pdf Please identify which method
you are proposing to use and
will attach that one sheet and
Response: These detail guides sheets represent many remove the rest. I believe that it
conditions that occur on the buildings. I spoke with the was exterior sheathing per our
contractor(again on this job)and he agreed that the guide is discussion back in September,
valuable for reference. the sheets will be maintained in the but I wanted to verify this.
construction documents.
RECEIVED
02/07/2019
ASPEN
BUILDING DEPARTMENT