Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.506 E Main St.0024-2022-BROF
• Close Window salesforce • Print This Page • Expand All I Collapse All 0024-2022-BROF Number 0024-2022-BROF Record Type Roofing/Re-Roofing Address 506 E MAIN ST Owner Emily Niederbremer Original Number 22-0292 Status Closed-Final Type Roofing/Re-Roofing Reason for Cancel or Comp!. Review Fail Applicant ANDY DUCKETT-EMKE Aspen Internal? No Account ANDERSON HALLAS ARCITECTS Bluebeam Project Id 030-835-630 Project HPC-ZON-EH-UTIL Review HPC Rev, Master Building Permit Eng Review Eng-CMP Rev, Permit Contractor Fa CONSTRUCTORS INC Parks-Prkng-San Review Parks Rev, Valid Business License on Account Conditional Inspections Parks Insp, Imported Conditional Final Insp Parks Final, Required Submissions Documents Resubmitted Approved Covid-19 Plan 1 Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 1 Conditional Flat Fee Formula Price Book 2022 Conditional Tiered Fee Formula Applicant is a Nonprofit? Yes Conditional Tiered SqFt Fee Discount All Fees(%) Formula Fee Discount Reason CO/LOC? LOC CO Status if Applicable Issued Queue Scoring Queue Designation IFFR&Roof Milestone Current Days in 0 Applicant Hand Queue Score 0 Milestone Current Days in City 23 Hands Last Date Received from Applicant Milestone-Total Days in Applicant 0 Hand Milestone-Total Days in City 18 Hands Dates New Application Date 2/6/2022 Close/CO Issuance Date 1/19/2023 Application Complete Date 4/12/2022 Expiration Date 3/22/2023 Application Accepted Date 4/12/2022 Override Expiration Date Issue Date 6/28/2022 Last Activity Date 9/23/2022 Additional Information Description The existing flat roof and asphalt shingles will be removed and Census Code RF-Roof replaced.The insulation is not part of the thermal envelope.No new thermal insulation will be part of this scope.New poly iso insulation will be added at flat roof areas only to provide proper slope to internal drains.New roofing will not include any work on the existing tower. Use of Building Commercial Requires Asbestos Test? Yes Use Class Commercial Permit Comments Please submit spec sheet(s)for shingles selected.In person samples are approved,but documentation of the specs is needed for the record. Job Location Address 506 E MAIN ST,ASPEN:273707347851 Lot 1 Site Address Display on Map Legal Description Subdivision:PITKIN COUNTY CENTER Lot:1 AMENDED Historic Property? No Eden Address Historic District? Yes HPC-Planning-Zoning Details Zone District PUB HPC Certificate of Yes Appropriateness? Deed Restricted? No Roofing Project Details Valuation $300,000.00 Lot Size Sq.Ft. 62,291 Reason for Valuation Change Sq Ft of Building Work Area 16,168 Scope of Work Details Affects Parking/Alleys/Loading? No Work Affects Tree/Drip Line? Yes Located Within City Mall No Boundaries? Impacts City Trails/Parks? No Adjacent to City Open Space? Yes Building Description Code Editions 2015 IBC Energy Code Compliance Building Type(IRC) Fire Sprinkler Existing? Construction Type IIIA Fire Sprinkler Required? Occupancy Group Fire Sprinkler Type Fire Alarms Installed? Financials Total Fees $5,677.84 Total Payments $5,677.84 Fees Due at Current Status $830.42 Total Balance $0.00 System Information Created By ANDY DUCKETT-EMKE,2/4/2022 4:31 PM Last Modified By Emily Niederbremer,1/19/2023 12:01 PM Number 0024-2022-BROF VIP Form Tool VIP 2/6/2022 VIP Permit Application Submitted 1:46 PM Form Template VIP VIP i{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAs"), Foreign Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Language Status {"parentCategoryld":"a2 E6A000OOOUwvKUAS","isSubmit":null,"isCu rrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwvh I {"parentCategoryld":null,"isSubmit":null,"isCu rrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwva UAC"), {"parentCategoryld":null,"isSubmit":null,"isCu rrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), {"parentCategoryld":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC")] Action Items View/Print Permit Link Attachment Activity History Email:Letter of Completion:Permit 0024-2022-BROF at 506 E MAIN ST,ASPEN:273707347851 Type Billable Assigned To Emily Niederbremer Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/19/2023 Days in Applicant's Hands To:andyduckett-emke@andarch.com CC: BCC: Attachment:506 E Main St City_Use_Tax_-_FRR_Transmittal_to_Owner_20230119.pdf,506 E Main St City_Use_Tax_-_FRR_Notice_to Contractor_20230119.pdf, 506 E Main St-0024-2022-BROF_LOC Final.pdf Comments Subject:Letter of Completion:Permit 0024-2022-BROF at 506 E MAIN ST,ASPEN:273707347851 Body: Hello ANDY DUCKETT-EMKE, Please find attached your issued letter of completion for the completed project at 506 E MAIN ST,ASPEN:273707347851. If you have any questions,please let us know. Email:Building Permit 0024-2022-BROF-506 E MAIN ST,ASPEN:273707347851-Issued Type Billable Assigned To Savannah Pope Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/28/2022 Days in Applicant's Hands To:andyduckett-emke@andarch.com CC: BCC: Attachment:506 E Main St.-0024-2022-BROF.pdf Subject:Building Permit 0024-2022-BROF-506 E MAIN ST,ASPEN:273707347851-Issued Body: ANDY DUCKETT-EMKE, Please find attached your issued building permit for 0024-2022-BROF for 506 E MAIN ST,ASPEN:273707347851,City Use Tax exemption letter and COVID-19 site safety plan approval notice(if applicable). Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,links will expire in 30 days so please download the plans as soon as you get this email. Comments https://cityofaspen.sharepoint.com/:f:/s/COA-IssuedBuildingPlansPublicRecords/EgfijnjuwCRNuH4zpnX7v18BTDSkGIYV9W8g7v3DBj9XuQ?e=5C98co All inspections are scheduled through the Salesforce applicant portal. BUILDING INSPECTIONS REQUESTED BY 7:30 PM WILL BE SCHEDULED FOR THE NEXT BUSINESS DAY.REQUESTS AFTER 7:30 PM WILL BE SCHEDULED FOR THE FOLLOWING BUSINESS DAY.ALLOW THE ENTIRE DAY FOR THE INSPECTION. PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. WHAT INSPECTIONS DO I NEED?Please visit here:https://www.cityofaspen.com/DocumentCenter/View/7847/-What-Inspections-are-Needed-for-my-Permit?bidld= HOW TO SCHEDULE AN INSPECTION ONLINE?Please visit here:https://www.cityofaspen.com/DocumentCenterNiew/6436/How-to-request-an-inspection?bidld= For questions on inspections please email buildinginspectors@cityofaspen.com or call 970-920-5065. If you are experiencing system issues please contact sfsupport@cityofaspen.com Email:COA Building Department Staff Changes Type Billable Assigned To AnnMarie Prince Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/2/2022 Days in Applicant's Hands Comments To:andyduckett-emke@andarch.com CC: BCC: Attachment:--none-- Subject:COA Building Department Staff Changes Body: Dear Salesforce Applicant, The Building Department has had a change of staffing and would like to let you know that your Permit Owner for permit number 0024-2022-BROF may have changed. Emmy Garrigus has moved to the position of Plans Examiner and is no longer the owner of many permits.Sydney Fallon is now taking on much of this role as the new Building Support Specialist. Please contact the appropriate owner for questions related to this specific permit (the owner is identified under the permit details.) Moving forward,please contact Sydney Fallon,Building Support Specialist (970)309-5894 1 buildingsupport@aspen.gov for the following: All new applications Schedule a pre-submittal meeting Permit application requirements or completeness review questions Help submitting responses to comments and change orders Please contact your reviewers directly for any questions regarding their comments. Reviewers can be viewed in Salesforce following the instructions here. And remember,Permit Status information is available 24/7 via the Salesforce Portal.For instructions click here. Thank you. **DO NOT REPLY TO THIS EMAIL** Email:Permit Fees Due:0024-2022-BROF at 506 E MAIN ST,ASPEN:273707347851 Type Billable Assigned To Risa Rushmore Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/18/2022 Days in Applicant's Hands To:andyduckett-emke@andarch.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:0024-2022-BROF at 506 E MAIN ST,ASPEN:273707347851 Body: If you have not already paid the fees due on your permit 0024-2022-BROF,at 506 E MAIN ST,ASPEN:273707347851,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or a-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor Comments •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$830.42 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.cityofaspen.com/DocumentCenterNiew/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Have a great day, Risa Rushmore Email:Permit Fees Due:22-0292 at 506 E MAIN ST,ASPEN:273707347851 Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/2/2022 Days in Applicant's Hands Comments To:andyduckett-emke@andarch.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:22-0292 at 506 E MAIN ST,ASPEN:273707347851 Body: If you have not already paid the fees due on your permit 22-0292,at 506 E MAIN ST,ASPEN:273707347851,please log into the Aspen Permitting Portal to pay them. If you pay online,be aware that credit card ore-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$4,847.42 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.cityofaspen.com/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Emmy Garrigus Plans Examiner I City of Aspen Community Development Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/14/2022 Days in Applicant's Hands To:andyduckett-emke@andarch.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear ANDY DUCKETT-EMKE, Your Permit Application#22-0292 for 506 E MAIN ST,ASPEN:273707347851 is in the"Completeness Review Failed"Status because of the following: Hi Andy, I've just reviewed your application for the Courthouse Re-roof.Please provide the following to complete this application: 1.Valuation form:https://www.cityofaspen.com/DocumentCenter/View/2162/Valuation-Affadavit 2.Asbestos checklist:https://www.cityofaspen.com/DocumentCenter/View/2160/Asbestos-Checklist Comments 3.Zoningcompliance form:htt s://www.cit ofas en.com/DocumentCenter/View/2157/Buildin Permit-A lication---Zonin Com liance-Sheet P P Y p 9 PP 9 P 4.UL/ESR report specific to your roofing product and installation Additionally,since this is a designated historic landmark,have you spoken with a Historic Preservation officer about this project(Natalie Feinberg Lopez or Sarah Yoon)?Generally HPC will provide some sort of HPC approval documentation to upload with your application.Please confirm. Once you've uploaded the requested documents,shoot me an email or use the chatter function in Salesforce to notify me and I will re-review the application! Thanks,Emmy Please contact Emmy Garrigus with any questions at emmy.garrigus@services.cityofaspen.com. Thank you, City of Aspen Emmy Garrigus Plans Examiner I City of Aspen Community Development Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/14/2022 Days in Applicant's Hands Comments To:andyduckett-emke@andarch.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear ANDY DUCKETT-EMKE: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness TODAY.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the Salesforce portal,clicking on the`Related'tab,and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal.Just go into your permit,scroll down to the bottom of the page,and use the'Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see instructions below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email, but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the'Share an update...'box,type'@,'then start typing my name.My name will appear.Just click on it then add your message. Please let me know if you have any questions. Regards, PC-Comm Dev City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Emmy Garrigus Plans Examiner I City of Aspen Community Development Contacts ANDY DUCKETT-EMKE Account ANDERSON HALLAS ARCITECTS Type Applicant Active Contractor License Count 0.00 Number 0044080 Brian Young Account FCI CONSTRUCTORS INC Type Contractor Active Contractor License Count 1.00 Number 0044081 JODI SMITH Account Type Owner's Authorized Agent Active Contractor License Count 0.00 Number 0044721 Michael McLain Account FCI CONSTRUCTORS INC Type Representative Active Contractor License Count 1.00 Number 0044749 Fees 0070261 Type Use Tax Deposit-City of Aspen Amount $2,100.00 Waived/Refunded Amt $2,100.00 Discount$ Amount Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0070262 Type Use Tax Deposit-Pitkin County Amount $150.00 Waived/Refunded Amt $150.00 Discount$ Amount Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0070263 Type Roof/Repair Con Mit Fee Amount $805.42 Waived/Refunded Amt Discount$ Amount Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0070264 Type Roof/Repair Con Mit Fee Amount $805.42 Waived/Refunded Amt Discount$ Amount Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0070265 Type Roofing Plan Review Amount $4,042.00 Waived/Refunded Amt Discount$ Amount Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0070266 Type Roofing&Re-Roofing Permit Fee Amount $25.00 Waived/Refunded Amt Discount$ Amount Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time Files 506 E Main St City_Use_Tax_-_FRR_Notice_to_Contractor_20230119 City_Use_Tax_-_FRR_Notice_to_Contractor_20230119.docx Last Modified 1/19/2023 12:00 PM Last Modified 1/19/2023 11:58 AM Created By Emily Niederbremer Created By Emily Niederbremer 506 E Main St City_Use_Tax_-_FRR_Transmittal_to_Owner_20230119 City_Use_Tax_-_FRR_Transmittal_to_Owner_20230119.docx Last Modified 1/19/2023 11:58 AM Last Modified 1/19/2023 11:55AM Created By Emily Niederbremer Created By Emily Niederbremer 506 E Main St-0024-2022-BROF_LOC Final LOC_Letter_20230119.docx Last Modified 1/19/2023 11:54 AM Last Modified 1/19/2023 11:52 AM Created By Emily Niederbremer Created By Emily Niederbremer 506 E Main St.-0024-2022-BROF APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20220414.pdf Last Modified 6/28/2022 2:01 PM Last Modified 4/14/2022 4:01 PM Created By Savannah Pope Created By Aaron Reed Permit Application 2022-02-06 20:46:30.pdf Last Modified 2/6/2022 1:46 PM Created By ANDY DUCKETT-EMKE Inspections INS-0001599-22 Status Partial/Non-Complete Type Building-Midway Point Subtype Requested Date 7/20/2022 10:00 AM Scheduled Start Date 7/20/2022 Completed Date 7/21/2022 Owner Last Name Cline Permit Inspection Round Midpoint Inspection Closed TRUE INS-0003022-22 Status Pass/Accepted Type Building&Referral Inspection Status Subtype Requested Date 9/15/2022 11:51 AM Scheduled Start Date 9/15/2022 Completed Date 9/15/2022 Owner Last Name Cline Permit Inspection Round Final Inspection Closed TRUE INS-0003023-22 Status Pass/Accepted Type Parks Subtype Requested Date 9/20/2022 8:00 AM Scheduled Start Date Completed Date 9/16/2022 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0004275-22 Status Pass/Accepted Type Building Subtype Final Building Requested Date 9/23/2022 10:30 AM Scheduled Start Date 9/23/2022 Completed Date 9/23/2022 Owner Last Name Cline Permit Inspection Round Final Inspection Closed TRUE Milestones Review Round 1-0024-2022-BROF Status Approved Due Date Created Date 4/12/2022 Payments PY-013308 Related To 0024-2022-BROF Amount $830.42 Created Date 6/28/2022 Payment Source R-0012600 Receipt-Amount Remaining R-0012600:$0 PY-012232 Related To 0024-2022-BROF Amount $4,847.42 Created Date 3/23/2022 Payment Source R-0011641 Receipt-Amount Remaining R-0011641:$0 Permit History 1/19/2023 12:01 PM User Emily Niederbremer Action Changed Status from Ready for Closure to Closed-Final. 1/19/2023 11:51 AM User Emily Niederbremer Action Changed Owner from Sydney Fallon to Emily Niederbremer. 1/11/2023 3:06 PM User Savannah Pope Action Changed Status from Closed-Final to Ready for Closure. 9/23/2022 9:55 AM User Brandon Cline Action Changed Status from Ready for Closure to Closed-Final. 9/23/2022 9:55 AM User Brandon Cline Action Changed Status from Final Inspections to Ready for Closure. 9/23/2022 6:21 AM User Brandon Cline Action Changed Expiration Date from 3/21/2023 to 3/22/2023. 9/22/2022 5:58 PM User Michael McLain Action Changed Expiration Date from 3/15/2023 to 3/21/2023. 9/16/2022 1:06 PM User David Radeck Action Changed Status from Issued to Final Inspections. 9/16/2022 1:06 PM User David Radeck Action Changed Expiration Date from 3/14/2023 to 3/15/2023. 9/15/2022 6:20 AM User Ric Bennett Action Changed Expiration Date from 3/13/2023 to 3/14/2023. 9/14/2022 4:17 PM User Michael McLain Action Changed Expiration Date from 1/17/2023 to 3/13/2023. 7/21/2022 6:11 AM User Brandon Cline Action Changed Expiration Date from 1/16/2023 to 1/17/2023. 7/20/2022 6:35 AM User Brandon Cline Action Changed Expiration Date from 1/14/2023 to 1/16/2023. 7/18/2022 4:28 PM User Michael McLain Action Changed Expiration Date to 1/14/2023. 6/28/2022 1:59 PM User Savannah Pope Action Changed Issue Date to 6/28/2022.Changed Status from Ready for Issue to Issued. 6/28/2022 12:49 PM User Savannah Pope Action Changed Total Payments from$4,847.42 to$5,677.84. 4/18/2022 5:14 PM User Risa Rushmore Action Changed Status from Final Review Complete to Ready for Issue. 4/18/2022 3:11 PM User Denis Murray Action Changed Status from Final Review to Final Review Complete. 4/15/2022 5:04 PM User Sydney Fallon Action Changed Status from Permit Review to Final Review. 4/12/2022 9:29 AM User Emmy Garrigus Action Changed Owner from Emmy Garrigus to Sydney Fallon. 4/12/2022 9:26 AM User Emmy Garrigus Action Changed Number from 22-0292 to 0024-2022-BROF.Changed Status from Complete Pending Submittal Fees to Permit Review. 3/23/2022 2:45 PM User Risa Rushmore Action Changed Total Payments from$0.00 to$4,847.42. 3/2/2022 1:05 PM User Renee Espinoza Action Changed Total Fees from$5,827.84 to$5,677.84. 3/2/2022 12:58 PM User Emmy Garrigus Action Changed Total Fees from$7,927.84 to$5,827.84. 3/2/2022 12:51 PM User Emmy Garrigus Action Changed Status from Application Completeness Review to Complete Pending Submittal Fees. 3/2/2022 11:53 AM User Emmy Garrigus Action Changed Total Payments to$0.00.Changed Total Fees to$7,927.84.Changed Create Fees from false to true. 2/22/2022 4:30 PM User Emmy Garrigus Action Changed Status from Completeness Review Failed to Application Completeness Review. 2/14/2022 8:19 AM User Emmy Garrigus Action Changed Status from Application Completeness Review to Completeness Review Failed. 2/14/2022 8:02 AM User Emmy Garrigus Action Changed Queue Designation to IFFR&Roof. 2/14/2022 8:01 AM User Emmy Garrigus Action Changed Status from New Application to Application Completeness Review. 2/14/2022 7:43 AM User Emmy Garrigus Action Changed Owner from PC-Comm Dev to Emmy Garrigus. 2/6/2022 1:46 PM User ANDY DUCKETT-EMKE Action Changed Owner from ANDY DUCKETT-EMKE to PC-Comm Dev. 2/6/2022 1:46 PM User ANDY DUCKETT-EMKE Action Changed Status from Draft Application to New Application. 2/6/2022 12:59 PM User ANDY DUCKETT-EMKE Action Changed Valuation to$300,000.00.Changed Address to 506 E MAIN ST,ASPEN:273707347851. 2/4/2022 4:31 PM User ANDY DUCKETT-EMKE Action Changed Bluebeam Project Id to 030-835-630. 2/4/2022 4:31 PM User ANDY DUCKETT-EMKE Action Changed Number to 22-0292.Created. Reviews REV-023630 Milestone Review Round 1-0024-2022-BROF Status Approved Type Building Due Date Completed Date 4/13/2022 12:48 PM Owner Alias JHahn On Hold Created Date 4/12/2022 REV-023631 Milestone Review Round 1-0024-2022-BROF Status Approved Type Engineering CMP Due Date Completed Date 4/14/2022 4:03 PM Owner Alias AReed On Hold Created Date 4/12/2022 REV-023632 Milestone Review Round 1-0024-2022-BROF Status Approved Type Parks Due Date Completed Date 4/15/2022 1:18 PM Owner Alias DRade On Hold Created Date 4/12/2022 REV-023633 Milestone Review Round 1-0024-2022-BROF Status Approved with Conditions Type HPC Due Date Completed Date 4/12/2022 6:09 PM Owner Alias NFein On Hold Created Date 4/12/2022 Submissions 2022.02.02 Pitkin County Courthouse Reroof.pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 2022.01.31 Pitkin County Courthourse Reroof spec.pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 01 Roof-Reroof Checklist(PDF).pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 02 CH 2022 HOA Policy_201802011203338526.pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 03 Contact Sheet-signed BY.pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 04 Pitkin Permit Site plan.pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 05 Pitkin application RTC Photos.pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 06 PCCH Covid-Plan-Requirements.pdf File Actions Submission Date 2/6/2022 1:15 PM Status Description Required 07 PCCH CMP with comment response 7.25.19.pdf File Actions Submission Date 2/6/2022 1:43 PM Status Description Required 07 PCCH CMP ROOF-Updated 02.07.22.pdf File Actions Submission Date 2/9/2022 4:32 PM Status Description Required Roofing permit zoning.pdf File Actions Submission Date 2/16/2022 8:27 AM Status Description Required Asbestos Checklist.pdf File Actions Submission Date 2/16/2022 8:43 AM Status Description Required Asbestos Checklist.pdf File Actions Submission Date 2/16/2022 8:50 AM Status Description Required Valuation Affadavit.pdf File Actions Submission Date 2/16/2022 8:51 AM Status Description Required Firestone TPO ESR-2831.pdf File Actions Submission Date Status Description Required Tamko-ESR-1501-TAM KO-Asphalt-Sh i ng les-ICC-ES-Evaluation-775219.pdf File Actions Submission Date Status Description Required Firestone TPO ESR-2831.pdf File Actions Submission Date 2/22/2022 4:24 PM Status Description Required Tamko-ESR-1501-TAM KO-Asphalt-Sh i ng les-ICC-ES-Evaluation-775219.pdf File Actions Submission Date 2/22/2022 4:24 PM Status Description Required Copyright©2000-2023 salesforce.com,inc.All rights reserved.