Page Label:Grade-2 Temporary Micropile and Ground Nail'
Walls Locations Please depict excavation limits
,,}�r Author:mikeh on east side of excavation to
salsa, "°"" Date: 1/29/2018 8:46:13 AM ensure it is out of the drip lines
O.� d�9 ..aa of existing trees. If it is in the drip
°-s° `°°m'^' File Name:B-Excavation Earth Retention Plan
line,please obtain approval from
Set.743-745Cemetery.2018.01.pdf pp
Parks Department to excavated
within drip lines.
•