Loading...
HomeMy WebLinkAboutFile Documents.824 E Durant Ave.0047.2018 (2).ARBK 0047-2018-ARBK_BuildingComments_1 Response Comments 06.05.2018 (in Blue) plans.pdf(12) I Page:A103 UPPER LEVEL PLAN EXISTING AND DEMO a File Name: plans.pdf Exterior fra ing cavities that 4v-v Subject: Fill existing cavity becom exposed during pi Author: nickt cons ction must be filled with ,_ J' i ation (2015 IECC ° r = ,_ Color: • 503.1.1). Note this requirement 'b 6 6 6 on the plans. See sheet A103 with added notation Q� "dyl •,� Page:A111 MAIN LEVEL PLAN PROPOSED Deg . plan indicates that are •1 ..'® I File Name: plans.pdf r:.lacing the entry door 0 Subject: PlanCheck o--- °w-, g; -0 -delight. Note the requirement Author: nickt o- "` Color: ■ at it must be safety glazed an tigJi 0--_-1-----___- I -0 ave a U factor of no greater b b b b b t an 0.28. (2015 IECC R402.1, oM F�wP,.Pao�,o The existing door and sidelights will be re-used. See corrected nota '•n on revised sheet A111. Page:A120 LOWER LEVEL REFLECTED CEILING PLAN File Name: plans.pdf Provide smoke detectors in halls Subject: PlanCheck outside bedrooms as we . Author: nickt o? Pq ?vs Color: ■ 'WV*:: See revised sheet A120 for added smoke detectors in the hallway o e of the bedrooms. "es e eee Page:A121 MAIN LEVEL REFLECTED CEILING PLAN File Name: plans.pdf Provide smoke ectors in halls Subject: PlanCheck outside be ms as well. r Author: nickt 7 'To Color: • See revised sheet A121 for added smoke detectors in hallways outside of the bedrooms. eae Page:A121 MAIN LEVEL REFLECTED CEILING PLAN 9? ° 4TT File Name: plans.pdf Provide CO detector + - • � 'ii Subject: PlanCheck bedrooms with fi aces. (Ord Author: nickt 40/2016) rgo. o = Color: ■ o- a0-__-a-- aaa_d See revised sheet A121 for added CO2 detectors in the hallw outside of the bedrooms. RECEIVED 06/05/2018 ASPEN BUILDING DEPARTMENT I Page:A411 ENLARGED STAIR SECTIONS Handrail ends must turn (2015 -;-t- -__-_ _-_— File Name: plans.pdf Subject: PlanCheck IRC R311.7.8.2 . ,Q Author: nickt ...,�„ , Color: ■ Ell -- a PAIL 0 STA See revised sheet A411 for revised handrail ends. Page:A420 FIREPLACE DETAILS ® File Name: plans.pdf You have not provi'-d any i . _.. Imo; .�- aw Subject: PlanCheck structural drawin... Isokern '11W __. -- fireplaces typic. y require the • ;: w == _� Author: nickt �'���i hearth and h::rth extension to i �-_-- =�� � Color: ■ ,n�IR. 3 be support_. by -- See revised sheet A420, added structural dwgs. S102&S103 non-combustible construction all _''''E_TF'e'''" o L''''"""SECT' o L''F°"" The Isokern model has been revised to the Fire Lite that can be the way . grade. Clearly ' supported by combustible framing. Manufactures information docum- t how you will comply. l tel ` included. Structural drawings indicate proposed assumptions Prov',.e manufacturer's install until existing framing can be confirmed after demolition ins ctions. Page:A501 ASSEMBLIES ',u File Name: plans.pdf Exterior framing vities that become expo d during - ._. Subject: Fill existing cavity Author: nickt construction ust be filled with ` � `' Color: ■ insulation 15 IECC R503.1.1 Note this requirement See revised sheet A501, detail C-2 for added notation. on the ns. - 1 _ e `-'6% Page: G102 GROSS AREA Q,.,,ems, Revise gross area d fire area �� c— File Name: plans.pdf plans to meal to the INSIDE Subject: Fire Area of exterior s per 2015 IBC b 66 , Author: nickt section . If there are any Color: ■ J-GROSS AREA 3 G PPERLEb exterio usable areas that are See revised sheet G102 with gross area revised to the cove d, include them as well. Q interior of the exterior wall framing. Covered section of the porch has also been indicated. elwa r.1 rfi l I.W, Page: M002 MECHANICAL SCHEDULES File Name: plans.pdf Provide a balanced whole house I' 'F 1 mechanical ventil. ion system t_ - 1 ti I -I 1 Subject: Balanced Whole House Ventilation Author: nickt complying with 'rdinance 40, I �' 11 f C'- Color: ■ 2016. Show t location of all equipment a,. intakes and See revised mechanical plans for clarification of the exhausts. I,dicate the rate of air ventilation system. 150 cfm total continuous ventilation is supplied . d exhausted. Indicate designed, calculation is now provided. OA pathway for method ,f operation and ventilators is shared with make-up air pathway for ECU-1. wheth: it is continuous or EA pathway is specified,termination is at the roof perio- c. Show your calculations usi'. this equation: n vent rate=((0.01 x floor area)+ [7.5 x(#bedrooms+ 1)]) x 0.75 RECEIVED 06/05/2018 ASPEN BUILDING DEPARTMENT Page: M101 LOWER LEVEL MECHANICAL PLAN File Name: plans.pdf The dryer exhau ducts exceed Subject: Dryer duct length 35'of develope'. length. Either Author: nickt reduce the I- gth or provide Color: • installatio nstructions for a o 4 _= 444 dryer ;:el or UL 705 listed -=---=1 Dryer booster fans added since dryers have not been dryer .00ster fan that will permit selected yo proposed length. (2015 IMC —L,_.1''' _ I_i 5. .8.4) iiv- -! Wi Page: M103 UPPER LEVEL MECHANICAL PLAN File Name: plans.pdf Provide interlocked eup air if Subject: Kitchen Hood Makeup Air the kitchen hoo xhaust rate is Author: nickt over 400 CF . Describe how this will accomplished and Color: • locat exhaust&intake. (2015 }i r This was noted on the previous set. System description on I 505.2) --I ' -'T-=!-64 ` 1 o- M001 specifies interlock as well as notes on M002 for KH - 1. 1 1 OA to FCU - 1 is specified on M102. i11 F t -- II ` RECEIVED 06/05/2018 ASPEN BUILDING DEPARTMENT