HomeMy WebLinkAboutresolution.council.104-22RESOLUTION # 104
(Series of 2022)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN,
COLORADO, APPROVING A CHANGE ORDER TO THE CONTRACT
BETWEEN THE CITY OF ASPEN AND MURRAYSMITH, INC.
AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE
ORDER ON BEHALF OF THE CITY OF ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council a change order to
the professional services agreement for the engineering design for the Maroon
Creek Pipeline Rehabilitation Project, between the City of Aspen and
Murraysmith, Inc., a true and accurate copy of which is attached hereto as Exhibit
«A».
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves the change order
to the professional services agreement for the engineering design for the Maroon
Creek Pipeline Rehabilitation Project, between the City of Aspen and
Murraysmith, Inc., a copy of which is annexed hereto and incorporated herein, and
does hereby authorize the City Manager to execute said agreement on behalf of the
City of Aspen.
INTRODUCED, READ AND ADOPTED by the City Council of the City of
Aspen on the 25' day of October 2022.
MmEmo�—=
Torre, Mayor
I, Nicole Henning, duly appointed and acting City Clerk do certify that the
foregoing is a true and accurate copy of that resolution adopted by the City Council
of the City of Aspen, Colorado, at a meeting held, October 25th, 2022.
c
Nicole He ing, City Clerk
DocuSign Envelope ID: F8C 1 143E-4962-4E2C-93FF-8D3B577C5923
�, gSEE
►
CITY OFASPEN
General Information
Vendor
Change Order Number
Date of Issuance
Project Name
Change Order Form Revision 12/08/2021
Murraysmith, Inc.
001
August 5, 2022
Maroon Creek Pipeline Rehal
Project Number 51149
Project Completion Date December 31, 2022
Project Manager Erin Loughlin
COA Account Code 421.322.81200.52199.51 149
Change Order Form
Project Information
Description Of Service Engineering design services for Maroon Creek raw water line
rehabilitation from the headgate to the penstock of the
hydroelectric plant.
Description Of Change
Order
Contract Information
Additional cost -benefit analysis on pipeline rehabilitation
options, bid alternatives, preliminary environmental assessment,
and bidding support services. Cost -benefit analysis of
rehabilitation options and bid alternatives are anticipated to
improve the quality of bidding documents and to result in more
competitive bids received. Wetland mapping in accordance with
the U. S. Army Corps of Engineers (USACE) Nationwide Permit 3
(NWP 3) was determined to be required during original
contracted scope for environmental permitting. Bidding support
services by design engineer will assist with technical responses
to request for information (RFI) received during the bidding
process, as necessary, and provide comment and evaluation of
received bid packages based upon consultant's professional
experience and follow-up with bidder references.
Original Contract Amount 1$196,990
Previous Change Order(s) $0
Page 1 of 2
DocuSign Envelope ID: F8C1143E-4962-4E2C-93FF-8D3B577C5923
Change Order Amount
(If Over 50k Change Order
To Be Presented To Council
For Approval)
Final Contract Amount
(Including All Change
Orders)
Revised Completion Date
Signature
1. Contractor (Required)
2.
Project Manager
(Required)
3.
Department Head
(Required)
4.
Procurement Officer
(Required)
5.
City Attorney (Required
Based On Value Of
Thresholds)
6.
City Manager (Required
Based On Value Of
Thresholds)
Change Order Form Revision 12/08/2021
$47,965
$244,955
December 31.2022
h bidd
mtA- Murraysmith
Jai �ri—`
EOocusiQn.d by'.
J"VI
32]37E149E➢5457—
[af"a N.
2VMMt4MI9428,,.
Original contract, if applicable all other change orders, and vendor quote for requested
change order must be attached to this document.
For additional information: See Procurement Policy "Change Orders And Add Services
Request" (page 30).
Page 2 of 2
DocuSign Envelope ID: F8Cl l43E-4962-4E2C-93FF-8D3B577C5923
EXHIBIT A
SCOPE OF WORK
MAROON CREEK PIPELINE REHABILITATION — FINAL DESIGN,
PERMITTING & BIDDING
CITY OF ASPEN
Project Background
The City of Aspen (City) contracted Murraysmith in June 2020 to provide engineering design
services up to 90% design documents for the rehabilitation of approximately 7,200 lineal feet of
the Maroon Creek Pipeline, part of the City's critical raw water supply infrastructure. Engineering
services are required to progress the pipeline rehabilitation design from 90% design documents
through conformed construction documents and support the City through the bidding process.
This scope outlines the additional services to the Maroon Creek Pipeline Rehabilitation
Professional Services Agreement, City of Aspen Contract No. 51149-2020, and has been separated
into two tasks for clarity that are described in detail below.
Scope of Services
Consultant will perform the following services.
Task 1— Project Management and Coordination
1.1 Technical Presentations
Murraysmith will coordinate with the City's project team members to deliver technical
presentations to City staff and other stakeholders regarding technical subject matter related to
design and critical discussion items and coordination points. The purpose of the technical
presentation is to engage in depth discussions regarding rehabilitation technologies and provide
a forum for City staff members to gather information that would be necessary for future meetings
with City Council and City residents.
1.2 Design Review Meetings
This task includes up to two meetings to discuss design progress and solicit feedback from the
City's project team. Murraysmith will prepare a current set of design plans and meeting agenda
highlighting the discussion items for each meeting.
City of Aspen MURRAYSMITH Maroon Creek Pipeline Rehabilitation:
May 2022 1 Final Design, Permitting & Bidding
DocuSign Envelope ID: F8C 1 143E-4962-4E2C-93FF-BD3B577C5923
Task Deliverables
■ Monthly project invoices and progress reports
• Meeting agendas and minutes
Assumptions
■ Meeting agendas will be delivered two business days prior to meetings.
■ Meeting minutes will be delivered within one week after meetings have been held.
■ Presentations and meetings may be held in person, virtually, or a combination thereof
depending on the City's preference.
Task 2 — Cost Analysis and Phased Bid Documents
2.1 Cost Analysis
Murraysmith has prepared a cost analysis comparing the selected rehabilitation technology to the
alternative options of continued point repairs and allowing the waterline to age until total failure.
Elements of the cost analysis has been included and submitted to City staff.
2.2 Phase I Bid Documents —Access Point Installation
Murraysmith will prepare Phase I Bid Documents, to include the installation of several manholes
along Maroon Creek Pipeline that will allow adequate man access for pipeline repairs and
rehabilitation. Finalizing the location and number of access manholes will require coordination
with Pitkin County to limit the risk of potential traffic hazards within the roadway. The Phase I Bid
Documents will also include the installation of a new segment of waterline that crosses Maroon
Creek.
2.3 Phase 11 Bid Documents — Waterline Rehabilitation
Murraysmith will prepare Phase II Bid Documents, to include the installation of UV -cured in place
pipe (UV-CIPP) to rehabilitate approximately 7,000 linear feet of the Maroon Creek Pipeline, from
the headgate at Maroon Creek to a tee that divides flow between the City's Water Treatment Plant
and the Maroon Creek Hydroelectric Plant.
Task Deliverables
■ Phase I Bid Documents, including plans and specifications
■ Phase II Bid Documents, including plans and specifications
■
Assumptions
■ Life Cycle Cost Analysis provided in 2021, no further documentation will be regl,ired.
City of Aspen MURRAYSMITH Maroon Creek Pipeline Rehabilitation:
May 2022 2 Final Design, Permitting & Bidding
\\ad msa-ep.com\Portland\PDX—BD\Clients\Aspen, City of, CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline -Additional Services to Phase Bid\Murraysmith - Maroon Creek
Rehab - Final Design Services.docx
DocuSign Envelope ID: F8C 1 143E-4962-4E2C-93FF-8D3B577C5923
Task 3 — Permitting and Environmental Services
Activities
3.1 USACE Section 404 Authorization
Under the guidance of the Murraysmith project team, SWCA will submit an authorization request
to the U.S. Army Corps of Engineers (USACE) Grand Junction Regulatory Office for Clean Water Act
Section 404 (Section 404) authorization for the rehabilitation of the Maroon Creek Pipeline. SWCA
will prepare a wetland delineation report documenting field delineations of wetland and non -
wetland waters at the pipeline crossing of Maroon Creek. SWCA will also prepare a pre -
construction notification (PCN) requesting authorization that the permit meets requirements of
Nationwide Permit (NWP) 3: Maintenance or NWP 58: Utility Line Activities for Water and Other
Substances. The PCN will include the cultural resources assessment report prepared under Task
3.2.
3.2 Cultural Resources Assessment and Report
Murraysmith will provide necessary oversight to SWCA in the preparation of a cultural resources
assessment report to document project compliance with NWP wetland and non -wetland water
impacts (Condition 20) associated with the pipeline crossing of Maroon Creek. The assessment will
include a desktop review and field survey methods to assess the pipeline crossing and a 50-foot
buffer of the impact area.
Task 3.2 may be delayed until the USACE determines that the cultural resources assessment is
necessary to complete the authorization process. However, due to the length of the review period,
this approach could delay the authorization issuance and therefore construction schedule. It is
recommended that Task 3.2 is delayed only if the City decides that the anticipated construction
schedule is not critical.
3.3Pitkin County Floodplain Permitting
Murraysmith will prepare all documentation required for Pitkin County Floodplain Permit
Application, including Section 404 Permit documentation, a No -Rise Certificate, drainage and
erosion control plans, and mapping.
3.4 FERC Coordination and Memo
Murraysmith will prepare a memorandum for submittal to the Federal Energy and Regulatory
Commission (FERC) outlining the information gathered during the other activities under Task 3 in
pursuit of a Categorical Exclusion (CE) for the work performed under the National Environmental
Policy Act (NEPA).
City of Aspen MURRAYSMITH Maroon Creek Pipeline Rehabilitation:
May 2022 3 Final Design, Permitting & Bidding
\\ad.msa-ep.com\Portland\PDX_BD\Clients\Aspen, City of, CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline -Additional Services to Phase Bid\Murraysmith - Maroon Creek
Rehab - Final Design Services.docx
DocuSign Envelope ID: F8C1143E-4962-4E2C-93FF-8D3B577C5923
Task Deliverables
• Wetland Delineation Report
■ Desktop assessment of federally listed threatened and endangered species
■ Cultural Resources Assessment and Report
■ Pitkin County Floodplain Permit Application
■ Memorandum to FERC
Assumptions
■ The Wetland Delineation Report will include a narrative description of methods and
results, detailed mapping, photographs, and wetland determination data forms.
■ USACE authorization will be received within 45 days, pending review and input by the
Colorado Office of Archaeology and Historic Preservation (OAHP).
• This task does not include mitigation design or onsite meetings with USACE.
■ This task does not include coordination related to the preparation of an environmental
assessment or environmental impact statement. If FERC or USFW requires these submittals
for a categorical exclusion these services will be provided under a separate scope of work.
■ The Pitkin County Floodplain Permit will not require hydraulic or hydrologic modeling or
the submittal of a Conditional Letter of Map Revision (CLOMR).
Task 4 — Final Design and Bidding Support
Activities
4.1 Prebid Meeting
Murraysmith will organize a pre -bid meeting to provide prospective bidders with an open forum
to discuss questions and design considerations with the design team and City staff. This meeting
will be held at least one week after bid documents have been advertised and at least one week
prior to the deadline for bid submittals. Murraysmith will attend the prebid meeting in person and
will also provide accommodations for virtual attendees.
4.2 RF/ Responses and Addenda
Murraysmith will document questions received via email and during the prebid meeting along with
any answers and relevant discussion and prepare a Request for Information (RFI) for distribution
to all attendees of the prebid meeting. RFI will be issued within one week of the meeting and
within one week of the deadline for questions. If design clarifications are required, Murraysmith
will prepare and issue addenda to the contract documents.
City of Aspen MURRAYSMITH Maroon Creek Pipeline Rehabilitation:
May 2022 4 Final Design, Permitting & Bidding
\\ad.msa-ep.com\Portland\PDX BD\Clients\Aspen, City of, CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline - Additional Services to Phase Bid\Murraysmith - Maroon Creek
Rehab - Final Design Services.docx
DocuSign Envelope ID: F8C1143E-4962-4E2C-93FF-8D3B577C5923
4.3 Conformed Construction Documents
Murraysmith shall compile all addenda and issue a conformed set of construction documents,
including design plans and specifications, for issuance to the winning bidder as selected by the
City.
Task Deliverables
■ Prebid meeting agenda and sign -in list
■ RFIs and Addenda, as necessary
■ Conformed Construction Documents
Assumptions
■ The prebid meeting agenda will be delivered two business days prior to the meeting, and
meeting minutes will be delivered within one week after the prebid meeting.
■ RFI will be issued within one week of the meeting and within one week of the deadline for
questions.
Budget
Payment will be made at the Billing rates for personnel working directly on the project, which will
be made at the Consultant's Hourly Rates, plus Direct Expenses incurred. Billing rates are as shown
in the Fee Estimate attached.
Direct Expenses
Expenses incurred in-house that are directly attributable to the project will be invoiced at actual
cost. These expenses include the following.
Computer Aided Design and Drafting
$18.00/hour
GIS and Hydraulic Modeling
$10.00/hour
Mileage
Current IRS Rate
Postage and Delivery Services
At Cost
Printing and Reproduction
At Cost
Travel, Lodging and Subsistence
At Cost
City of Aspen MURRAYSMITH Maroon Creek Pipeline Rehabilitation:
May 2022 5 Final Design, Permitting & Bidding
\\ad msa-ep.com\Portland\PDX_BD\Clients\Aspen, City of, CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline -Add I tion a I Services to Phase Bid\Murraysmith - Maroon Creek
Rehab - Final Design Services.docx
m
a
r
vi .n
m •vi w w .n �
in �n
.gn
y
wW wW
y�
�
Win•
n
ti a a ed
� Y
wN•n'1A N WN W
w,y
H
W }
�x
n
R
v
a
Pn
-; ,-i ry d A ri N rri I
f ryW
w V
I
w N
�+Y
w
d
C
D
y A
C
3
M
b
D. H O u O t C
a J U a
2.2
O
+1 •i N TI *! fv M en � m
1� H Fp F• F�� }-
H F F