HomeMy WebLinkAboutFile Documents.210 S 1st St.0281.2017 (20).ARBK Permit No.
COMMUNITY DEVELOPMENT DEPARTMENT
r; For height verification: Elevation drawing(s) showing the natural or finished grade of the
property, maximum permitted height, building elevations including the nominal roof form
(inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding
all exterior surface treatments such as shakes, singles, or other veneer treatments or
ornamentation), and the location and dimension of each observed measurement. Additional
roof plans showing location of measurements may be necessary.
r, Plans and elevations must include height or setback exemption items unique to the building,
such as stair/elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other
height or setback exemption items unique to the project.
The report shall include a written description or drawing notes of the benchmarks or control
points used to establish property boundaries, setbacks, building location, building height,
and grades for each measurement.
H, Ali drawings must correlate with the building locations, elevations, and grading/drainage
representations in the approved building permit set.
I The report must include the signature, date, and stamp of Colorado Professional Land
Surveyor who conducted the field measurements certifying that the field measurements are
accurately represented.
Review and Acceptance of Report. The Zoning Officer shall review the report(s) and either
confirm the project conforms to the dimensions shown on the zoning sheets of the approved
building permit plan set and meets the zoning limitations for the property or shall determine
which elements of the project are not in compliance. The Zoning Officer may request additional
information to verify zoning compliance, which may include but is not limited to additional survey
work or a site visit.
All drawings of the survey report must correlate with representations in the approved building
permit set for acceptance. Modifications to field conditions or amendments to the building permit
may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible
work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably
practical in the construction process to minimize disruption to the construction schedule.
Acknowledgment: ll
I (contractor name) Ll understand this policy. I agree that
this project will comply with the zoning limitations affecting this parcel and the representations
made on the zoning sheets of the approved building permit plans. I understand that a Certificate
of Occupancy will not be issued until this project complies with all applicable zoning limitations.
Contractor signature:
I�at /L' :�S J/7-
RECF VED
April. 2013 dimillEity of Aspen 1130 S. Galena St. i (970)920 5')90 I 7
ASPEN
BUILDING DEPARTMENT