Loading...
HomeMy WebLinkAboutFile Documents.330 Gillespie St.0003.2018 (17).ARBK PERMIT NUMBER: ADDRESS: 3 'O �i Ila�'L ' COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET THE CITY OF ASPEN FOR PLAN REVIEW QUESTIONS Name ALISON AGLEY Phone 9711274.9796 E-mail ALISON.AGLEY@ROWLANDBROUGHTON.COM FOR INSPECTION QUESTIONS Name BEN ALLEN Phone 970.948.189° E-mail BENIASEDGWICK@YAHOO.COM OWNER Name JOBEN LLC Phone 970.274.9796 Cell Phone 97°.274.9796 Mailing 330 GILLESPIE AVE ASPEN CO 81611 Address City State ZIP E-mail NSHORE@FORTRESS.COM Address OWNER'S AUTHORIZED AGENT Name ALISON AGLEY Phone 97°.274.9796 Cell Phone 97°.274.9796 Mailing PO BOX 7911 City ASPEN State CO ZIP 81612 Address E-mail ALISON.AGLEY@ROWLANDBROUGHTON.COM Address APPLICATION BEST CONTACT Name ALISON AGLEY Phone 970.274.9796 Cell Phone 97°274.9795 Mailing PO BOX 7911 ASPEN CO 81612 Address City State ZIP E-mail ALISON.AGLEY@ROWLANDBROUGHTON.COM Address ARCHITECT OR DESIGNER OF RECORD Name SARAH BROUGHTON Phone 970.544.9006 Cell Phone 97°.274.9796 .Mailing 234 E HOPKINS AVE ASPEN CO 81611 Address City State ZIP E-mail SARAH@ROWLANDBROUGHTON.COM Address CIVIL ENGINEER OF RECORD • Name Phone Cell Phone Mailing Address City State ZIP • E-mail Address STRUCTUAL ENGINEER OF RECORD Name EVOLVE STRUCTURAL DESIGN Phone 97°.510.0773 Cell Phone 97°618.77°9 Mailing 1040 MAIN STREET CARBONDALE CO 81623 Address City State ZIP E-mail SARA@EVOLVESTRUCT.COM OR DUSTIN@EVOLVESTRUCT.COM Address GENERAL CONTRACTOR Name BEN ALLEN Phone 970.948.1890 Cell Phone 97°.948.189° Mailing PO BOX 10251 City ASPEN State CO Z1P 81612 Address E-mail BENIASEDGWICK@YAHOO.COM Address INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to r iew the approved plans and any comments that are contained thereon and see that the structure and oject is built in.co an 'th all applicable codes. /� �b Contractor Signature Date E t) Che ou ar a tested o builder(single-family homes only).You must take a test and comp to the o‘, ne it*affida (CITY USE ON )Owner b I r approved by: 1 Date: Affidavit on file CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, 00/8161.`11E A 61-'isle! BUILDING DEPARTMENT PERMIT NUMBER: ADDRESS: 33a Ca11II41 ,1�. COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY TIIEQ„OF ASPEN • Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submissio,i of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observe filsiKpir Additional roof plans showing location of measurements may be necessary. 1,,CI r CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, Ccli fe21°ILr BUILDING DEPARTMENT PERMIT NUMBER: ADDRESS: 330 (.'1i« Uri !� COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THE CITY OF ASPEN 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. • All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: ��))�� I (contractor name) -AA AiltAn 1 TA SeAr �rr6erstand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitatio ag//( Contractor Signature: Date: /9/26 2 RECEIVE ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, 00/8161u198 /-k5rciv BUILDING DEPARTMENT