HomeMy WebLinkAboutFile Documents.210 S 1st St.0281.2017 (31).ARBK CITY OF ASPEN WATER UTILITY
DEVELOPMENT REVIEW FEE
ECU CALCULATION WORKSHEET FOR REMODEL
DATE: OCTOBER 25, 2017 PERMIT #
NAME:135 HOPKINS LTD. ACCT. #
ADDRESS:210 SOUTH FIRST ST.
NUMBER OF TOTAL PROPOSED
NUMBER OF EXISTING FIXTURES NUMBER NUMBER OF ECU COUNT
ECU EXISTING ECU TO BE OF NEW WATER FOR
FIXTURE RATE FIXTURES* COUNT REMOVED FIXTURES FIXTURES REMODEL
(A) (B) (C) (D)
BEDROOM 0.10 0 0 0 4 4 0.4
tub/shwr,toilet,lay=1st Bath 0.36 0 0 0 0 0
tub/shwr,toilet,lay=2nd Bath 0.24 0 0 0 0 0
TOILETS/URINALS/BIDETS 0.05 0 5 5 0.25
LAV 0.02 0 7 7 0.14
TUB/SHOWER 0.05 0 0 0 0
TUB ONLY 0.05 0 1 1 0.05
TUB OVERSIZED 0.02 0 0 0 0
WHIRLPOOL UPGRADE 0.05 0 1 1 0.05
SHOWER STALL 0.05 0 4 4 0.2
STEAM ROOM/SHOWER 0.08 0 1 1 0.08
STEAM SHOWER UPGRADE 0.03 0 0 0
KITCHEN 0.25 0 0 0
DISHWASHER 0.10 0 1 1 0.1
DISPOSAL 0.05 0 1 1 0.05
ADD KITCHEN SINK/POT FILLER 0.05 0 1 1 0.05
KITCHEN/EFF. 0.15 0 0 0
BAR/HAND SINK 0.05 0 0 0
ICE MACHINE 0.05 0 1 1 0.05
WASHER 0.10 0 1 1 0.1
LNDRY/UTIL. SINK/DOG WASH 0.05 0 1 1 0.05
1st HOSE BIB 0.20 0 1 1 0.2
2nd HOSE BIB 0.10 0 1 1 0.1
ADD HOSE BIB 0.05 0 1 1 0.05
HOT TUB/@100 GAL 0.02 0 0 0 0
ADD LANDSCAPE/ 100 SQ FT 0.01 0 0 0
POOL/ 1000 GAL/YEAR ROUND 0.02 0 0 0 0
TOTAL ECU COUNT _ 0 1.92
INCREASE IN ECU COUNT DUE TO
REMODEL 1.92
TOTAL DEVELOPMENT REVIEW FEE $2,269.06
*Note: If the number of existing fixtures that you provide in column A differs from the number in the Utilities Department's records, the Department will revise those
numbers during its review of your permit. As a result these fees may change. RECEIVED
11/02/2017
ASPEN
BUILDING DEPARTMENT