HomeMy WebLinkAboutFile Documents.330 Gillespie St.0003.2018 (8).ARBK PERMIT NUMBER: ADDRESS: qS ( 'OCI G V-'
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
BUILDING CODE INFORMATION
■❑ 2015 IRC ❑ 2015 IBC ❑ Other (Please Explain)
Code Editions (As Adopted and Amended) (As Adopted and Amended)
Fire Sprinkler System I Existing? ITN': I Required? ONeos I Type ❑ NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D
Type Of Construction O VA ❑� VB❑ IV ❑ IIIA ❑ IIIB ❑ IIA ❑ IIB ❑ IA ❑ IB I Fire Alarms Installed ❑ Yes❑ No
Required Special Inspections ❑ High-Strength Bolting ❑ Epoxy Anchors ❑ Structual Steel Welding
n { ❑ Permanent Micropiles ❑ Sprayed Fire-Resistants ❑ Other __
Energy Code Compliance 0 Prescriptive Table
❑ RESCheck UA Alternative ❑ COMCheck UA Alternative
Exterior Energy Use Total Approved On-Site Snowmelt° Spa° Pool °
(Existing + New)
Building Type/ I ❑ A_ ❑ B ❑ F_ ❑ E ❑ R_ I ❑i One Family ❑ Two Family
Occupancy Group g ❑ B (A <50) ❑ H ❑M ❑ S_ R
❑ I ❑ U C ❑ Townhouse
UNIT DESCRIPTION AS PROPOSED
#Stories Above Grade 2 # Stories Below Grade 1 ADU BUILDING DESCRIPTION
Attached Garage Detached Garage Carport Is there an ADU? ❑ Yes
Parking Spaces Parking Spaces Parking Spaces ° ❑ No
# Living Rooms
# Bedrooms 4 # Full Baths 4 Deck Area 154 sf # Kitchens
# Full Baths
# 3/4 Baths # 1/2 Baths 2 # 3/4 Baths
# 1/2 Baths
# Kitchens 1 # Wood Fireplaces 1 # Bedrooms
#Gas Appliances # Gas Logs # Other Rooms (List)
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement BUNK ROOM, 1/2 BATH,WALK IN CLOSET,MEDIA ROOM, FULL BATH,MECHANICAL AND STORAGE
Main Level FAMILY ROOM,LIVING ROOM, 1/2 BATH,DINING,KITCHEN,MUD/LAUNDRY,GARAGE.STORAGE
2nd Floor 3 BEDROOMS,3 FULL BATHROOMS,3 WALK IN CLOSETS,SITTING ROOM
3rd Floor
Additional
RECEIVE
Reviwed By: JH Date: 2/23/18 l 0 9/2 n i 8
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO Q11)
BUILDING