Loading...
HomeMy WebLinkAboutFile Documents.1300 Riverside Dr.0309.2017 (11).ARBK I IC Hearth Products Controls Co Deck Insulation Kit — Instructions (FPI-DECK20SQ, FPI-DECK39SQ) TA WARNING: FOR OUTDOOR USE ONLY Installing a Fire Pit on Combustible Material Fire Pit Insert Combustible Material Basalt Material Brick Payers Gas Supply Line A WARNINGS A Items Included in Kit: • Always ensure no gaps to prevent any 1) Basalt Material&Instructions possible leakage onto decking surface. **Brick Pavers not included—these can be • Do not recess fire pit below the deck surface. found at local building supply stores. • Do not block any enclosure ventilation holes. Tools Needed: • Brick Pavers must be a minimum of 2"thick 1) Scissors or Cutting Knife (height). 2) Measuring Tape • Always wear gloves and protective eyewear. Fire Pit Enclosure Construction: 1) Refer to"Deck Insulation Kit—Install"on the last Inside Fire page for enclosure height&venting requirements. Pit Perimeter 2) Take measurements of the inside of the -- enclosure of the fire pit. 3) Install brick pavers on the inside of the -�- enclosure. Start with laying brick pavers around the supply line. Use one of the following methods: a. Drill hole in brick paver slightly larger Supply than the supply line and install paver Line Paver#1 over supply line. See Fig.l. with Hole i. Finish laying brick pavers until Fig. 1 RECEIVED they can no longer fit. 05/04/2018 Rev. 2 700-FPA 7/13/2017ASPEN BUILDING DEPARTMENT Inside Fire b. Follow brick pattern in Fig. 2. Pit Perimeter i. *Cugap brick pavthe r o fill the --- gap around the supply line. ii. Other patterns may be used. Fill MINEall gaps with brick pavers. Supply lieW Line *Gap in Between Fig. 2 Brick Pavers dini Inside Fire Pit Perimeter 4 4) Cut brick pavers to fill all outside -- gaps. See Fig. 3 and 4. I-n1, a. If ventilation holes for the fire pit are INE located on the bottom of the enclosure wall, �do not block-reference"Deck InsulationKit—Install"for instructions. (Fig. 3) Supply Outside For bowlsthat areshallow andhaveLine ‘1.1,1,111Wil,...41 �b. o a s a ow Gaps ventilation holes near the bottom,lay out Fig. 3 bricks around the bottom perimeter of the bowl and lay the basalt material on top of Inside Fire bricks. Then set your bowl on top of basalt. Pit Perimeter (Fig.4) - Supply Line Fig.4 5) Using the measurement of the inside of the fire Basalt Material(Square) pit from Step 1, add 1"to each dimension and draw on the basalt material. See Fig. 5. 6) Measure the location of the supply line in relation Inside diameter to the inside perimeter of the fire pit. _------ of fire pit+1" 7) Transfer this supply line measurement to the Basalt material by drawing an"X". See Fig. 5. 8) The"X"should be no larger than the diameter of the supply line for a tight fit. 9) Using scissors or cutting tool, cut along the lines from Step 4 and 6. Discard scrap pieces. ,' I ---- -" RECEIVED Fig. 5 05/04/2018 Rev. 2 700-FPA 7/13/2017ASPEN BUILDING DEPARTMENT 10) With the Aluminum side UP, insert the Basalt material over the supply line. Push the Basalt material all the way down until it rests on top of • the brick pavers. See Fig. 5. Note: Check to ensure there are no gaps around the supply line. �I Basalt- Aluminum Side UP Fire Bowl Installation- Copper or Concrete: Please refer to"Deck Insulation Kit—Install"drawing • on the last page. Fig. 5 General Information: • For larger fire pits, use multiple pieces together of the Basalt materials following the same construction principles from this manual. • It is recommended that the entire bottom of the inside of the fire pit be covered with the brick Pavers and basalt material. There is a minimum of 1' radius of basalt material from the supply line. The entire bottom of the fire pit must still be covered with the pavers to ensure they stay in place. • For smaller or narrower fire pits that are less than 2' wide on the inside, cut the basalt material 1" longer than the width of the inside of the fire pit while maintaining minimum 2' for the length. • For additional information on installing fire bowls and construction for combustible deck systems, see "Deck Insulation Kit—Install" drawing on the last page. • For Copper and concrete fire bowls, refer to "Deck Insulation Kit—Install" drawing on the last page. • Always ensure the decking material will allow for the additional weight of the fire pit. RECEIVED 05/04/2018 Rev. 2 700-FPA 7/13/2017ASPEN BUILDING DEPARTMENT N> f § CV § E > ] as 0. § _ U) m J co c (jk _ ■ W N �� / _ c. kk ( � ° t E� — O cow: � ■ 22 @ r ;) - - m , 6 Ilir �_ z ■ 0,k` /\f ¥_ =�6 ir]/ & CO mm cn ± k■ 0. b l §ƒ re W ) = i\ LI �o MQ k �» 0\ » � . co )a Iz ¥ 0 z �> \ \ 1 \ 1 0 k < ( E= o ' @! — z cc \\ \ _ z e \ m.0LI- CO - 0 { o 4 k o 0 i m(0 \ /6 s I« e>. °$ - In' ff # ) E = ` Ec /§ % , @ §«• b .{ §§ § §2 UI !;I11ii ocUt ii_, m§\ ou k§k --% I - 3 �22- , \ QU_ ,f jj\o I 0 z \! . E kk 7 ° e 2g.2 p I ) f«f2� zTa/ a . - ■ _ " �E %. \ 2 Jc2E \\ u @s J )\)§5m82k ƒ)I«w�§/££_ « RECEIVED 05/04/2018 Rev. 2 700E23 713%017SPEN BUILDING DEPARTMENT O1m 0) A w Ni0 .co W CV Um _ro E y7 J Um m mL (13 o o c> E E >cm c> _ro E � 0 C O ] "C n N C O E N ro 4� 0 E E -2 8 8. E :c a c 2 Cl) m m C co a• > co m .: 7 E a 0 2 X N.m. ro w 71)U X N m C y C 1] V m E W LLEE m - imam LLEE m .200' ill -2=-8a 3 / a E m 0 C (c �, 0 w N o a nro Q _ �'� cc _ N cc o• an = .. c o e/ co 0 he z CCD y W C ti5 o vro:- ° ; co N ii co co v�o c 3 o 3 1 O V) '� z U on W a U t Ca • 0 11J V m CC 0 n N m E LL m .4 CI m8• E N E 7 > w 43 N E a c tiv_ NQ < E 7 •c O W Y m N j a jV N NE 'E aa'i a�i� o c0 00-o a To W EC 0 m a 3 0i a'5 y E o f:_ s 0..t_.. NE0-E `a < y= E 0 O E caccE Z w —� aoE 0 a C w ��. 0 N 2 A m ro o N .gym it a mL C Z C m ' 4) % U Z > N 0 2 CC CoO E E 1.C N O O 7 E n U C .. O w 12 m E c m o w > N 3 Z Y O C_ E N.- > 3 U Q InA .O m < w C7 ro m co$ O 2 Q LL d wEE mro CamD- m a o o . a U m 0 a j d Iro�v co15 o a aas m .2 o ` N p > N C o9 -22 O W 7 cn 0 m N c 2 fn d cr > a) 7 C m 7 n0) O N m p N >. S G) rn °_" °_ E L al _ (n N o C 0 O �w V WLL U H E N =Toa) •O 20• wain w m ..o o m.R o o` 30 C U mN mN fnfn .0Ua ON L LLN > ' 7 ma Nc Nc .CYY ccw_ Ei,� o0 O m E U N ro N m C N N m C >w w p ro g N^p C O O o mom mro m �oE co Oir) O �I' 7 CroNNm dEm� zaa -a)coact �lp ma -O". 0. W a) lL 0-O)O LL 0'M d LL LL C O co Q>. m W n Q 2mNme'Cmm`C O o N C m N ro A N ro d 8arn'tENrn'E.E 1- a Em� mmi O ' C > C C > ▪ W m -0Y m � N � O O LL O 0 m> O C E >O C . m c E E m o m 5 m o m v c E :ooa-boa -p m W ) 0 W.0 o m N n O -70 co N y N N a s a,-g..t L E 2 o m E O U a ' O 5E �� m mE• U m= aE Y ` o E Um LL(n N E p E RECEIVED 05/04/2018 Rev. 2 700-FPA 7/13/2017ASPEN BUILDING DEPARTMENT