Loading...
HomeMy WebLinkAboutFile Documents.1300 Riverside Dr.0309.2017 (46).ARBK WEL 1st Comments 01 .23.2018 IRRIGATION PLAN (MAIN LEVEL) (5) Page: IRRIGATION PLAN (MAIN LEVEL) Author: mollys Need a signed statement from a Date: 1/23/2018 2:41:07 PM qualified irrigation designer specified in section 6.3.h of the Need a signed statement from a qualified water efficiency standards. irrigation designer specified in section Hines Irrigation to provide signed, 6.3.h of the water efficiency standards. qualified irrigation designer statement. F)=6789 SF Page: IRRIGATION PLAN (MAIN LEVEL) Please indicate application rate Author: mollys (inches per hour), and design Date:e: 11/23/3/20018 1:52:58 PM operating pressure(psi)for each Please indicate application rate irrigation zone. (WEL Standards (inches per hour),and design operating pressure(psi)for each section 6.3.f.) irrigation zone.(WEL Standards section 6.3.f.) Hines Irrigation to provide application rate and operating pressure to each applicable zone. Page: IRRIGATION PLAN (MAIN LEVEL) Author: mollys Are the sod areas watered with GE"°/DETAILS: SAM or PRS?Above notes er ,Peb�6sd1�ppble M1eckyalye maall�bydcen tlplpmber Date: 1/23/2018 11:51:44 AM indicate PRS. at of memamcal room ae lowretl on play,1�coppar w.�eaio�.�s Psr:wtl46spsr e irecore w/quick coupler for wln[ebzing syrtem re Me sotl areas •'60 PSI Poly ds�AeoVe� apr Hines Irrigation to specify PRS40 for MP rotator "at e Pas rip Poly spray nozzles. ainbird 1606 SAM ;s-12'.Poinbira 1612 SAM RainbiM SAM P0.5-cM1eck valve M1oltls water up co 1C'of elevation.Pre mis[Ing antl fogging,rertdciz water loss up[o)0%If nozzle Is removeEzorfe n BIM PR Single Outlet Emitter Pressure Compensating T„reatletl Flow-Flow Bubblers reatletl inlet. II Page: IRRIGATION PLAN (MAIN LEVEL) Please coordinate valve aGPM PMI .: Author: mollys Date: 1/23/2018 2:14:20 PM nomenclature with hydrozone nomenclature for ease of GPM P,eaaepppM�a,a � reference. �atare n n�ro=ona e IalpreMr � ill I Ws Hines Irrigation to coordinate hydrozone bifill GPM ease of referanw. with zone nomenclature le 0 aloe.Installed by licensed plumber Page: IRRIGATION PLAN (MAIN LEVEL) Author: mollys Please note an irrigation audit Date: 1/23/2018 2:42:21 PM and maintenance schedule and irrigation scheduling plan will be Pleasmaintenote anances irrigation auditit and required prior to inspection. maintenance schedule and irrigation scheduling plan will be required prior to Please refer to sections 6.5-6.9 inspection.Please refer to sections 6.5- 6.9 for more information. for more information. Hines Irrigation to provide COA general notes. RECEIVED 07/02/2018 ASPEN BUILDING DEPARTMENT IRRIGATION PLAN (ROOF DECK) (1) Page: IRRIGATION PLAN (ROOF DECK) Author: mollys pleaee include details for Date: 1/23/2018 2:17:10 PM installation of irrigation components. Hines Irrigation to provide irrigation details,sheets IR2.0&IR3.0 LANDSCAPE LAYOUT (3) Page: LANDSCAPE LAYOUT Author: mollys 1. Please include plant list to Date: 1/23/2018 2:16:23 PM ensure plants area appropriate for hydrozone. 2. Include easements, pervious new znn vs. impervious surfaces and NEIGHBORING HOUSE preserved exisitng trees. Please see updated LS.2.0&LS.2.1 for detailed plant list&impervious vs.pervious. • Page: LANDSCAPE LAYOUT �, Author: mollys Civil G&D plan indicates a ttiMdrywell here. Please include •— E Date: 1/18/2018 1:53:31 PM stormwater infrastructures that will influence landscape designs Updated LS.1.0 shows drywell locations,please reference t r ., updated civil set in building permit set for further DR.RIVERSIDE ' clarification on civil infrustrucure. Page: LANDSCAPE LAYOUT Author: mollys clearly mark existing vs. Date: 1/23/2018 1:56:35 PM proposed trees. clearly mark existing V eand evexd eve rg g vs.proposed trees. stone ratan wall Please see attached tree permit sheets: LS.3.0(Survey showing existing trees) and LS.3.1(newly proposed trees) PLANTING PLAN (MAIN LEVEL) (2) Page: PLANTING PLAN (MAIN LEVEL) Author: mollys Date: 1/18/2018 12:48:03 PM Revised#4 from soil ammendment notes on updated sheet LS.2.0 to refelect change below RECEIVED 07/02/2018 ASPEN BUILDING DEPARTMENT Page: PLANTING PLAN (MAIN LEVEL) Author: mollys The total soil depth shall have at Date: 1/18/2018 12:52:19 PM least one to three percent(1-3%) organic matter by volume. (NOTE: If in turf, top soil should be 6"and have 5%organic matter by volume). In good existing soils, dig and turn the on1v9s °NJm n e11w� w�s�w see response above soils to three times the dimension of the root ball. RECEIVED 07/02/2018 ASPEN BUILDING DEPARTMENT