IRRIGATION PLAN (MAIN LEVEL) (5)
Page: IRRIGATION PLAN (MAIN LEVEL)
Author: mollys Need a signed statement from a
Date: 1/23/2018 2:41:07 PM qualified irrigation designer
specified in section 6.3.h of the
Need a signed statement from a qualified water efficiency standards.
irrigation designer specified in section Hines Irrigation to provide signed,
6.3.h of the water efficiency standards.
qualified irrigation designer statement.
F)=6789 SF Page: IRRIGATION PLAN (MAIN LEVEL) Please indicate application rate
Author: mollys (inches per hour), and design
Date:e: 11/23/3/20018 1:52:58 PM
operating pressure(psi)for each
Please indicate application rate irrigation zone. (WEL Standards
(inches per hour),and design
operating pressure(psi)for each section 6.3.f.)
irrigation zone.(WEL Standards
section 6.3.f.) Hines Irrigation to provide application rate and
operating pressure to each applicable zone.
Page: IRRIGATION PLAN (MAIN LEVEL)
Author: mollys Are the sod areas watered with
GE"°/DETAILS: SAM or PRS?Above notes
er ,Peb�6sd1�ppble M1eckyalye maall�bydcen tlplpmber Date: 1/23/2018 11:51:44 AM
indicate PRS.
at of memamcal room ae lowretl on play,1�coppar w.�eaio�.�s Psr:wtl46spsr e
irecore w/quick coupler for wln[ebzing syrtem re Me sotl areas
•'60 PSI Poly ds�AeoVe� apr Hines Irrigation to specify PRS40 for MP rotator
"at
e
Pas
rip Poly spray nozzles.
ainbird 1606 SAM
;s-12'.Poinbira 1612 SAM
RainbiM SAM P0.5-cM1eck valve M1oltls water up co 1C'of elevation.Pre
mis[Ing antl fogging,rertdciz water loss up[o)0%If nozzle Is removeEzorfe
n BIM PR Single Outlet Emitter Pressure Compensating T„reatletl Flow-Flow Bubblers
reatletl inlet.
II Page: IRRIGATION PLAN (MAIN LEVEL) Please coordinate valve
aGPM PMI .: Author: mollys Date: 1/23/2018 2:14:20 PM nomenclature with hydrozone
nomenclature for ease of
GPM
P,eaaepppM�a,a � reference.
�atare
n n�ro=ona
e IalpreMr � ill I Ws Hines Irrigation to coordinate hydrozone
bifill GPM ease of referanw.
with zone nomenclature
le
0
aloe.Installed by licensed plumber
Page: IRRIGATION PLAN (MAIN LEVEL)
Author: mollys Please note an irrigation audit
Date: 1/23/2018 2:42:21 PM and maintenance schedule and
irrigation scheduling plan will be
Pleasmaintenote anances irrigation auditit and required prior to inspection.
maintenance schedule and irrigation
scheduling plan will be required prior to Please refer to sections 6.5-6.9
inspection.Please refer to sections 6.5-
6.9 for more information. for more information.
Hines Irrigation to provide COA general
notes.
RECEIVED
07/02/2018
ASPEN
BUILDING DEPARTMENT
IRRIGATION PLAN (ROOF DECK) (1)
Page: IRRIGATION PLAN (ROOF DECK)
Author: mollys pleaee include details for
Date: 1/23/2018 2:17:10 PM installation of irrigation
components.
Hines Irrigation to provide irrigation
details,sheets IR2.0&IR3.0
LANDSCAPE LAYOUT (3)
Page: LANDSCAPE LAYOUT
Author: mollys 1. Please include plant list to
Date: 1/23/2018 2:16:23 PM ensure plants area appropriate
for hydrozone.
2. Include easements, pervious
new znn vs. impervious surfaces and
NEIGHBORING HOUSE
preserved exisitng trees.
Please see updated LS.2.0&LS.2.1 for detailed plant
list&impervious vs.pervious.
• Page: LANDSCAPE LAYOUT
�, Author: mollys Civil G&D plan indicates a ttiMdrywell here. Please include
•— E Date: 1/18/2018 1:53:31 PM
stormwater infrastructures that
will influence landscape designs
Updated LS.1.0 shows drywell locations,please reference
t r ., updated civil set in building permit set for further
DR.RIVERSIDE ' clarification on civil infrustrucure.
Page: LANDSCAPE LAYOUT
Author: mollys clearly mark existing vs.
Date: 1/23/2018 1:56:35 PM proposed trees.
clearly mark existing V eand evexd eve rg g
vs.proposed
trees.
stone ratan
wall Please see attached tree permit sheets:
LS.3.0(Survey showing existing trees)
and LS.3.1(newly proposed trees)
PLANTING PLAN (MAIN LEVEL) (2)
Page: PLANTING PLAN (MAIN LEVEL)
Author: mollys
Date: 1/18/2018 12:48:03 PM
Revised#4 from soil ammendment notes on
updated sheet LS.2.0 to refelect change below
RECEIVED
07/02/2018
ASPEN
BUILDING DEPARTMENT
Page: PLANTING PLAN (MAIN LEVEL)
Author: mollys The total soil depth shall have at
Date: 1/18/2018 12:52:19 PM least one to three percent(1-3%)
organic matter by volume.
(NOTE: If in turf, top soil should
be 6"and have 5%organic
matter by volume). In good
existing soils, dig and turn the
on1v9s °NJm n e11w� w�s�w see response above soils to three times the
dimension of the root ball.