Loading...
HomeMy WebLinkAboutFile Documents.824 E Durant Ave.0047.2018 (5).ARBK e (01 0 S Environmental & Disaster Restoration, Inc . ECOS Environmental - Glenwood Springs 6690 Hwy 82 Glenwood Springs, CO 81601 Office - (970) 945-4407 info@ecosenvironmental.com www.ecosenvironmental.com ii ASBESTOS INSPECTION REPORT CLIENT: Schlumberger Construction ADDRESS: 314C AABC CITY/STATE: Aspen CO 81611 EMAIL: Kj.buildinglogic@gmail.com PHONE: 970-309-5098 Ecos JOB NUMBER G-18-043-AT PROJECT LOCATION: 824 E Durant Aspen CO 81611 DATE OF INSPECTION: 2/7/18 RECEIVED 03/05/2018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. SUMMARY ECOS Environmental&Disaster Restoration (ECOS) was retained to conduct a limited asbestos inspection at the above location in reference to determine if there is asbestos containing material (ACM),in the building prior to remodeling. The limited inspection included drywall and some grout located in the bathrooms,however, should any additional building materials be discovered during demolition,those materials must be sampled and analyzed prior to continuing with the work. Other areas that should be tested include the remaining tilework, any electrical or ductwork that will be disturbed, and flooring,which were not tested per client request. Nine (9) samples were collected of some suspect materials throughout the building,as listed in the Lab Data Table located on Page 8 of this report. INSPECTOR QUALIFICATIONS This inspection was performed by Alison George,Colorado State Department of Public Health and Environment Certification Number 24206. SAMPLE ANALYSIS PROCEDURE Suspect material was sampled and delivered under a chain of custody for analysis to Aerobiology Laboratory in Denver, CO. Samples were analyzed by Polarized Light Microscopy. TRANSMITTAL OF BUILDING One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows: • One copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition,renovation,remodeling or repair work under applicable State or local laws. • The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition,renovation,remodeling or repair project. RECEIVED 03/052018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION The asbestos survey shall, at a minimum,identify and assess with due diligence,the locations, quantities,friability and conditions of all building material types at the affected portion of the building/structure. The certified asbestos inspector is responsible for identification and assessment of all type within the affected portion of the building/structure. All building materials visually assessed shall be assumed to be asbestos containing material (ACM), unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies. The subsequent analysis is performed by a laboratory that meets the requirements and the analyses satisfies both CO STATE ELAP and federal requirements,including multi-layered sample analyses,to document non-asbestos containing material. The building/structure asbestos survey shall also include the building/structure name,address,the building/structure owner's name and address,the name and address of the owner's agent,the name of the firm performing the asbestos survey and a copy of the firm's current asbestos handling license,the names of the certified inspector(s) performing the survey and a copy of the current asbestos handling certificate for each inspector utilized,the dates of the asbestos survey, a listing of homogeneous areas identifying which ones are ACM,all laboratory analysis reports for bulk samples collected,and copies of the appropriate certifications for the laboratory used for analysis of samples taken during the asbestos survey. REMOVAL REQUIREMENT If the building/structure asbestos survey finds that the portion of the building/structure to be demolished,renovated,remodeled,or have repair work contains asbestos containing material (ACM), which is impacted by the work,the owner or the owner's agent shall conduct,or cause to have conducted,asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth. All ACM impacted by the demolition,renovation,remodeling or repair project shall be removed,prior to access or disturbance by other uncertified trades or personnel. No demolition,renovation, remodeling or repair work shall be commenced by any owner or the owner's agent prior to the completion of the asbestos abatement in accordance with the notification requirements. For multi- phased work,the access restriction for uncertified trades or personnel applies to each intermediate portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other trades,or personnel may access that portion of the work site. For demolition projects that are exempt from asbestos survey requirements due to being structurally unsound,the demolition is considered an asbestos project. All building/structure owners and asbestos abatement contractors on a demolition,renovation, remodeling, or repair project shall inform all trades on the work site about the ACM at the work site. RECEIVED 03/05/2018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. UNIDENTIFIED AND UNASSESSED ASBESTOS When any construction activity,such as demolition,remodeling,renovation or repair work,reveals suspect ACM that has not been identified by the asbestos survey,or has not been identified by other inspections as per current OSHA or EPA requirements,all activities shall cease in the area where the suspect ACM is found. Unassessed suspect miscellaneous ACM shall be treated and handled as ACM and assumed to be ACM,unless proven otherwise by standard EPA and OSHA accepted methods. To document non-asbestos containing material,analysis must be performed by a laboratory that meets the requirements of the DOH; and the analysis satisfies both CO STATE ELAP and federal requirements. ASBESTOS PROJECTS An asbestos project is any work that involves the removal,encapsulation,enclosure,repair or disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in the release of asbestos fibers.For the purpose of compliance an asbestos project shall include any disturbance of asbestos fibers,and the planning, asbestos survey, design,background air sampling, inspection,air sampling and oversight of abatement work,cleanup, and the handling of all asbestos material subject to abatement,as well as the supervising of such activities. An asbestos project starts with Phase I when the planning, asbestos survey,and design work begins or is required to begin. The project shall not be considered completed until Phase II D is complete. (See Table 1 below). Phase I Phase II (Prior to Asbestos Start->Abatement-> End Abatement Contractor) A B A B C D Regulated Asbestos Asbestos abatement handling Final survey, Background work area(s) including gross cleaning Final waste planning, air sampling preparation removal or and removal and design and enclosure abatement,initial clearance from site construction cleans, and waste air samples Start->Asbestos Project->Final Clearance RECEIVED 03/05,2018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. ASBESTOS RESULTS FLOW CHART Asbestos Test Non Detect < 1% >1% M No Action OSHA Reg. 8 dditional Reg. 8 Required I Requirements Requirements Requirements >3,000 SF iNO Permit Required Permit Project Design I� ECOS provides Project Manager clearance (NOT Clearance Testing required) I Oversight Manifested Disposal at pproved Landfill ASBESTOS PROJECT SIZE Large asbestos project: An asbestos project involving the removal, disturbance, enclosure, encapsulation,repair or handling of 160 square feet or more of ACM, or 260 linear feet or more of ACM. Small asbestos project: An asbestos project involving the removal,encapsulation, enclosure,repair, disturbance or any handling of more than 10 and less than 160 square feet of ACM or more than 25 and less than 260 linear feet of ACM. Minor asbestos project: An asbestos project involving the removal, disturbance,repair, encapsulation, enclosure or handling of 10 square feet or less of ACM or 25 linear feet or less of ACM. RECEIVED 03/05/2018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. A si3ESTOS REMOVAL CATEGORIES Category I Non-Friable ACM:NESHAP classification-Asbestos-containing packings, gaskets,resilient floor covering,and asphalt roofing products,containing more than one percent (1%) asbestos, that when dry,cannot be crumbled,pulverized,or reduced to powder by hand pressure. Category II Non-Friable ACM:NESHAP classification-Any material,excluding Category I Non-Friable ACM,containing more than one percent(1%) asbestos that,when dry,cannot be crumbled,pulverized, or reduced to powder by hand pressure. Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems Insulation(TSI),and surfacing ACM and PACM. Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACM which is not TSI or surfacing material. This includes,but is not limited to,the removal of asbestos-containing wallboard,floor tile and sheeting,roofing and siding shingles,and construction mastics. Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations,where no more than a minor quantity of ACM,including TSI and surfacing ACM and PACM,is likely to be disturbed. Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which employees contact but do not disturb ACM or PACM and activities to clean up non-ACM dust,waste and debris resulting from Class I,II and III activities. DEFINITIONS Abatement:Procedures to control fiber release from asbestos material. This includes removal, encapsulation, enclosure,repair, and disturbance of friable asbestos or any handling of asbestos material that may result in the release of asbestos fibers. Amosite:An Asbestiform mineral of the amphibole group containing approximately 50% silicon and 40% Iron(II) Oxide,and is made up of straight brittle fibers,light gray to pale brown in color. Amphibole: One of the two major groups of minerals from which the Asbestiform minerals are derived, distinguished by their chain-like crystal structure and chemical composition. Asbestos:A generic name given to a number of naturally occurring hydrated mineral silicates that possess a unique crystalline structure,are incombustible in air, and are separable into fibers. Asbestos includes the asbesti-form varieties of chrysotile (serpentine);crocidolite (riebeckite);amosite (cummington-grunerite);anthophyllite;and actinolite. Asbestos Project:Work undertaken by a contractor which at any time involves any aspect of the removal, encapsulation,enclosure or disturbance of friable asbestos,or any handling of asbestos material that may result in the release of asbestos fiber,except work in an owner-occupied single family dwelling performed by the owner of such dwelling. An asbestos project shall include the planning, RECEIVED 03/0592018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. design,monitoring,inspection,and air sampling of abatement work,as well as the supervising of such activities. Building Owner:The person in whom legal title to the premises is vested unless the premises are held in land trust,in which instance building owner means the person in whom beneficial title is vested. Electron Microscopy:A method of asbestos sample analysis which utilizes an electron beam to differentiate between fibers. Emergency:An unexpected,unanticipated or unforeseen occurrence,including but not limited to,a steam,chemical, gas or water line rupture,a boiler failure, or a building collapse,which poses (a) an imminent danger to the health and safety of the public,the response to which will constitute an asbestos project; or (b) an asbestos-related risk to the health and safety of the public from exposure to asbestos fibers. Friable Asbestos:Any materials that contain more than 1% asbestos and can be crumbled,pulverized, or reduced to powder by hand pressure. HEPA Filter Vacuum Equipment:Vacuuming equipment with a high efficiency particulate air filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater than 0.3 microns equivalent aerodynamic diameter. Homogenous:Evenly mixed and similar in appearance and texture throughout. NESHAP:National Emission Standard for Hazardous Air Pollutants OSHA:Occupational Safety and Health Administration Operations and Management Plan (OMP): Specific procedures and practices developed for the interim control of asbestos-containing materials in buildings until it is removed. Polarized Light Microscopy (PLM):An optical microscopic technique used to distinguish between different types of asbestos fibers by their shape and unique optical properties. Repair: Corrective action using required work practices to control fiber release from damaged asbestos material. TSI:Thermal Systems Insulation RECEIVED 03/05/2018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. LAB DATA Non Sample Suspect Material Detect Detect Percentage Friability Condition APPR.SF A2 Tape,Joint Compound,Texture X 0% Yes Good 900sf with tan paint A3 Tape,Joint Compound, X 0% Yes Good 900sf Drywall,Texture with white paint B1 Tape,Texture with white paint, X 0% Yes Good 1100sf Joint Compound,Drywall B2 Tape,Texture with grey paint, X 0% Yes Good 1100sf Texture with tan paint,Joint Compound,Drywall B3 Tape,Texture with white paint, X 0% Yes Good 1100sf Joint Compound C1 Tape,Joint Compound, X 0% Yes Good 40sf Drywall,White Texture with white paint, Brown wall covering F1 White Granular resinous X 0% Yes Good 201f material G1 White granular plaster X 0% Yes Good 201f H1 While sealant with white paint X 0% Yes Good 151f INVENTORY Homogenous Material Description A Light texture drywall (ground floor) B Plastered Drywall (upstairs and ground floor) C Drywall with fabric (downstairs bedroom) F Tile Grout(ground floor bathroom) G Tile Grout(downstairs bathroom) H Sealant(Laundry Room) CONCLUSIONS Visual inspection was completed of all building materials to be affected during removal of the water damaged drywall. Three (3) samples were collected and sent to Aerobiology Laboratories in Golden, CO,for analysis using Polarized Light Microscopy (PLM). The samples came back non-detect for asbestos. RECEIVED 03/0592018 ASPEN BUILDING DEPARTMENT ecos Environmental &Disaster Restoration,Inc. CERTIFICATIONS - r ,i ci • Colorado Department '' of Public Health 0-` and Environment ;'i ASBESTOS CONSULTING FIRM !, This certifies that - Ecos Environmental and Disaster Restoration, Inc1 Registration No.:ACF-14480 , has met the registration requirements of 25-7-507,C.R.S.and the Air Quality Control c Commission Regulation No.8,Part B,and is hereby authorized to perform asbestos consulting lt, ' activities as required under Regulation No 8, Part B. in the state of Colorado. I, 4 i t Issued: September 09,2017 { Expires: September 09,2018 4 7 _-_ Auawrlena APCD t t4 4 9EAL / '� - 1 t i it - f �� '+ �` �� � a t r 1 � �f ✓ t �!1`.� § r is� �. iti d l'_-, , i" Colorado Department y:-F_ of Public Health and Environment ASBESTOS CERTIFICATION* l ris certifies that + Alison George wi. fy Certification No.:24206 has met the requirements of 25-7-507,C.R.S.and Air Quality Control Commission Regulation No.8,Part B,and is hereby certified by the :,_ state of Colorado in the following discipline: .tt "f Building Inspector* i Issued: January 11,2018 Expires. January It.2019 Anil,..Rmre 1,rnlln anh Mrn rhrpnsu.Jnx to ,// //C /� RECEIVED 03/05/2018 ASPEN BUILDING DEPARTMENT ecos Environmental ❑isaster Restoration,Inc. PHOTOS - r • El.: Alt RECEWED 03/O02018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. a i -iip woitiottr7 0:: _ - ..‘..k k`sy\ alh. 0#004e01101. . :, :\11/4\\ if' r 11611:41C FINAL NOTES This report represents the opinion of the reporting asbestos inspector at the time of the asbestos assessment survey. If you have any further questions, or if additional information is needed please do not hesitate to call. Sincerely, c Alison George Colorado State EPA Asbestos Inspector#24206 ECOS Environmental&Disaster Restoration, Inc. (970) 945-4407 RECEIVED 03/0g/2018 ASPEN BUILDING DEPARTMENT