Loading...
HomeMy WebLinkAboutFile Documents.330 Gillespie St.0003.2018 (8).ARBK PERMIT NUMBER: ADDRESS: qS ( 'OCI G V-' COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC BUILDING CODE INFORMATION ■❑ 2015 IRC ❑ 2015 IBC ❑ Other (Please Explain) Code Editions (As Adopted and Amended) (As Adopted and Amended) Fire Sprinkler System I Existing? ITN': I Required? ONeos I Type ❑ NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D Type Of Construction O VA ❑� VB❑ IV ❑ IIIA ❑ IIIB ❑ IIA ❑ IIB ❑ IA ❑ IB I Fire Alarms Installed ❑ Yes❑ No Required Special Inspections ❑ High-Strength Bolting ❑ Epoxy Anchors ❑ Structual Steel Welding n { ❑ Permanent Micropiles ❑ Sprayed Fire-Resistants ❑ Other __ Energy Code Compliance 0 Prescriptive Table ❑ RESCheck UA Alternative ❑ COMCheck UA Alternative Exterior Energy Use Total Approved On-Site Snowmelt° Spa° Pool ° (Existing + New) Building Type/ I ❑ A_ ❑ B ❑ F_ ❑ E ❑ R_ I ❑i One Family ❑ Two Family Occupancy Group g ❑ B (A <50) ❑ H ❑M ❑ S_ R ❑ I ❑ U C ❑ Townhouse UNIT DESCRIPTION AS PROPOSED #Stories Above Grade 2 # Stories Below Grade 1 ADU BUILDING DESCRIPTION Attached Garage Detached Garage Carport Is there an ADU? ❑ Yes Parking Spaces Parking Spaces Parking Spaces ° ❑ No # Living Rooms # Bedrooms 4 # Full Baths 4 Deck Area 154 sf # Kitchens # Full Baths # 3/4 Baths # 1/2 Baths 2 # 3/4 Baths # 1/2 Baths # Kitchens 1 # Wood Fireplaces 1 # Bedrooms #Gas Appliances # Gas Logs # Other Rooms (List) BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement BUNK ROOM, 1/2 BATH,WALK IN CLOSET,MEDIA ROOM, FULL BATH,MECHANICAL AND STORAGE Main Level FAMILY ROOM,LIVING ROOM, 1/2 BATH,DINING,KITCHEN,MUD/LAUNDRY,GARAGE.STORAGE 2nd Floor 3 BEDROOMS,3 FULL BATHROOMS,3 WALK IN CLOSETS,SITTING ROOM 3rd Floor Additional RECEIVE Reviwed By: JH Date: 2/23/18 l 0 9/2 n i 8 ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO Q11) BUILDING