HomeMy WebLinkAboutFile Documents.330 E Main St.0016-2021-BREP From:Sheldon Hoelsken
Sent:Thursday, March 11, 2021 12:23 PM
To:steve wilson
Subject: Fwd: Hotel Jerome entry repairs
Please see below from Amy as well here is the link to the scope of work.
https://docs.google.cam/document/d/13 ihJSAldOyq MG M H8a Uv727y1 Mw-
H5i6QiYg4iNWOs2A/edit?usp=sharing
SHELDON HOELSKEN I DIRECTOR OF FACILITIES
HOTEL JEROME, AUBERGE RESORTS COLLECTION
330 East Main Street, Aspen, CO, 81611
P 970.429.7664 F 970.429.7783
Sheldon.Hoelsken@aubergeresorts.com
https://hoteljerome.aubergeresorts.com
Hotel Jerome
4 R „ E AUBERGE RESORTS COLLECTION
ASPEN
Forwarded message
From:Amy Simon<amy.simon@cityofaspen.com>
Date:Wed, Feb 26, 2020 at 11:56 AM
Subject: Hotel Jerome entry repairs
To:Sheldon Hoelsken<Sheldon.Hoelsken@aubergeresorts.com>
Woohoo! You're back! Good choice. Q
In your absence,we did a site visit with Lance to look at the front balcony. Below is a summary of our
discussion. Let me know if you have additional questions.
1 Replacing the rotting soffit under the balcony.
05/04/2021
ASPEN
BUILDING DEPARTMENT
• It appears that this entire structure was extended during the 80's remodel and the soffit is
not historic material. On a larger note,there may be an issue with proper drainage that is
causing water to pool on the deck. The rotting wood should be replaced.
2. Replacing damaged rail cap on the balcony.
• Looking at historic records and building files, staff is comfortable with the rail cap being
replaced. Please note that the Building Department may have dimensional requirements to
consider.
3. Realign the letters on the side of the balcony that spell out"Hotel Jerome".
• Direction was already given that this may be realigned. The existing letters are not historic.
Please note that the proposed work will need a Building Permit. Please contact the Permit Coordinators
for more information:permitcoordinators@eityofaspen.cam
05/04/2021
ASPEN
BUILDING DEPARTMENT