Loading...
HomeMy WebLinkAboutFile Documents.34 Westview Dr.0056.2018 (20).ARBK ASPEN LINE GRADE VERIFICATION FORM Verification of Building Location by Building Contractor For Building and Permit Information,please refer to our website at: THE CITY OF ASPEN http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building/Job Address or Location: 34 Westview Dr. Aspen, CO 81611 o Your Name (Person Completing Part A): Joseph Spears, AIA o Your Company: S2 Architects o Plans must show horizontal dimensions that 'tie' the building to the property boundary. Are building ties shown? (circle one) kI1 'No' o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? TBM = 8138.33' o If the garage is located within 10 feet • e roadway or sidewalk,provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? 'Yes' 4551 'N/A' o Provide the equation comparing site(surveyed) elevation to structure/architectural plan elevation: (i.e., 100' first floor elev=7962.50') 100'-3" = 8142.0' PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): `Yes' `No' o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? o According to the building plans,what was the design elevation for the same place on the foundation wall? o Was the elevation of the building adjusted in field? (circle one): `Yes' `No' o If yes,why? The undersigned qualified individual certifies that the information in Part B is accurate- Signature: Date: _ Printed Name: Contact ph. # : Company: RECEIVED Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf R 0`b'4?s2/2 018 ASPEN BUILDING DEPARTMENT