ASBESTOS INSPECTION REPORT
CLIENT: Schlumberger Construction
ADDRESS: 314C AABC
CITY/STATE: Aspen CO 81611
EMAIL: Kj.buildinglogic@gmail.com
PHONE: 970-309-5098
Ecos JOB NUMBER G-18-043-AT
PROJECT LOCATION: 824 E Durant
Aspen CO 81611
DATE OF INSPECTION: 2/7/18
RECEIVED
03/05/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
SUMMARY
ECOS Environmental&Disaster Restoration (ECOS) was retained to conduct a limited asbestos
inspection at the above location in reference to determine if there is asbestos containing material
(ACM),in the building prior to remodeling. The limited inspection included drywall and some grout
located in the bathrooms,however, should any additional building materials be discovered during
demolition,those materials must be sampled and analyzed prior to continuing with the work. Other
areas that should be tested include the remaining tilework, any electrical or ductwork that will be
disturbed, and flooring,which were not tested per client request. Nine (9) samples were collected of
some suspect materials throughout the building,as listed in the Lab Data Table located on Page 8 of
this report.
INSPECTOR QUALIFICATIONS
This inspection was performed by Alison George,Colorado State Department of Public Health and
Environment Certification Number 24206.
SAMPLE ANALYSIS PROCEDURE
Suspect material was sampled and delivered under a chain of custody for analysis to Aerobiology
Laboratory in Denver, CO. Samples were analyzed by Polarized Light Microscopy.
TRANSMITTAL OF BUILDING
One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted
by the building/structure owner as follows:
• One copy of the completed asbestos survey shall be sent by the owner or their agent to the local
government entity charged with issuing a permit for such demolition,renovation,remodeling
or repair work under applicable State or local laws.
• The completed asbestos survey shall be kept on the construction site with the asbestos
notification and variance, if required, throughout the duration of the asbestos project and
any associated demolition,renovation,remodeling or repair project.
RECEIVED
03/052018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION
The asbestos survey shall, at a minimum,identify and assess with due diligence,the locations,
quantities,friability and conditions of all building material types at the affected portion of the
building/structure. The certified asbestos inspector is responsible for identification and assessment of
all type within the affected portion of the building/structure.
All building materials visually assessed shall be assumed to be asbestos containing material (ACM),
unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies. The
subsequent analysis is performed by a laboratory that meets the requirements and the analyses satisfies
both CO STATE ELAP and federal requirements,including multi-layered sample analyses,to
document non-asbestos containing material.
The building/structure asbestos survey shall also include the building/structure name,address,the
building/structure owner's name and address,the name and address of the owner's agent,the name of
the firm performing the asbestos survey and a copy of the firm's current asbestos handling license,the
names of the certified inspector(s) performing the survey and a copy of the current asbestos handling
certificate for each inspector utilized,the dates of the asbestos survey, a listing of homogeneous areas
identifying which ones are ACM,all laboratory analysis reports for bulk samples collected,and copies
of the appropriate certifications for the laboratory used for analysis of samples taken during the
asbestos survey.
REMOVAL REQUIREMENT
If the building/structure asbestos survey finds that the portion of the building/structure to be
demolished,renovated,remodeled,or have repair work contains asbestos containing material (ACM),
which is impacted by the work,the owner or the owner's agent shall conduct,or cause to have
conducted,asbestos removal performed by a licensed asbestos abatement contractor in conformance
with all standards set forth.
All ACM impacted by the demolition,renovation,remodeling or repair project shall be removed,prior
to access or disturbance by other uncertified trades or personnel. No demolition,renovation,
remodeling or repair work shall be commenced by any owner or the owner's agent prior to the
completion of the asbestos abatement in accordance with the notification requirements. For multi-
phased work,the access restriction for uncertified trades or personnel applies to each intermediate
portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other
trades,or personnel may access that portion of the work site. For demolition projects that are exempt
from asbestos survey requirements due to being structurally unsound,the demolition is considered
an asbestos project.
All building/structure owners and asbestos abatement contractors on a demolition,renovation,
remodeling, or repair project shall inform all trades on the work site about the ACM at the work site.
RECEIVED
03/05/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
UNIDENTIFIED AND UNASSESSED ASBESTOS
When any construction activity,such as demolition,remodeling,renovation or repair work,reveals
suspect ACM that has not been identified by the asbestos survey,or has not been identified by other
inspections as per current OSHA or EPA requirements,all activities shall cease in the area where
the suspect ACM is found. Unassessed suspect miscellaneous ACM shall be treated and handled as
ACM and assumed to be ACM,unless proven otherwise by standard EPA and OSHA accepted
methods. To document non-asbestos containing material,analysis must be performed by a laboratory
that meets the requirements of the DOH; and the analysis satisfies both CO STATE ELAP and federal
requirements.
ASBESTOS PROJECTS
An asbestos project is any work that involves the removal,encapsulation,enclosure,repair or
disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in
the release of asbestos fibers.For the purpose of compliance an asbestos project shall include any
disturbance of asbestos fibers,and the planning, asbestos survey, design,background air sampling,
inspection,air sampling and oversight of abatement work,cleanup, and the handling of all asbestos
material subject to abatement,as well as the supervising of such activities. An asbestos project starts
with Phase I when the planning, asbestos survey,and design work begins or is required to begin. The
project shall not be considered completed until Phase II D is complete. (See Table 1 below).
Phase I Phase II
(Prior to Asbestos Start->Abatement-> End
Abatement Contractor)
A B A B C D
Regulated Asbestos
Asbestos abatement handling Final
survey, Background work area(s) including gross cleaning Final waste
planning, air sampling preparation removal or and removal
and design and enclosure abatement,initial clearance from site
construction cleans, and waste air samples
Start->Asbestos Project->Final Clearance
RECEIVED
03/05,2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
ASBESTOS RESULTS FLOW CHART
Asbestos Test
Non Detect < 1% >1%
M No Action OSHA Reg. 8 dditional Reg. 8
Required I Requirements Requirements Requirements
>3,000 SF
iNO Permit Required Permit Project Design
I�
ECOS provides
Project Manager
clearance (NOT Clearance Testing
required) I Oversight
Manifested
Disposal at
pproved Landfill
ASBESTOS PROJECT SIZE
Large asbestos project: An asbestos project involving the removal, disturbance, enclosure,
encapsulation,repair or handling of 160 square feet or more of ACM, or 260 linear feet or more of
ACM.
Small asbestos project: An asbestos project involving the removal,encapsulation, enclosure,repair,
disturbance or any handling of more than 10 and less than 160 square feet of ACM or more than 25 and
less than 260 linear feet of ACM.
Minor asbestos project: An asbestos project involving the removal, disturbance,repair, encapsulation,
enclosure or handling of 10 square feet or less of ACM or 25 linear feet or less of ACM.
RECEIVED
03/05/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
A si3ESTOS REMOVAL CATEGORIES
Category I Non-Friable ACM:NESHAP classification-Asbestos-containing packings, gaskets,resilient
floor covering,and asphalt roofing products,containing more than one percent (1%) asbestos, that
when dry,cannot be crumbled,pulverized,or reduced to powder by hand pressure.
Category II Non-Friable ACM:NESHAP classification-Any material,excluding Category I Non-Friable
ACM,containing more than one percent(1%) asbestos that,when dry,cannot be crumbled,pulverized,
or reduced to powder by hand pressure.
Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems
Insulation(TSI),and surfacing ACM and PACM.
Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACM which is not
TSI or surfacing material. This includes,but is not limited to,the removal of asbestos-containing
wallboard,floor tile and sheeting,roofing and siding shingles,and construction mastics.
Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations,where no more
than a minor quantity of ACM,including TSI and surfacing ACM and PACM,is likely to be disturbed.
Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which
employees contact but do not disturb ACM or PACM and activities to clean up non-ACM dust,waste
and debris resulting from Class I,II and III activities.
DEFINITIONS
Abatement:Procedures to control fiber release from asbestos material. This includes removal,
encapsulation, enclosure,repair, and disturbance of friable asbestos or any handling of asbestos
material that may result in the release of asbestos fibers.
Amosite:An Asbestiform mineral of the amphibole group containing approximately
50% silicon and 40% Iron(II) Oxide,and is made up of straight brittle fibers,light gray to pale brown in
color.
Amphibole: One of the two major groups of minerals from which the Asbestiform minerals are
derived, distinguished by their chain-like crystal structure and chemical composition.
Asbestos:A generic name given to a number of naturally occurring hydrated mineral silicates that
possess a unique crystalline structure,are incombustible in air, and are separable into fibers. Asbestos
includes the asbesti-form varieties of chrysotile (serpentine);crocidolite
(riebeckite);amosite (cummington-grunerite);anthophyllite;and actinolite.
Asbestos Project:Work undertaken by a contractor which at any time involves any aspect of the
removal, encapsulation,enclosure or disturbance of friable asbestos,or any handling of asbestos
material that may result in the release of asbestos fiber,except work in an owner-occupied single family
dwelling performed by the owner of such dwelling. An asbestos project shall include the planning,
RECEIVED
03/0592018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
design,monitoring,inspection,and air sampling of abatement work,as well as the supervising of such
activities.
Building Owner:The person in whom legal title to the premises is vested unless the premises are held
in land trust,in which instance building owner means the person in whom beneficial title is vested.
Electron Microscopy:A method of asbestos sample analysis which utilizes an electron beam to
differentiate between fibers.
Emergency:An unexpected,unanticipated or unforeseen occurrence,including but not limited to,a
steam,chemical, gas or water line rupture,a boiler failure, or a building collapse,which poses (a) an
imminent danger to the health and safety of the public,the response to which will constitute an
asbestos project; or (b) an asbestos-related risk to the health and safety of the public from exposure to
asbestos fibers.
Friable Asbestos:Any materials that contain more than 1% asbestos and can be crumbled,pulverized,
or reduced to powder by hand pressure.
HEPA Filter Vacuum Equipment:Vacuuming equipment with a high efficiency particulate air
filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater
than 0.3 microns equivalent aerodynamic diameter.
Homogenous:Evenly mixed and similar in appearance and texture throughout.
NESHAP:National Emission Standard for Hazardous Air Pollutants
OSHA:Occupational Safety and Health Administration
Operations and Management Plan (OMP): Specific procedures and practices developed for the
interim control of asbestos-containing materials in buildings until it is removed.
Polarized Light Microscopy (PLM):An optical microscopic technique used to distinguish between
different types of asbestos fibers by their shape and unique optical properties.
Repair: Corrective action using required work practices to control fiber release from damaged asbestos
material.
TSI:Thermal Systems Insulation
RECEIVED
03/05/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
LAB DATA
Non
Sample Suspect Material Detect Detect Percentage Friability Condition APPR.SF
A2 Tape,Joint Compound,Texture X 0% Yes Good 900sf
with tan paint
A3 Tape,Joint Compound, X 0% Yes Good 900sf
Drywall,Texture with white
paint
B1 Tape,Texture with white paint, X 0% Yes Good 1100sf
Joint Compound,Drywall
B2 Tape,Texture with grey paint, X 0% Yes Good 1100sf
Texture with tan paint,Joint
Compound,Drywall
B3 Tape,Texture with white paint, X 0% Yes Good 1100sf
Joint Compound
C1 Tape,Joint Compound, X 0% Yes Good 40sf
Drywall,White Texture with
white paint, Brown wall
covering
F1 White Granular resinous X 0% Yes Good 201f
material
G1 White granular plaster X 0% Yes Good 201f
H1 While sealant with white paint X 0% Yes Good 151f
INVENTORY
Homogenous Material Description
A Light texture drywall (ground floor)
B Plastered Drywall (upstairs and ground floor)
C Drywall with fabric (downstairs bedroom)
F Tile Grout(ground floor bathroom)
G Tile Grout(downstairs bathroom)
H Sealant(Laundry Room)
CONCLUSIONS
Visual inspection was completed of all building materials to be affected during removal of the water
damaged drywall. Three (3) samples were collected and sent to Aerobiology Laboratories in Golden,
CO,for analysis using Polarized Light Microscopy (PLM). The samples came back non-detect for
asbestos. RECEIVED
03/0592018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental &Disaster Restoration,Inc.
CERTIFICATIONS
-
r
,i
ci
• Colorado Department ''
of Public Health 0-`
and Environment ;'i
ASBESTOS CONSULTING FIRM !,
This certifies that -
Ecos Environmental and Disaster Restoration, Inc1
Registration No.:ACF-14480
, has met the registration requirements of 25-7-507,C.R.S.and the Air Quality Control
c Commission Regulation No.8,Part B,and is hereby authorized to perform asbestos consulting lt, '
activities as required under Regulation No 8, Part B. in the state of Colorado. I, 4
i t
Issued: September 09,2017 {
Expires: September 09,2018 4 7 _-_
Auawrlena APCD
t
t4 4 9EAL
/
'� - 1 t i it - f �� '+ �`
�� � a t r 1 � �f ✓ t �!1`.�
§ r is� �. iti d
l'_-,
, i" Colorado Department y:-F_
of Public Health
and Environment
ASBESTOS
CERTIFICATION*
l ris certifies that
+ Alison George
wi.
fy Certification No.:24206
has met the requirements of 25-7-507,C.R.S.and Air Quality Control
Commission Regulation No.8,Part B,and is hereby certified by the
:,_ state of Colorado in the following discipline:
.tt
"f Building Inspector*
i
Issued: January 11,2018
Expires. January It.2019
Anil,..Rmre 1,rnlln anh Mrn rhrpnsu.Jnx to ,// //C /�
RECEIVED
03/05/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental ❑isaster Restoration,Inc.
PHOTOS
- r
• El.:
Alt
RECEWED
03/O02018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
a
i
-iip woitiottr7
0::
_ - ..‘..k k`sy\ alh.
0#004e01101. . :, :\11/4\\
if' r
11611:41C
FINAL NOTES
This report represents the opinion of the reporting asbestos inspector at the time of the asbestos
assessment survey. If you have any further questions, or if additional information is needed please do
not hesitate to call.
Sincerely,
c
Alison George
Colorado State EPA Asbestos Inspector#24206
ECOS Environmental&Disaster Restoration, Inc.
(970) 945-4407