Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.743 Cemetery Ln.0011.2018 (6).ARBK
Markup Summary 11 -19-2018 C-CemeteryLnCivilPlans-1 0-08-1 8.pdf(4) ,1� `°©" � O, ,.A°_,.. d Z Page: 1 a a Author: mikeh How are these elevations 1' ti/ m! F47, '. F a i Date: 11/19/2018 12:58:37 PM calculated'?Were valves " ° �� v dipped? Need evidence that 18" �f \_„.\_ _ 5 3 File Name: C-CemeteryLnCivilPlans-10-08-18.pdf , ; M a 5 of separation is possible. Profile �i r C. may provide clarity on '',��' P"gip" '`tt w' °��, separation and conflicts. r � .\� °" .�m�m N. a, Depth was estimated as 7' per email correspondence from Mr. Keith Wester with Aspen ������� m©��0 c Water. The drawings specify 18" of separation and require potholing to verify nEmr- t,1\\ u,zza I f6; /r, elevations prior to construction. A note has been added to sheet Cl that the sewer laterals should be raised to provide 18" of separation if necessary. Page: 2 1 Author: mikeh A flared end section is not a Date: 11/13/2018 8:53:54 AM sufficient spreading mechanism. -- ��'�" The site historically drained 17rRI*6'1:" '° - File Name: C-CemeteryLnCivilPlans-10-08-18.pdf zEzT m ""d�,, 1 across the entire frontage of the ,� ,n° o M�moe° aa` `"a�'em' VA-4fproperty.A more effective <oo ' <„TLv,a„„�_ spreading mechanism is ` 'lid a qrequired. Please adjust plans. ^ �*O The flared end section has been removed and the outlet structure has �','�` W- been modified to pipe discharge be means of a perforated 1'i e in gravel as a mechanism for spreading water. This is shown on C2 and detail on C5. Page:4 Please have detail match the Author: mikeh COA Water Details.This Date: 11/19/2018 12:05:00 PM includes a 20'stick of C900 Please have detail match the COA Water File Name: C-CemeteryLnCivilPlans-10-08-18.pdf Details.This includes a 20'stick of C900 centered above water pipe. centered above water pipe. -1 The detail H has been modified to match the COA water details. The sewer lateral material has been specified as either C900 or DR-18 with one length centered over the water line. Page: 5 Author: mikeh No sand is allowed within Date: 11/13/2018 9:40:07 AM permeable paver section. Please File Name: C-CemeteryLnCivilPlans-10-08-18.pdf adjust fill materials to match No sand is allowed within permeable URMP specifications. paver section.Please adjust fill materials ". to match URMP specifications. The permeable paver detail J has been modified to match URMP specifications. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT