Loading...
HomeMy WebLinkAboutFile Documents.210 S 1st St.0281.2017 (38).ARBK l PERMIT NUMBER: ADDRESS: 2COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFADAVIT THE Cm OF ASPEN 'AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I,the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments.These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor,for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official,the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings,tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees,trash removal, and cleaning are not included. 1/4 i I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. la erstand that this document is a public document. Owner Signature: ,•� � /7 _ ,.�—=—' Date: o-5-/7 Owner Printed Name,' JOi/N lay h /4A nsA/olzie L%ti" or, Authorized Agent Signature: Date: Authorized Agent Printed Name: CITY OF ASPENAugustzol7 130 S. GALENA ST ASPEN, C0/8)164.J ASPEN BUILDING DEPARTMENT A B C D E 1 210 ESTIMATED COSTS DIVISION QTY COST 2 3 ASBESTOS ABATEMENT 2.10 SF ALLOW 0.00 4 TREE REMOVAL 2.15 SF ALLOW 0.00 5 DEMOLITION 2.20 SF ALLOW 0.00 6 EARTHWORK 2.20 SF ALLOW 50,000.00 7 FOUNDATION/EARTH RETENETION 2.45 SF ALLOW 75,000.00 8 LANDSCAPING(ALLOWANCE) 2.90 SF ALLOW 50,000.00 9 CONCRETE 3.30 SF ALLOW 150,000.00 10 STONE AND MASONRY 4.40 SF ALLOW 0.00 11 STRUCTURAL STEEL 5.10 SF ALLOW 100,000.00 12 ORNAMENTAL METALS 5.70 SF ALLOW 30,000.00 13 FRAMING AND WOOD SIDING 6.10 SF ALLOW 200,000.00 14 TIMBERS 6.13 SF ALLOW 0.00 15 CARPENTRY MATERIALS&HANDLING 6.20 SF ALLOW 200,000.00 16 ARCHITECTURAL MILLWORK 6.40 SF ALLOW 125,000.00 17 WATERPROOFING 7.10 SF ALLOW 50,000.00 18 INSULATION 7.20 SF ALLOW 60,000.00 19 ROOFING 7.30 SF ALLOW 50,000.00 20 WOOD DOORS 8.20 SF ALLOW 75,000.00 21 GARAGE DOOR 8.30 SF ALLOW 2,000.00 22 GLASS AND GLAZING 8.60 SF ALLOW 250,000.00 23 DOOR HARDWARE 8.70 SF ALLOW 30,000.00 24 INTERIOR GLASS 8.80 SF ALLOW 18,000.00 25 DRYWALL, METAL FRAMING&PLASTER 9.25 SF ALLOW 105,000.00 26 TILE AND SLAB COUNTERTOP SURFACES 9.30 SF ALLOW 100,000.00 27 WOOD FLOORING 9.50 SF ALLOW 95,000.00 28 CARPET 9.70 SF ALLOW 15,000.00 29 PAINTING 9.90 SF ALLOW 150,000.00 30 FIREPLACES 10.30 SF ALLOW 10,000.00 31 BATH ACCESSORIES 10.80 SF ALLOW 2,500.00 32 APPLIANCES 11.45 SF ALLOW 40,000.00 33 MOTORIZED SHADES 12.50 SF ALLOW 25,000.00 34 RADON MITIGATION 13.09 SF ALLOW 5,000.00 35 ELEVATOR 14.20 SF ALLOW 25,000.00 36 FIRE PROTECTION 15.30 0.00 37 PLUMBING 15.40 200,000.00 38 WATER TREATMENT OPTIONS 13.48 10,000.00 39 HVAC 15.50 125,000.00 40 TEMPERATURE CONTROLS 15.60 50,000.00 41 ELECTRICAL 16.05 200,000.00 42 LIGHTNING PROTECTION-NOT INCLUDED 16.50 0.00 43 PHONE AND DATA AND SOUND 16.70 45,000.00 44 SECURITY SYSTEM 16.75 15,000.00 45 JOB OPERATING COSTS 300,000.00 46 SUBTOTAL 3,032,500.00 RECEIVED 47 CONTRACTOR'S OVERHEAD AND FEE-8% 242,600.00 �,� �jJ 48 SUBTOTAL 3,275,100.00 49 LIABILITY INSURANCE-1.05%OF TOTAL EST. 49,127.00 11/0 2/2 017 ASPEN BUILDING DEPARTMENT A B C D E 50 TOTAL VALUATION 3,324,227.00 51 52 USE TAX=21.%ON CONSTRUCTION MATERIALS PURCHASED OUTSIDE OF CITY LIMITS= BY OWNER 53 PERMITS AND FEES=BY OWNER 54 HOUSING, PARKS SCHOOL FEES= BY OWNER RECEIVED 11/02/2017 ASPEN BUILDING DEPARTMENT RETAIN FOR PERMANENT FILE CITY OF ASPEN COMMUNITY DEVELOPMENT VALUATION ADJUSTMENT POLICY Property Address: 2/0 "C. 051 .t Permit Number: This valuation adjustment only applies to projects with a valuation greater than$100,000 calculated according to the applicable valuation policy.The owner or authorized agent must sign this understanding. City of Aspen Ordinance No. 55, Series of 1999 Chapter 8.16 adopts the 2003 International Residential Code (IRC)with certain amendments and Chapter 8.20 adopts the 2003 International Building Code(IBC)with certain amendments. The codes define building valuation as follows: IRC R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical,plumbing equipment and other permanent systems, including materials and labor. IBC 108.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor,for which the permit is being issued, such as electrical, gas, mechanical,plumbing equipment and permanent systems. If in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. (a) For the purpose of valuation adjustment a detailed fmal construction cost estimate, including the items referenced above, shall be considered for approval. (b) If a valuation adjustment is made the building plan review and building permit fees will be adjusted accordingly. (c) The City Use Tax Auditor will be notified of the adjustment and an audit will be performed. (d) Building plan review,building permit fee and use tax adjustments will be refunded or collected when the fmal reconciliation return is filed and a use tax audit is complete. (e) Any fees due must be paid. Unpaid fees may be subject to collection procedures of the City of Aspen. The undersigned has read this policy and will comply with its provisions as a basis for the issuance of a building permit for the project. 0017 JoMf / K / Owmr or authorized agent's signature Print Name Iv . 5 . / 7 Date RECEIVED E 11/02/2017 ASPEN BUILDING DEPARTMENT