Loading...
HomeMy WebLinkAboutFile Documents.743 Cemetery Ln.0011.2018 (11).ARBK Bighorn Consulting Engineers,Inc. ROOF DEW POINT ANALYSIS Outside air film—0.17 °F*ft2*h/Btu Roofing Material—0.33 °F*ft2*h/Btu 5/8"plywood—0.77 °F*ft2*h/Btu Joists roof framing with spray foam insulation— 8" at R5.8/inch=>46.4 °F*ft2*h/Btu 5/8"gypsum board—0.56 °F*ft2*h/Btu Inside air film—0.61 °F*ft2*h/Btu Total Roof R-Value—49 °F*ft2*h/Btu Interior Conditions—70°F and 35% RH=>Dew Point= 41°F R-Value at 41°F Dew Point: ° f a 49 F • t • h 99°F L T x (70°F DB — 41°F DP) = 14.35 Btu This implies the dew point falls inside the spray foam insulation. RECEIVE J 743-745 Cemetery Lane Residences Aspen, Colorado 81611-Roof Dew Point Analysis-17154 61.7 1 2 018 ASPEN BUILDING DEPARTMENT