Loading...
HomeMy WebLinkAboutFile Documents.743 Cemetery Ln.0011.2018 (5).ARBK 0011 &0012-2018-ARBK_BuildingComment2 00. 0011&0012.2018_BuildingCommentResponsesl.pdf(5) ,; � Subject: PlanCheck °'°�°°°' ✓ :• ° �p'L °° °t' Page Label: 1 Still missing contractor signature Author:justinh on the special inspection File Name: 00. agreement, please resubmit that 0011&0012.2018 BuildingCommentResponsesl.pdf signature. Response Round 2:Attached please find the contractor signature page. Subject: PlanCheck Page Label: 10 This comment has not been Author:justinh adequately addressed,there are File Name: 00. multiple intake and exhaust "'Z.' M F 0011&0012.2018_BuildingCommentResponsesl.pdf louvers not being shown on the elevations and sections(some - Response: The 8 exterior louvers have been added to the would only be shown on the Ft!I ILI ~ID �" Bldg. Sections and Elevations. Contractor to coordinate sections as they face towards exact location in the field. the adjacent unit on the garage -� E ---�-- wall). Comment still stands, please revise. Subject: PlanCheck x `r=. Page Label: 10 The cutsheets provided with the Author:justinh responses do not match what is I ; �••. =,a. called out on your plans(plans File Name: 00. Powna. � mu, 0011&0012.2018_BuildingCommentResponsesl.pdf call out two different Hot Springs brand spa models,you provided . ..? specs on Sundance spas). The ,uP 1:1„ Response: The Hot Tub Spa for 743 and 745 is Sundance cutsheet provided on the cover Victoria=53 Sq.Ft. does not state that this it is listed The spa cover will be produced by"Beyond Nice". Beyond to ASTM F-1346(the safety Nice Spa covers has a listed ASTM F-1346 compliance,as cover standard required for all stated on the literature attached here. pool and spa covers). This comment still stands, provide documentation for the spas that show CEC certification and documentation on the safety covers that shows ASTM F-1346. Subject: PlanCheck X This stone wall was not removed —__. Page Label: 11 from the landscape plan, ' `-`tl"°` EZ° Author:justinh File Name: 00. previous comment still stands coordinate all plan sets to show " ,=== 1/1 rf 0011&0012.2018—BuildingCommentResponsesl.pdf it either as proposed or removed consistently, and if it is to remain detail it in either the landscape rym Response Round 2: The stone wall was removed from set or architectural set. the Landscape Plan in Round 1.The landscape plans are attached. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT ; •_ -�v°_ _�,°N°• -. Subject: PlanCheck ✓ i. Page Label: 13 Are you saying that 2 bath fans J` fi° -- • -°" Author:justinh and a clothes dryer needs to be File Name: 00. on for this ventilation to be " "p 0011&0012.2018_BuildingCommentResponsesl.pdf balanced? If so, we will not =o°p� .,,, accept that unless they were am. , interlocked to automatically turn Response: See Mechanical Plans and responses attached. on when the supply ventilation turns on for 1 hour every 4(I do • -. ,A°�.-o not believe that is actually what is being proposed). Please clarify or propose a balanced ventilation system that balances the homes supply and exhaust automatically. We do not take into account air infiltration,the system needs to mechanically balance supply and exhaust to within 20%of each other by itself. It may be helpful to have your mechanical engineer call me directly prior to resubmitting to be sure that we are all on the same page. 17.1 743 Mechanical Ventilation Calculation Equipment.743-745Cemetery2018.01 Round 1.pdf(1) Subject: PlanCheck ✓ 743 has 5 bedrooms, and I don't Page Label: 1 _._ Author:justinh understand how you got your __ _ _ File Name: 17.1 743 Mechanical Ventilation Calculation floor areas you are using for - Equipment.743-745Cemetery2018.01 Round 1.pdf both units, neither match what is m shown on the plan sets. Please Response: See Mechanical Plans and responses attached. revise/clarify your input on these forms. A-Architecture.743-745 Cemetery.2018.9.Round 1.pdf(11) I I Subject: PlanCheck ✓ ii M°m Page Label:A-303 SEC. C-C You have the foundation drain ii a°aroa� . I I and radon pipe reversed, please �I o.. Author:justinh �II{• a °u,� File Name: A Architecture.743 745 Cemetery.2018.9.Round revise. 1.pdf Mil Response:This note has been corrected. Subject: PlanCheck ✓ Page Label: A-306 SEC. F-F Detail 16 on A501 calls out only Author:justinh 1 layer of versashield. Please File Name: A-Architecture.743-745 Cemetery.2018.9.Round revise one or the other for 1.pdf consistency and identify whether you are proposing the DaVinci K _,�.,.a.".,.�. shingles DaVinci \I" Response: The proposed roof material is Asphalt Shingles slateroo shingles orn this note shakes well and the notes have been corrected on all Sections and as the detail,the ESR your — — Building elevations to note ans Asphalt roof. submitted covers both so I was unclear which is actually proposed. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Subject: PlanCheck ✓ This should be 13+10, not 30 Page Label:A-306 SEC. F-F +10. Please revise. Author:justinh File Name:A-Architecture.743-745 Cemetery.2018.9.Round 1.pdf .77:-. ° l."I Response: This note has been corrected. 1 t/ ti-,,t t Subject: PlanCheck, You still have multiple Page Label:A-402 743 FIREPLACE•50745 FIREPLACE iir "' references to a 12" raised hearth :V Author:justinh 11111111111 I iii ,= — I File Name: A Architecture.743 745 Cemeter 2018.9.Round extension in these details, revise =I N I lip 1.pdf y for consistency and clarity. ear tangy Response:The notes and drawings have been corrected. ,—.,.— Ism Subject: PlanCheck 1r Page Label: CVR Cover Sheet State license to demolish is still g,,ra «o� '"' n Author:justinh required before the building File Name: A-Architecture.743-745 Cemetery.2018.9.Round department can fully approve 1.pdf your permit. ' Response: See attached Demolition approvals. Subject: PlanCheck X A few sheets appear out of r15 t of of Page Label: CVR Cover Sheet pslka°o« °o u° E Author:justinh order, there is a zoning sheet N<KN^nCE RM '" .. File Name: A-Architecture.743-745 Cemetery.2018.9.Round that does not belong in this set 1.pdf (Z202 was included instead of R.�E5E .•a�.o..�e..a�oUka.�.. ,•W A202), and the radon plan is Response: The sheets have been reviewed and duplicated. Please carefully go MI corrected. through this set to be sure pages FE are ordered correctly and that information is not being duplicated when you resubmit for round 2. g=m °'' Subject: PlanCheck ✓ 5 Page Label: I %I T ID A-501 This handrail detail was not w 8 a`'I'' Author:justinhend stIll exceeds Ole revised as the response File Name: A-Architecture.743-745 Cemetery.2018.9.Round indicated and still exceeds the as.a amen sa° maximum perimeter of 6.25"per �.. 1.pdf 1 R311.7.8.3. Previous comment Pog still stands, please revise. Response: The detail has been revised. OH12,1,AL O aYa R9. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Subject: PlanCheck x Page Label: I %I T ID A-501 The R10 foam (which I assume Author:justinh is meant to be rigid insulation) File Name:A-Architecture.743-745 Cemetery.2018.9.Round =m "........, does not meet the R15 1.pdf requirement and is not consistent with your other �, ,�+ details. Please revise to be 3" - Response: The details have been revised. rigid insulation to meet the IECC " requirement and to be consistent k, with your other details. Please identify thickness of the slab, decking above the LVL joist assembly, membrane etc so that the patio/basement ceiling assembly is fully detailed. Several items are not called out in this assembly. Subject: PlanCheck it Page Label: I %I T ID A-501 Call out the specific R values of Author:justinh your proposed insulation in all "" File Name:A-Architecture.743-745 Cemetery.2018.9.Round your details, this previous =- 1.pdf comment still stands there are places where it is �� %I Response:The details have been revised to call out called t or inconsistently not ... identified. Basement walls the insulation values. 6- p..• f�, _7 require R15 continuous __x -- insulation on either the interior or D. —,m exterior of the wall or R19 cavity insulation on the interior.The interior rigid insulation would not be continuous as it is interupted by the 2x furring. Subject: PlanCheck X °. _ Page Label: I %I T ID A-501 These notes are not correct, 14 -_ Author:justinh R317.1 requires all framing File Name: A-Architecture.743-745 Cemetery.2018.9.Round !� members, siding and sheathing 1.pdf within 6"of finished grade to be . r treated Response: The details have been revised to show foundation would otherwise be treated wood within form 6"above rade. Notes have reqreat above grade normally). Revise uiredwood to extend(this 6is"why minimumthe = g been added to S 1 to reinforce the Code R317.1 regarding all your notes pertaining to this. siding and sheathing within 6"of grade to be treated wood. This would effectively be requiring the entire first floor exterior wall framing to be treated wood, I just want to be sure that you are clear on the implications of this requirement. gl k _liS. . i Subject: PlanCheck ✓ Page Label: I %I T ID A-501 Adding all 4 air sealing detail 0� • i , ii a Author:justinh sheets is confusing for your • ,t a• � = File Name: A-Architecture.743-745 Cemetery.2018.9.Round builder as well as excessive. `n, 1.pdf Please identify which method you are proposing to use and will attach that one sheet and Response: These detail guides sheets represent many remove the rest. I believe that it conditions that occur on the buildings. I spoke with the was exterior sheathing per our contractor(again on this job)and he agreed that the guide is discussion back in September, valuable for reference. the sheets will be maintained in the but I wanted to verify this. construction documents. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT