Loading...
HomeMy WebLinkAboutFile Documents.210 S 1st St.0281.2017 (30).ARBK 0 SPEN PARKS & RECREATION October 26th, 2017 Gretchen Greenwood Gretchen Greenwood Architects, Inc. 210 South Galena Street Suite 3o Aspen, CO 81611 (97o)425-45oz www.gretchengreenwoodarchitects.com Dear Ms. Greenwood: The City of Aspen Parks Department hereby authorizes Gretchen Greenwood Architects, Inc.the submission of landscape and irrigation documentation package(detailed in section 4 of the Water Efficiency Standards)for 210 South First Street prior to the completion of the landscape and irrigation plan.The plan shall include irrigation and landscape plan for the north end of the property and right- of-ways, as well as adjustments to the water budget calculation sheet. Completed plans must comply with the Water Efficiency Standards,with consideration to the pilot phase allowance. The applicant is responsible for submitting the required documentation for water efficient landscape review prior to the second feedback exchange of the building permit review. Submission of the landscape and irrigation documentation must be given to the Permit Coordinator.The Gretchen Greenwood Architects, Inc. is also responsible for informing the Parks Department Landscape Plan Review Technician the intended date of submission. Please sign the bottom line to in as proof you agree with these terms, send a copy back to the Landscape Plan Review Technician. Keep a copy of this document as proof of authorization. Sincerely, `i'Gd, 3-'6.14224— Molly Somes, Landscape Plan Review Technician City of Aspen, Parks and Recreation Department 585 Cemetery Lane Aspen, Co 81611 I, ,agree with the terms of this document. Signature: Date: RECEIVED 11/02/2017 ASPEN BUILDING DEPARTMENT 411 THE CITY OF ASPEN FROM: City of Aspen Parks Department 585 Cemetery Lane Aspen, CO 81623 DATE: TO: Re: Efficient Landscape Ordinance Pre-Submittal Approval Dear applicant, This communication is to inform you that the City of Aspen Parks Department is satisfied with the pre- application submittal for the Efficient Landscape Ordinance. The City will be working with you during the permitting process on compliance with the landscape ordinance. Sincerely, Plans Review echnician (Water Efficient Landscaping) RECEIVED 11/02/2017 ASPEN BUILDING DEPARTMENT