Loading...
HomeMy WebLinkAboutFile Documents.210 S 1st St.0281.2017 (31).ARBK CITY OF ASPEN WATER UTILITY DEVELOPMENT REVIEW FEE ECU CALCULATION WORKSHEET FOR REMODEL DATE: OCTOBER 25, 2017 PERMIT # NAME:135 HOPKINS LTD. ACCT. # ADDRESS:210 SOUTH FIRST ST. NUMBER OF TOTAL PROPOSED NUMBER OF EXISTING FIXTURES NUMBER NUMBER OF ECU COUNT ECU EXISTING ECU TO BE OF NEW WATER FOR FIXTURE RATE FIXTURES* COUNT REMOVED FIXTURES FIXTURES REMODEL (A) (B) (C) (D) BEDROOM 0.10 0 0 0 4 4 0.4 tub/shwr,toilet,lay=1st Bath 0.36 0 0 0 0 0 tub/shwr,toilet,lay=2nd Bath 0.24 0 0 0 0 0 TOILETS/URINALS/BIDETS 0.05 0 5 5 0.25 LAV 0.02 0 7 7 0.14 TUB/SHOWER 0.05 0 0 0 0 TUB ONLY 0.05 0 1 1 0.05 TUB OVERSIZED 0.02 0 0 0 0 WHIRLPOOL UPGRADE 0.05 0 1 1 0.05 SHOWER STALL 0.05 0 4 4 0.2 STEAM ROOM/SHOWER 0.08 0 1 1 0.08 STEAM SHOWER UPGRADE 0.03 0 0 0 KITCHEN 0.25 0 0 0 DISHWASHER 0.10 0 1 1 0.1 DISPOSAL 0.05 0 1 1 0.05 ADD KITCHEN SINK/POT FILLER 0.05 0 1 1 0.05 KITCHEN/EFF. 0.15 0 0 0 BAR/HAND SINK 0.05 0 0 0 ICE MACHINE 0.05 0 1 1 0.05 WASHER 0.10 0 1 1 0.1 LNDRY/UTIL. SINK/DOG WASH 0.05 0 1 1 0.05 1st HOSE BIB 0.20 0 1 1 0.2 2nd HOSE BIB 0.10 0 1 1 0.1 ADD HOSE BIB 0.05 0 1 1 0.05 HOT TUB/@100 GAL 0.02 0 0 0 0 ADD LANDSCAPE/ 100 SQ FT 0.01 0 0 0 POOL/ 1000 GAL/YEAR ROUND 0.02 0 0 0 0 TOTAL ECU COUNT _ 0 1.92 INCREASE IN ECU COUNT DUE TO REMODEL 1.92 TOTAL DEVELOPMENT REVIEW FEE $2,269.06 *Note: If the number of existing fixtures that you provide in column A differs from the number in the Utilities Department's records, the Department will revise those numbers during its review of your permit. As a result these fees may change. RECEIVED 11/02/2017 ASPEN BUILDING DEPARTMENT