HomeMy WebLinkAboutFile Documents.34 Westview Dr.0056.2018 (10).ARBK Aspen Consolidated Sanitation District
John Keleher- President Stoney Davis -Member
Joe Zanin—Vice President Jeff Yusem- Member
Roy Holloway—Secretary/Treasurer Bruce Matherly—Manager
Agreement to Terminate Sewer Service
By signing this agreement, the parties listed below hereby acknowledge that the premise(s)
located at: 34 Westview Dr. , Aspen Colorado,
is connected to the Aspen Consolidated Sanitation District sewer system and that said
sanitary sewer service connection shall be excavated and terminated (capped) at the sewer
main prior to commencement of any soil stabilization work, such as soil nailing or micro-
piling.
Demolition and Excavation and/or Access and Infrastructure permits will not be approved
without acceptance of this agreement. No subsequent permits shall be approved without
verification by the Aspen Consolidated Sanitation District of the sanitary sewer service line
termination (capping).
Owner:
Margo Koval � �r�J7l/�Eva.Q,
3/14/18
Name Signature Date
Contractor:
Name Title Company Name
3 /5 rce,
Signature Date
565 N. Mill St., Aspen, CO 81611 / (970)925-3601 / FAX (970)925-2537 RECEIVED
03/22/2018
ASPEN
BUILDING DEPARTMENT