HomeMy WebLinkAboutFile Documents.330 Gillespie St.0003.2018 (17).ARBK PERMIT NUMBER: ADDRESS: 3 'O �i Ila�'L '
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET THE CITY OF ASPEN
FOR PLAN REVIEW QUESTIONS
Name ALISON AGLEY Phone 9711274.9796 E-mail ALISON.AGLEY@ROWLANDBROUGHTON.COM
FOR INSPECTION QUESTIONS
Name BEN ALLEN Phone 970.948.189° E-mail BENIASEDGWICK@YAHOO.COM
OWNER
Name JOBEN LLC Phone 970.274.9796 Cell Phone 97°.274.9796
Mailing 330 GILLESPIE AVE ASPEN CO 81611
Address City State ZIP
E-mail NSHORE@FORTRESS.COM
Address
OWNER'S AUTHORIZED AGENT
Name ALISON AGLEY Phone 97°.274.9796 Cell Phone 97°.274.9796
Mailing PO BOX 7911 City ASPEN State CO ZIP 81612
Address
E-mail ALISON.AGLEY@ROWLANDBROUGHTON.COM
Address
APPLICATION BEST CONTACT
Name ALISON AGLEY Phone 970.274.9796 Cell Phone 97°274.9795
Mailing PO BOX 7911 ASPEN CO 81612
Address City State ZIP
E-mail ALISON.AGLEY@ROWLANDBROUGHTON.COM
Address
ARCHITECT OR DESIGNER OF RECORD
Name SARAH BROUGHTON Phone 970.544.9006 Cell Phone 97°.274.9796
.Mailing 234 E HOPKINS AVE ASPEN CO 81611
Address City State ZIP
E-mail SARAH@ROWLANDBROUGHTON.COM
Address
CIVIL ENGINEER OF RECORD •
Name Phone Cell Phone
Mailing
Address City State ZIP
•
E-mail
Address
STRUCTUAL ENGINEER OF RECORD
Name EVOLVE STRUCTURAL DESIGN Phone 97°.510.0773 Cell Phone 97°618.77°9
Mailing 1040 MAIN STREET CARBONDALE CO 81623
Address City State ZIP
E-mail SARA@EVOLVESTRUCT.COM OR DUSTIN@EVOLVESTRUCT.COM
Address
GENERAL CONTRACTOR
Name BEN ALLEN Phone 970.948.1890 Cell Phone 97°.948.189°
Mailing PO BOX 10251 City ASPEN State CO Z1P 81612
Address
E-mail BENIASEDGWICK@YAHOO.COM
Address
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to r iew the approved plans and any comments that are contained thereon and see that the
structure and oject is built in.co an 'th all applicable codes. /� �b
Contractor
Signature Date
E t)
Che ou ar a tested o builder(single-family homes only).You must take a test and comp to the o‘, ne it*affida
(CITY USE ON )Owner b I r approved by: 1 Date: Affidavit on file
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, 00/8161.`11E
A 61-'isle!
BUILDING DEPARTMENT
PERMIT NUMBER: ADDRESS: 33a Ca11II41 ,1�.
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY TIIEQ„OF ASPEN
•
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submissio,i of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observe filsiKpir
Additional roof plans showing location of measurements may be necessary. 1,,CI r
CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, Ccli fe21°ILr
BUILDING DEPARTMENT
PERMIT NUMBER: ADDRESS: 330 (.'1i« Uri !�
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THE CITY OF ASPEN
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
•
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment: ��))��
I (contractor name) -AA AiltAn 1 TA SeAr �rr6erstand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitatio
ag//(
Contractor Signature:
Date: /9/26 2
RECEIVE
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, 00/8161u198
/-k5rciv
BUILDING DEPARTMENT