Loading...
HomeMy WebLinkAboutFile Documents.743 Cemetery Ln.0011.2018 (59).ARBK Residential Ventilation Balance Calculation Project Name: 743 Cemetery Lane Residence Project Number: 17154 Date: 12/6/2018 Nom. Intake Sub-total Equipment with O.A. Intake QtY Airflow Airflows FC-4 1 150 150 FC-5 1 150 150 FC-6 1 120 120 Intake Building Totals 420 Equipment with Exhaust Nom. Exhaust Sub-total (must operate when O.A. QtY Airflow Airflows equipment is operating) EF-1 7 50 350 Exhaust Building Totals 350 Balance Tolerance % 20 03/14/2019 FOR000ECUMJ NCE justinh RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT