Loading...
HomeMy WebLinkAboutFile Documents.1300 Riverside Dr.0309.2017 (30).ARBK Markup Summary basement site plan (4) I Page: basement site plan 1 tree protection fencing required 1. II- Author: davidr Ilk 11 File Name: PlanSet.1300Riverside.2017.12.pdf Vie --_ /N. .. , TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY THE CONTRACTOR. -7- "ra., __-,....411r Page: basement site plan Author: davidr tree protection fencing required File Name: PlanSet.1300Riverside.2017.12.pdf ic....-. TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY THE CONTRACTOR. Page: basement site plan tree protection fencing required I Author: davidr ,/ '° a /I File Name: PlanSet.1300Riverside.2017.12.pdf /I ii�oroaoa TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY 'sA I THE CONTRACTOR. I 1----- 1 „�I °°° °, w , I Page: basement site plan 4— tree protection fencing required I Author: davidr *;� File Name: PlanSet.1300Riverside.2017.12.pdf ,, I T m I TREE PROTECTION FENCING IS NOTED ON REVISED CMP PROVIDED BY /�"' THE CONTRACTOR. Wig � I 'Il!m I V_SURVEY (17) I 1 Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T16 _____ WE REVIEWED THAT A COUPLE OF THE NORTH SOIL NAILS EXTEND INTO THE T17DRIP LINE OF THE ASPEN TREES A COUPLE FEET. THE NAILS WILL BE 4' -6'AND WE FEEL WILL NOT NEGATIVELY IMPACT THE TREES. RECEIVED 05/04/2018 ASPEN BUILDING DEPARTMENT I sPage: T9 V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf WE REVIEWED THAT A COUPLE OF THE NORTH SOIL NAILS EXTEND INTO THE DRIP LINE OF THE ASPEN TREES A COUPLE FEET. THE NAILS WILL BE 4' - 6'AND TiWE FEEL WILL NOT NEGATIVELY IMPACT THE TREES. i I 1V}{ Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T2.9 T20 I Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T9 I Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf 110 Til Pag e:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf Tt Tl _5 v RECEIVED 05/04/2018 ASPEN BUILDING DEPARTMENT Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T31 1 I 2 Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T.3 T4 Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf Ilk T3 7--...... I Page:V_SURVEY Author: davidr // File Name: PlanSet.1300Riverside.2017.12.pdf IC I 5U Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T31 T32 RECEIVED 05/04/2018 ASPEN BUILDING DEPARTMENT Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T19 T4 T1 T2 Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T� I 1i T14 Page:V_SURVEY •J Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf T15 J Page:V_SURVEY T 1 5 Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf �• C Page:V_SURVEY Author: davidr File Name: PlanSet.1300Riverside.2017.12.pdf r � 0 RECEIVED 05/04/2018 ASPEN BUILDING DEPARTMENT AuthPage or::V_SURVEYdavidr ' File Name: PlanSet.1300Riverside.2017.12.pdf T10 RECEIVED 05/04/2018 ASPEN BUILDING DEPARTMENT