Loading...
HomeMy WebLinkAboutFile Documents.210 S 1st St.0281.2017 (4).ARBK BuildingCommentl 13. REMP Calcuations.210 1 ST.2017.10.pdf(1) �a �a Subject: PlanCheck , Fill out this portion of the form. Page Label: 1 Be sure to replace the copy of Author:justinh 1 ad File Name: 13. REMP Calcuations.210 1 ST.2017.10.pdf the form in the plans with the NM :o; signed version. mili Response:The REMP form has been filled out and signed per the new Snowmelt Calculations. Re-submitted Sheets include:A-002 Snowmelt Diagram and Calcs; REMP Sheet. 15. Line Grade Verification Form.210 South 1st St. 2017.10 - Copy.pdf(1) Subject: PlanCheck✓ Page Label 1 Please clarify where this is m w�..M.>.,>wy,i40.M ... Author:justinh shown on the plans as I am not File Name: 15. Line Grade Verification Form.210 South 1st seeing it shown anywhere. -°'i St. 2017.10-Copy.pdf n, Response: Dimensions tying the building to the Property line was added to sheet A-100 Lower Floor .- Plan. Re-submitted Sheet:A-100 Lower Floor Plan A-Architectural Plans.210 1st..2017.10.pdf(42) oR�WA. OroRAN Subject: PlanCheck ✓ Page Label: BLDG SECTIONS Provide a detail for this wig 1 assembly with compliant R Author:justinh values with the deck and slab CONC SLAB e GARAGE ELL 100-R. I ,--�-�- File Name: A-Architectural Plans.210 1st..2017.10.pdf -. --- — system shown in the structural woe Response:A new Bldg. Section E-E has been added to the plans. TuuP ,="" Plan Set, that showsl 1-7/8"joists hanging below the i structural slab with R-49 Spray Foam insulation. ® i .oFw roP OF FIN La��Lcazz Re-submitted Sheet:A-303 Bldg. Section E-E 0 ® Subject: PlanCheck ✓ Page Label: BLDG SECTIONS Provide a stair detail showing ter. E,z<• compliant riser height,tread , ...gi ,u Author:justinh depth, handrail and guard ""Nrd° °E _ File Name: A-Architectural Plans.210 1st..2017.10.pdf .^.-, a height, handrail size/type. Open 'ad�•d Response: Plans and details for the Exterior Stairs risers where 30"above grade or gagg.gnequre4g°� are shown on a new Sheet A-402 greater are required to limit the ,�FeE�ROE�m�the 11_ Re-submitted Sheet:A-402 Exterior Stair Plans opening to 4"or less. ZaZYLEN a' �.=m Subject: PlanCheck X Page Label: BLDG SECTIONS Provide details for these ceiling �� Author:justinh and wall assemblies that show j•�k compliance with R302.6 forFile Name: A-Architectural Plans.210 1st..2017.10.pdf hmisairi tF .,,,_., garage dwelling separation. �! I �l e_M•• ,$ Response: Notes adding and details are added to the Bldg. Reference these details on all Sections at the Garage walls and elevator. applicable sections as well as :IE'' t F"....7":::41-4. Re-submitted Sheet: Floor Plans:A-100; the floor plan. --- I � I— ' ---'' A-101;A-102;A-103; Building Sections:A-401;A-402 and RECEIVED .. 10/09/18 ASPEN BUILDING DEPARTMENT iI r I.V.rIN rLK CL:IVNI-EI'IJI Ib.IC Subject: PlanCheck 4/F \ Page Label: BLDG SECTIONS This does not meet prescriptive ""°`�°°; Author:justinh R value requirements for a Thisdoesnot Meet File Name:A-Architectural Plans.210 1st..2017.10.pdf basement wall. This note is on prescriptive R value multiple sheets, be sure to revise 7 requirements for a .`7='''' s n sementwal.This Response: The required R-Values have been added all similar notes. to is on multiple reesea°e5 tarn and corrected to all Bldg. Sections. to r I similar cotes. BUILDING SECTION D-D Resubmitted Sheets:All Elevations and all Bldg.sections SCALE: 1/4" = 1'-0" J RADON PIPE a Subject: PlanCheck ✓( _rr Page Label: BLDG SECTIONS You are only required to have a Author:justinh 1 hour exterior wall assembly ` W= File Name: A-Architectural Plans.210 1st..2017.10.pdf where less than 5'to a property re0^y1Bfietle w ou line or assumed property line �\ ''..DATES between a neighboring structure. \ "" q Response:The North and East Wall Only will be a Where the property line is raZiL om adjacent to a road or alley we required 1 HR.wall. the notes have been revised. measure that distance to the -Comment not adequately addressed, you still have multiple and A-403. center line of the road/alley. floor details that are never referenced in you plan set and From what I ere the only locations where a 1 hour wall many of the floor ceiling assemblies in the sections do not would be required is along the have any reference tag. Please revise to consistently identify east side of the building where the assemblies proposed inyour sections. less than potentially from the property p p lineand along the north side of the of the building in areas with less than 10'of separation between buildings. You can certainly propose that more walls be 1 hour, but it is n. a egoire e . I_ TOP O pAg�TpREL:l7,' Subject: PlanCheck X TOP OF PLY s ROOF EL,123' Page Label: BLDG SECTIONS Reference your various floor and Author:justinh wall details in your sections. File Name: A-Architectural Plans.210 1st..2017.10.pdf Multiple details are not Reference your various floor and wall referenced anywhere in your details in your sections. Multiple details Response:The details have been referenced on all floor plans plans. are not referenced anywhere in your plans. Bldg. Sections and Elevations. TO FN TOP OF Fitt urcfe PATIO Resubmitted Sheets:All Plans/Elevations and Sections EL.III'-mi"' oo'�wowi-ia avrv,er ... ... .. ... .. ... ... .. ... .. ... .. ... ... .. ... .. ... ... .. ... .. ... ...... ... .. .. a_ ~- _ �, v No Subject: PlanCheck IProvide a stair detail showing ETAFit- _ i=_I=�= Author:justinh compliant riser height,tread ""°""i depth, handrail and guard �,,.�,,� I■I ll_ I File Name:A-Architectural Plans.210 1st..2017.10.pdf height, handrail size/type. Open ,�,.o,�# III_iP i Response:A new sheet has been added A-402 Interior risers where 30"above grade or '11111111 it Stairs that references Risers, treads and railings. greater are required to limit the .�.,. 11' I _ Submitted Sheet:A-401 Interior Stairs opening to 4"or less. mI o... Subject: PlanCheck ✓ e... e...� The door to the dwelling from the � Page Label: DOOR SCHEDULE o===ms� o..... garage 102A is the only door e..... Author:justinh ...... e... �J that is required to have a 20 o... . File Name:A-Architectural Plans.210 1st..2017.10.pdf ..... e...�. minute rating. You may revise o=== j e Response: The door note has been corrected. the other doors if you like. o===� e=== = Re-submitted Sheet:A-601 Door Schedule. Please note that door 102Ai it1 r i" E- ...... eppppp also be equipped.With a self l ,"-' .... .. e..... DOOR closing device. o... . • ,..J'n... 1 0/0 9/1 8 ASPEN BUILDING DEPARTMENT Subject: PlanCheck II -_ ,� •�-' �-• .w Page Label: DOOR SCHEDULE This is a very generic statement _;'t very regarding energy efficiency. CAM. energy efficiency. Author:justinh Provide acalshea File Name:A-Architectural Plans.210 1st..2017.10.pdf Provide a cutsheet on the the specific thatat specific door that gives a gives a wmpliant U r �EmED�a.,e.�a+� value o.28-r low per. ` compliant U value of.28 or _ lower. - " �" = - Response: Door 101 G has been re specified. r' _ _ The specs and U value as .185 are added to the Door Schedule. _a�...d„.,.._�..W �. . ' -., Re-submitted Sheet:A-601 Door Schedule and Specification added to the Door Schedule Comment not adequately addressed: utility meters not shown and multiple exhaust and Provide the installation manual intake vents shown are the mechanicalplan are forithe boiler to location comdemonstplies that Plans.210 1st..2017.10.pdf this venting complies not shown on the elevations, all intakes, with the specific units installation exhaust, and any other venting should be on Manual is submitted.the instructions. the exhaust is on the South side shown. Please revise. ee page 33-35 on the Lochinvar R°� M., installation specs. Located in the Documents, Item#28. Subject: PlanCheck X Page Label: ELEVATIONS Show all exhaust/vent Author:justinh terminations on your elevations File Name: A-Architectural Plans.210 1st..2017.10.pdf as well as utility meters and Show all exhaust/vent terminations on your other such items so that I may elevations as well as utility meters and other Response:All exhaust and vent terminations verify they are being placed in such items so that I may verity they are being placed in compliant locations. have been added to the Elevations. compliant locations. Re-submitted Sheets: Elevations A-301;A-302;A-303;A-304 -- -- --- -- -- --- -- --- --- -- --- -- -- --- -- --- -- -- --- -- --- -- -- --- -- --- --- -- <,-1V1= _"wR -= Subject: PlanCheck 1 _=I_1 Page Label: ELEVATIONS Provide the installation manual I Provide the installation Author justinh for the DV appliance so that manual for the DV mayverifyproper ventingper the appliance so that l may File Name: A-Architectural Plans.210 1st..2017.10. df p p verify proper venting p per the instructions. instructions. 9 Response: The installation manual is added to the permit documents. ROOF,EL:Iz4-9° In the Documents see Item#8 Fireplace Registration. the catalog is attached. EL:123'72 i" u �•s,,•,,;g•,,;gg,,;,.�,,� / Subject: PlanCheck jo;,,,,,,� rscak�`11111 �1,, U The definition of gross and fire Page Label: FIRE AREA CALLS %°" Author: 'ustinh area with respect to areas under %'��� t overhangs is the same, so this File Name: A-Architectural Plans.210 1st..2017.10.pdf • «. %s% area should match the overhang ` e� Response: The Gross Areas and Fire Areas have been a you are showing on your MAIN LEVEL FLOOR PLAN'"' °"'""'' ` °" UPPEF revised. gross area sheet. Please revise. SCALE:1/4"=1'-0" SCALI TOTAL FIRE Re-submitted sheets :A-003 and A-004 RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT a�^ • Subject: PlanCheck ✓ Page Label: FLOOR-WALL AND ROOF ASSEMBLIES This does not meet prescriptive °: •./ R value requirements for a :; Author:justinh UMW l File Name:A-Architectural Plans.210 1st..2017.10.pdf basement wall. Response: This detail has been revised. This does not meet prescriptive R value Re-submitted Sheets:A-501 requirements for a basement wall. OFOUNDATION(TYPICAL) Subject: PlanCheck ✓ Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Several notes are placed on top Author:justinh of this detail, I'm guessing they �_- W" File Name: A-Architectural Plans.210 1st..2017.10.pdf were not meant to be put on this detail. Please clean this up so �; Response: This detail has been revised. that I can read the notes if they ' e` '-,_ Re-submitted Sheets:A-501 were meant to be on the detail. — _ Subject: PlanCheck ✓ Comment not completely address, you „T_ 0DF Al Page Label: FLOOR-WALL AND ROOF i removed the reference to the 2012 IBC for Author:justinh fire rating but still have a line in the detail TYPICAL EAVE FASCIA DETAIL e/I P1TCN File Name: A-Architectural Plans.210 1st.for the interior wall which references a 1 C ,,,.a Response: All details has been revisec Per the letter from Bighorn wamltngyou hour wall. Please remove it. ere going rha perscripriva roNs for ensgy Re-submitted Sheets:A-501 cotle cpmpliance.This Epes nM meet u,v ura.v rva vu,r„ry vuv ur,y r a presaitive Rvalue.You era elm nM allipg pm apyRvalue br o r=° °p°°a value for your continuous °ammio°.aamaa an aau3ilaa snow °pma�mRvalpaaparlEcR°g3,.4 insulation. Revise all details to IECC R402.1.2. Subject: PlanCheckX Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Why are you proposing a 1 hour Why are you interior wall? proposing a 1 hour - Author:justinh interior wall? File Name: A-Architectural Plans.210 1st..2017.10.pdf —1 Response: This detail has been revised. Re-submitted Sheets:A-501 r u° - -- - -- -- - -- -- Subject: PlanCheck X Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Provide an R value for the rigid Author:justinh insulation to show compliance Provide an R value for with IECC R402.1.2. the rigid insulation to File Name: A-Architectural Plans.210 1st..2017.10.pdf show compliance with IECC R402.1.2. E Response: This detail has been revised. " r; ,, Re-submitted Sheets:A-501 RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT Subject: PlanCheck ✓ The garage-dwelling separation ® — "°°•"•° ' Page Label: FLOOR-WALL AND ROOF ASSEMBLIES „. Author:justinh wall is not required to be 1 hour, INTERIOR The garagaEwalling it must only meet the saps e-d ell all _I®I��° roves File Name:A-Architectural Plans.210 1 st..2017.10.pdf requirements of table R302.6. is not required to --� � °,esh°°'" Response: This detail has been revised. teonl men' "•,•c•. the lea '� '"" Re-submitted Sheets:A-501 I HOUR SEPARATION WALL f table R302.6. CD TYPICALo F INT.WALL BASE DETAIL Wr I 01 Subject: PlanCheck X - Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Your foundation wall is not Your awall bove Author: Author:justinh extending above grade as not asrequeedby WUS r = required by R404.1.6. The R404.1.6.The File Name: A-Architectural Plans.210 1st..2017.10.pdf be at least 6"wall when must - _— foundation wall must be at least foundation at least 6"when me:�fU°` using exterior covering Response: On A-501 it is noted that all framingbelow her than masonry. P 6"when using exterior covering nsurethatthe finished grade needs to be pressure treated wood or other than masonry. Ensure that structural foundation — plan is revised as tl needed to provide this = similar.w the structural foundation plan is required height above revised as needed to provide this required height above grade. Subject: PlanCheck ✓ ,.un..WFSFSTS ner7,:kr-P Page Label: FLOOR-WALL AND ROOF ASSEMBLIES This handrail has a perimeter Author:justinh greater than 6 1/4"and should Tmahanerannaaa0admaareraalarmanry File Name: A-Architectural Plans.210 1st..2017.10.pdf comply as a type II handrail per B It,a.Should c m as a type II rell per R311].8.3(2).Please revise R311.7.8.3 (2). Please revise -F.. a either latypelortype II ha droll. Response: This detail has been revised. this detail to show a handrail that Re-submitted Sheets:A-501 complies as either a type I or — type II handrail. -ANDRAIL (7 TYPICAL NIT WALL BABE DETAIL®GAR, Subject: PlanCheck ✓ Page Label: FLOOR-WALL AND ROOF ASSEMBLIES This assembly does not match Author:justinh ESR-2053 that you've provided. ' �40.-! - File Name: A-Architectural Plans.210 1st..2017.10.pdf Per the ESR this should be 2 layers of VersaShield and 15/32" • plywood sheathing. '� ...._,___,„ 0,....j ti Response: This detail has been revised. Re submitted Sheets:A-501 This assembly tloPs not ESN I.should mat ve IVe,sS Per Ia the ESROis be 2 ayers of VersaSM1leltl antl 15132"plygoptl sheamin!. _ Subject: PlanCheck ✓ Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Provide the R value for the ZIP Author:justinh panel insulation to show P File Name: A-Architectural Plans.210 1st..2017.10.pdf compliance with IECC R402.1.2. p.msN.Y nab s a pom 300300 p2,2 Response: This detail has been revised. I A� �µ Re-submitted Sheets:A-501 .�n._= 111 / ..o; g . •-� � A RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT Subject: PlanCheck ✓ o °n--' Page Label: FLOOR-WALL AND ROOF ASSEMBLIES You are referencing the 2012 Author:justinh IBC on this detail,that is not the File Name:A-Architectural Plans.210 1st..2017.10.pdf currently adopted code. This =-\ 777 detail does not match the r'''— '1'7« I MAC Response: This detail has been revised. referenced wall designs from the Re submitted Sheets:A 501 IBC. Provide a listed assembly q m.7 for this 1 hour wall or revise to ExiERI10 Figi OR WALL s 91,,, match an assembly from the IBC and reference it correctly. Subject: PlanCheck X I do not believe these Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Author:justinh assemblies are required to be 1 _ File Name: A-Architectural Plans.210 1st..2017.10.pdf hour, but as they are not referenced in your sections so I --- Response: This detail has been revised. cannot tell exactly where they - Re-submitted Sheets:A-501 are being proposed.All details — IC = _� need to referenced within your plans elsewhere. UL L518 calls t.....,====== ---•- for 2 layers of 1/2"gypsum board, none of these details are showing that. Subject: PlanCheck Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Per your elevations I do not see Per youreleva°°^sI where stone veneer is being do not see where Author:justinh stone edePleaer is se'n9 proposed. Please clarify. proposed File Name: A-Architectural Plans.210 1st..2017.10.pdf clanfy Response: This detail has been revised. these is no stone on the building. /-I " "°""'° ,""" Re-submitted Sheets:A-501 I /-11 �: oulossscfrworw A 1 1 a Pies, -r t r '.r ,,,". s Lk Subject: PlanCheck ✓ Note an R value for the under aE /zt; ` `. Page Label: FLOOR-WALL AND ROOF ASSEMBLIES .. Author:justinh slab insulation. "" — 'FL:7 WilI ',.. - • '• File Name: A-Architectural Plans.210 1st..2017.10.pdf IMLATION OVER GRAVEL BED 1.0 PIPE Response: This detail has been revised.Also, the R-5 Slab insulation is called out on the Bldg. O4 FOUND•TION(TYPICAL) Sections. xcuE:,•.r� Re-submitted Sheets:A-501 Note an R value for the under slab insulation. RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT Subject: PlanCheck Page Label: FLOOR-WALL AND ROOF ASSEMBLIES Show how you are creating a u `ea ° Author:justinh continuous air barrier per IECC ,�tl File Name:A-Architectural Plans.210 1st..2017.10.pdf R402.4. Table R402.4.1.1 provides more information on what this entails. I've attached Response: A note has been added to some examples of detailing for me; ;' A-501 referencing the air sealant details various methods of air-sealing. eOrae. requiredper code. It appears that you may be A h Re-submitted Sheets:A-501 intending to use an exterior air A-501.1 Sealant Diagrams barrier by taping the ZIP panels, detail how that continuous barrier will transition to the foundation and roof systems if this is the method you are proposing. The continuous air barrier can be accomplished with various combinations of interior and exterior methods (ZIP panels,taped drywall, spray foam, etc.), but we need to be able to see how this will be achieved, specifically at transitions to dissimilar materials. --- -- --- -- --- -- --- --- -- --- -- --- --- -- --- -- --- ------ --- -- --- -- --- --- -- --- -- �... _ u•jec : ' an heck �/ r�1 • Page Label: LOWER PLAN Please note that a separate ELEV m s,° NWCCOG permit is required for • � Author:justinh a3/ elevator installation. . _....:sll= 1sa File Name:A-Architectural Plans.210 lst..2017.10.pdf 11- — J Response: The elevator note has been added to all floor plans. Re-submitted Sheets:A-100 Lower Plan;A-101 Main Plan; A-102 Upper Plan ET NWCCOG paimit is requi elevator inslallat Door D. -S EA HI I - Subject: PlanCheck ✓ Specify the headroom in this i I w Page Label: LOWER PLAN ILL— I = Author:justinh space as it is not shown on your AL I_— ii spa° tnanaad�m sections. �_ I� ; °a�a�aa;,;° File Name:A-Architectural Plans.210 1st..2017.10.pdf 71 °nowa as Y° °1 r 1 , 5 "r Iri— Response: The headroom under the stairs at the Lower Level is 7'-6". The low headroom note has pw� � ���� beens removed. Re submitted Sheets:A-100 Lower Plan;A-101 Main Plan;A-102 Upper Plan;A-103 Roof Plan :willSI — Subject: PlanCheck ✓ Page Label: LOWER PLAN Identify north on all your floor 4 Author:justinh plans File Name: A-Architectural Plans.210 1st..2017.10.pdf 'Identify north on all your floor plans' Response: North Arrows have been added to the floor plans. RE-submitted Sheets:A-100 Lower Floor Plan;A-101 Main Level Floor Plan;A-102 Upper Level Floor Plan;A-103 Roof Plan RECEIVED 10/0 9/18 ASPEN BUILDING DEPARTMENT .J Comment not adequately address. As originally stated secondary roof drain =oweRsouRce systems must discharge to a conspicuous location so that the owner/property ,No CHASE FOR VENT To R manager is made aware of a block in the primary drain. The detail you IT Tire TioNT TO Fo oA, .provided shows the secondary drain being routed into the same drain line as 1the primary drain. Original comment still stands, identify the location of the conspicuous discharge for the secondary roof drainage, separate from the ,Your note is cut oft, primary roof drainage discharge, to demonstrate compliance with IPC 1108.2. t Subject: PlanCheck 1 �`" o � Page Label: ROOF PLAN wt, � �_ ___ secondary roof drain systems Author:justinh i" IPC 1108.2 requires that "- discharge to a conspicuous ---E� File Name: A-Architectural Plans.210 1st..2017.10.pdf location separate from the ir s" :-4 Response: A diagram detail of a primary and secondary primary discharge so that a F. 7��t ° �:°m''""-' manufactured roof drain has been added to the Roof Plan. block in the primary can be R,r ROCF _ II The roof deck has been revised to be a sloping deck that identified. Show where this F --0 drains to a gutter. conspicuous location is for all I .> Re submitted Sheet:A-104 roof Plan secondary drains. _m 1 Subject: PlanCheck 1 Page Label: ROOF PLAN Show the radon vent pipe Show the radon vent pipe 1/ termination on your roof plan. termination on your roof Author:justinh plan. The vent pipe File Name: A-Architectural Plans.210 1 st..2017.10.pdf The vent pipe termination must termination must be at — be at least 12"above the roof least 12"above the roof Response: The radon Pipe has been added to the Roof Plan. and not less than 10'from any —'— and not less than 10'from "'—' Re-submitted Sheet:A-104 Roof Plan openings into the building that any openings into the building that are less than are less than 2' below the 2'below the exhaust point., exhaust point. i 1 m yA Subject: PlanCheck `i Provide the elevations of the I ] Page Label: ROOF PLAN 4 --""°-1 Author:justinh drain and point of overflow at the 1-- .- a�: �� ~a" ;J' �« g ° File Name: A-Architectural Plans.210 1st..2017.10.pdf open railing. R903.4.1 requires e .. u�, a scupper to be located 2"above ,.... y �u Response: The roof deck has been changed the elevation of the drain. The t t't t f i t't'!'"""` s and will slope to drain. point of overflow at the open Resubmitted Sheet:A-104 Roof Plan railing must meet this same " """ requirement if it is to take the �_ � \ . place of a scupper. RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT — Subject: PlanCheck • g V \ Provide a plan that dimensions �' *I&� �I Page Label: SITE PLAN Falb the distance between these %ait Author:justinh structures. If you have points File Name:A-Architectural Plans.210 1st..2017.10.pdf :!„i _ m p,T y p that are less than 10'draw an lit • •m'f assumed property line between If , �''��"�� - x Response:A-502 has been provided with dimensions p p y f„•; the structures that complies with 4fit• IW - v between the two structures.An assumed property line 5' R302.1(1)for the conditions of �e ,c_ yr from the perimeter of the South wall of 135 West Hopkins the existing residence(for (the existing building) has been drawn.The existing building example, if the existing building does not have a fire rated wall on this South side,thus the does not have a fire rated wall assumed property line is 5'feet from the South wall of the on this side the assumed existing structure.There are no openings where the area property line must be placed at between the building is less than 5'. least 5'from the existing The north wall and the east wall of the new structure is structure). If you have areas proposed to be a 1 HR.fire rating. with less than 5'separation from Submitted Information: See Zip panel 1 hour rating detail. the proposed residence to the Sheet A-502. assumed property line provide an elevation calculating percentage of openings to show compliance with R302.1(1). Any walls within 5'of the assumed property line must have a 1 hour fire rating. Subject: PlanCheck / //''' i__ The mechanical plans show 3 �i '3- Page Label: SITE PLAN condensing units in this location, • a b g - Author:justinh R a / File Name: A-Architectural Plans.210 1st..2017.10.pdf please revise for consistency. �, Response: The Mechanical plans have been revised to show 2 A/C condensing � ®,.4 1�°.": units. �� iplaiiiir Re-submitted Sheets: Mechanical Sheets are being re-submitted. P Lots A, Subject: PlanCheck, °^"&�i These references are different (LIGHT L Pa " Page Label: SKY LIGHT DETAILS ii ` Author:justinhthat what is shown on the roof ;splan, please revise one or the File Name:A-Architectural Plans.210 1st..2017.10.pdfSURVEY E HIGH CM other for consistency. - Rsponse: The references have been acorrected. a n, Re-submitted Sheet:A-104 Roof Plan M 4ZINCz: I-I/2"HEAT MIRROR 66 -„.., P Subject: PlanCheck ✓LLL.rlia Page Label: SNOWMELT PLAN Please check that the snowmelt Author:justinh drawings are scaled correctly. ::f File Name: A-Architectural Plans.210 1st..2017.10.pdf When I measure them at 1/4" M E�.o.• Es. m�= scale I get roughly half of the ;u;I' L:?J 'STREET . ,~-~ "�"' square footage you are showing. Response: The architectural scale on A-401 has been revised from 1/4"= 1'-0"to 3/16"= 1'-0". the scale was wrong as previously submitted. Re-submitted Sheet:A-401 Snowmelt Diagram and Calculations RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT ..... Subject: PlanCheck ✓ Page Label: SNOWMELT PLAN These square footages should Author:justinh match. If the 135 SF is the ° correct amount be sure to revise - = File Name:A-Architectural Plans.210 1st..2017.10.pdf ° that on the above table on this . .. Response: A-401 Snowmelt Calculations have been sheet as well as on the REMP a i e -- Revised. form as the 133 SF was used for sNo Re submitted Sheet:A-401 Snowmelt Diagram both. PLAr and Calculations Subject: PlanCheck X _1 Page Label: SNOWMELT PLAN Are you proposing to snowmelt Author:justinh the stairs or just the deck area e°mm ai d:, :re� e QB"� • L File Name: A-Architectural Plans.210 1st..2017.10.pdf under them? The floor plans call w� , • out metal stairs but there is a II F Response:The stairs to the deck area are metal detail in the mechanical plans for i and are not snow-melted. This has been coordinated concrete steps with snowmelt 1 III with the Mechanical plans. tubing. Please clarify and revise � Re-submitted Sheets: Mechanical Plans ans new A-402 if needed for consistancy. Exterior Stairs Subject: PlanCheck ✓ ' Page Label: UPPER PLAN Maximum riser height is 7 3/4" Author:justinh per R311.7.5.1, please revise on r , 101�' File Name: A-Architectural Plans.210 1st..2017.10.pdf this sheet as well as on the roof NI—RIM 11 plan. Provide a stair detail Response:A new A 402 showing the plans and details showing compliant riser height, I « of the Exterior Stairs has been added for clarification. tread depth, handrail and guard a RE-submitted Sheet:A-402 Exterior Stairs height, handrail size/type. Open risers where 30"above grade or --r_ ._ greater are required to limit the opening to 4"or less. M-Mechanical Plan Set.210 1st.2017.10.pdf(4) Subject: PlanCheck ✓ The O.A. intake is not allowed in i ! Page Label: M1 2 these locations as the covered i ! Author:justinh In i •File Name: M-Mechanical Plan Set.210 1st.2017.10.pdf drive way is considered a °°°4 carport. R303.5.1 prohibits , .A Response: The OA has been relocated to the intake openings within 10'of • I north side of the building. See Mechanical Plans streets or parking areas. I I Re-submitted Sheets: Mechanical Plans- II ®MIIM '®30' Subject: PlanCheck ✓ You are showing a range hood Page Label: M1-3 ! gip's' Author:justinh on this plan but no information is 1 1 °,21 ,F. p p a111' File Name: M-Mechanical Plan Set.210 1 st.2017.10.pdf provided regarding it on the I equipment schedules. Please L- __ � Mechanical Response: See attached revise the equipment schedules _ - ' ro� response below. to show the actual kitchen - Architecture Response: See attached exhaust system you are _ TrWolff induction cook top specification and proposing. Wolff Recirculating hood with charcoal filter. The system is ductless.The specs are in the Document file Item#30. RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT Subject: PlanCheck Page Label: M1-5 Please provide more information Please provide more information Author:justinh showing how the balanced showing how the balanced whole File Name: M-Mechanical Plan Set.210 1 st.2017.10.pdf whole house ventilation required house ventilation required by COA Eau,pg municipal code 8.44.020(m)is being by COA municipal code L provided. I need more information Response: See Mechanical notes attached. 8.44.020(m) is being provided. I H on the exhaust rate of the whole house ventilation system so that I need more information on the i can verify that supply and return are = Ex exhaust rate of the whole house balanced within 20%of each other. ventilation system so that I can verify that supply and return are balanced within 20%of each other. Subject: PlanCheck Page Label: M1 6 �/ Where are snowmelted steps Author:justinh being proposed? Per the File Name: M-Mechanical Plan Set.210 1st.2017.10.pdf architectural plans the stairs on the snowmelted deck are metal. r ° J Response: There are no snow melted steps. M1-6 has been revised and resubmitted. slnia P 'i miJr5 RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT _ Subject: PlanCheck ✓ �:.- These square footages should r i-- Page Label: SNOWMELT PLAN Author:justinh match. If the 135 SF is the ° correct amount be sure to revise - = File Name:A-Architectural Plans.210 1st..2017.10.pdf ° that on the above table on this —_.a Current mechanical design can accommodate either sheet as well as on the REMP RO,LEVELTOTALEPLE53037 ,... 135 or 133 square feet form as the 133 SF was used for SNOLIPIELT DIAGRAM A-00, sNo both. PLAr Subject: PlanCheck ✓ x1 Page Label: SNOWMELT PLAN Are you proposing to snowmelt Author:justinh the stairs or just the deck area "m 2 " � under them? The floor plans call File Name: A-Architectural Plans.210 1st..2017.10.pdf 1 INout metal stairs but there is a I■ See above detail in the mechanical plans for Iriga concrete steps with snowmelt MI tubing. Please clarify and revise if needed for consistancy. Subject: PlanCheck o 'i� Page Label: UPPER PLAN Maximum riser height is 7 3/4" � � (� Author:justinh per R311.7.5.1, please revise on EllI■�� I File Name: A-Architectural Plans.210 1st..2017.10.pdf this sheet as well as on the roof I� 11 plan. Provide a stair detail e; i __ °. showing compliant riser height, __ I « See above tread depth, handrail and guard ® F height, handrail size/type. Open risers where 30"above grade or greater are required to limit the opening to 4"or less. M-Mechanical Plan Set.210 1st.2017.10.pdf(4) Subject: PlanCheck The O.A. intake is not allowed in 1 Page Label: M1-2 Author:justinh ✓ these locations as the covered I IN 1 File Name: M-Mechanical Plan Set.210 1st.2017.10.pdf drive way is considered a °°°• carport. R303.5.1 prohibits i; See above intake openings within 10'of streets or parking areas. "...; �Ii I I- Subject: PlanCheck Page Label: M1-3 You are showing a range hood 1 1 gip's'' Author:justinh ,/ on this plan but no information is E ro i P a File Name: M-Mechanical Plan Set.210 1st.2017.10.pdf provided regarding it on the I equipment schedules. Please & -2,J--_--_- -.. The selection of the exhaust hood and fan is outside revise the equipment schedules Bighorn's scope of work. Typically residential range to show the actual kitchen --__ hoods are selected by the owner, architect, and or exhaust system you are N- contractor. Bighorn selects heating equipment that can accommodate even large exhaust hoods if proposing. Wr -- � required (up to 1200 cfm)..Contractor to verify - exhaust hood airflow requirements and balance fan coil outside airflow rates accordingly. If desired, Bighorn can be contacted to request expanding scope of work to include selecting kitchen exhaust equipment. RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT Subject: PlanCheck Page Label: M1-5 Please provide more information Please provide more information Author:justinh showing how the balanced — showing how the balanced whole File Name: M-Mechanical Plan Set.210 1 st.2017.10.pdf whole house ventilation required house ventilation •required by COA ��� byCOA municipal code — municipal code 8.44.020(m)is being p Fan Coils will provide the ventilation air by pulling in O.A.through provided. I need more information louvers.The current mechanical design shows about 10%outside air 8.44.020(m) is being provided. I on the exhaust rate of the whole ' provided to the fan coil units(with the exception of the two fan coils need more information on the house ventilation system so that I ,r.n, serving the kitchen.These units will operate and provide,make up air i can verify that supply and return are z Ex when the kitchen exhaust hood is running in order to maintain exhaust rate of the whole house balanced within 20%of each other. building pressures.When°the kitchen hood is not running,these two ventilation system so that I can units shall reduce to a 10%outside airflow.contractor to verify exhaust hood requirement and adjust outside airflow set points verify that supply and return are accordingly).The outside airflows listed on the plans not only meet, balanced within 20%of each but exceed the required ventilation airflow.Through the unit controls,the fan coils shall be set to operate 1 hour in every 4 hours. other. Air balance calculation can be provided if required. c, P -n• e• oh- e . e n.r - t-• s -p Page Label: M1-6 Author:justinh being proposed? Per the File Name: M-Mechanical Plan Set.210 1st.2017.10.pdf architectural plans the stairs on the snowmelted deck are metal. , See Above. '.4114 6 slnia Pa„� '41 519 " r Per my calculation, using 3100 SF of interior space with 4 bedrooms, this home would require approximately 206 cfm when operating 1 hour in every four per our requirements. I agree that you are supplying at least that much, but I do not see how your plans show it as being balanced. This needs to be mechanically balanced and exhausted to within 20% to meet our requirements. Please revise your plan or clarify how this is being accomplished. RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT i SubjectHPC } Page: Sheet A-101 Main Plan:Electric, --- - -- - - - --- -- -- MAIN PLAN --' Author;sarahy Gas,Water meters are in a Architect to confirm final location of utilities with contractor and utility location that differs from the ` __ � provider. Mechanical plans. Please adjust. • � I � The location needs to be ih11 approved by staff and monitor 6:=:1Ve ,T according to the HPC Resolution ono,�1+-�� Ir #38,Series of 2007. IILIP p M-Mechanical Plan Set.210 1st.2017.10.pdf(4) ! ! ! ! Subject: PlanCheck f i I I Page Label:M1-2 (� The O.A.intake is not allowed in ! i i ! Author:justinh these locations as the covered I ! File Name: M-Mechanical Plat t .2017.10.pdf drive way is considered a --- met carport. R303.5-1 prohibits t �/ intake openings within 10'of ; streets or parking areas. Subject- 1V I l Page P You are showing a range hood ,,,�, A ,. on this plan but no information is �""" provided regarding it on the I F" ` _ -Mechanical Plan Set.210 1st.2017.10.pdf ``�)V equipment schedules. Please V revise the equipment schedules " - ° I to show the actual kitchen VI IT � i O exhaust system you are ( I proposing. RECEIVED 10/09/18 ASPEN BUILDING DEPARTMENT