Loading...
HomeMy WebLinkAboutFile Documents.330 Gillespie St.0003.2018 (14).ARBK EVOK STRUCTURAL DESIGN 1040 MAIN STREET • CARBONDALE,CO 81623 • (970)510-0773 www.evolvestruct.com November 20, 2017 Alison Agley Rowland + Broughton 234 East Hopkins Avenue Aspen, Colorado 81611 RE: 330 Gillespie Avenue Aspen, Colorado Dear Alison, As requested we have reviewed the potential structural impact of the proposed interior remodel at the residence noted above. Our review is based upon existing and proposed architectural drawings provided by Rowland + Broughton, dated October 27, 2017. The current proposed scope of work includes the demolition of the existing bedroom and storage walls in the basement, as well as the bathroom and closet walls on the second level. Once demolition can begin,the interior ceiling finishes shall be partially removed (in locations shown in the attached plans) in order to verify the potential effect on the existing structure, if any. Once the structure is exposed,we shall be contacted to visually observe the conditions. We request the contractor be on site during the structural inspection to open any additional finishes required to identify the existing structure. We will then be able to conclude upon the structural impact of the proposed remodel.This shall be done prior to proceeding with the removal or modification of any framing members. Should you have any further questions regarding this matter, please feel free to contact our office. Sincerely, Evolve Structural Design LLC Reviewed By: Sara Mickus, PE Dustin Wheatley, El Principal Project Engineer •"?. pp0 LICE%I1 ••..•.. 1114* 43316• • i II 6s(••WJ .••4 % -NONAt.t" RECEIVED 01/09/2018 ASPEN BUILDING DEPARTMENT