HomeMy WebLinkAboutFile Documents.1300 Riverside Dr.0309.2017 (30).ARBK Markup Summary
basement site plan (4)
I Page: basement site plan
1 tree protection fencing required
1. II- Author: davidr
Ilk 11 File Name: PlanSet.1300Riverside.2017.12.pdf
Vie
--_ /N. .. , TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY
THE CONTRACTOR.
-7- "ra., __-,....411r
Page: basement site plan
Author: davidr tree protection fencing required
File Name: PlanSet.1300Riverside.2017.12.pdf
ic....-.
TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY
THE CONTRACTOR.
Page: basement site plan tree protection fencing required
I Author: davidr
,/ '° a /I File Name: PlanSet.1300Riverside.2017.12.pdf
/I
ii�oroaoa TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY
'sA I THE CONTRACTOR.
I
1-----
1
„�I °°° °, w , I Page: basement site plan
4— tree protection fencing required
I Author: davidr
*;� File Name: PlanSet.1300Riverside.2017.12.pdf
,, I
T m I TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY
/�"' THE CONTRACTOR.
Wig � I
'Il!m I
V_SURVEY (17)
I 1 Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T16
_____
WE REVIEWED THAT A COUPLE OF THE NORTH SOIL NAILS EXTEND INTO THE
T17DRIP LINE OF THE ASPEN TREES A COUPLE FEET. THE NAILS WILL BE 4' -6'AND
WE FEEL WILL NOT NEGATIVELY IMPACT THE TREES.
RECEIVED
05/04/2018
ASPEN
BUILDING DEPARTMENT
I sPage:
T9 V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
WE REVIEWED THAT A COUPLE OF THE NORTH SOIL NAILS EXTEND INTO THE
DRIP LINE OF THE ASPEN TREES A COUPLE FEET. THE NAILS WILL BE 4' - 6'AND
TiWE FEEL WILL NOT NEGATIVELY IMPACT THE TREES.
i
I 1V}{ Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T2.9
T20
I Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T9
I Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
110
Til
Pag e:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
Tt
Tl _5 v
RECEIVED
05/04/2018
ASPEN
BUILDING DEPARTMENT
Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T31
1 I 2
Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T.3
T4
Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
Ilk
T3
7--......
I Page:V_SURVEY
Author: davidr
// File Name: PlanSet.1300Riverside.2017.12.pdf
IC
I 5U Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T31
T32
RECEIVED
05/04/2018
ASPEN
BUILDING DEPARTMENT
Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T19
T4
T1 T2
Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T�
I 1i
T14
Page:V_SURVEY
•J Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
T15
J Page:V_SURVEY
T 1 5 Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
�• C
Page:V_SURVEY
Author: davidr
File Name: PlanSet.1300Riverside.2017.12.pdf
r
� 0
RECEIVED
05/04/2018
ASPEN
BUILDING DEPARTMENT
AuthPage or::V_SURVEYdavidr
' File Name: PlanSet.1300Riverside.2017.12.pdf
T10
RECEIVED
05/04/2018
ASPEN
BUILDING DEPARTMENT