HomeMy WebLinkAboutFile Documents.353 Pfister Dr.0057-2022-BROF (9) Storm Help
PRO
CMP for Storm Help Pro
Prepared by Hayden Spurrell on 6/23/2022
Project Manager
Project: Ashwin
Construction Management Plan
2.0 Project Location
See attached Sheet A
2.3 Description
This project will only consist of removing the existing wood shake and installing Decra Metal standing
seam 16" panels. Color is traditional black low gloss.
3.0 Project Documentation
3.1 Permits
All applicable licenses and permits will be obtained and maintained throughout duration of the project.
No permits have been issued at this time.
3.2 Public Notification
Contractor will send notifications to neighbors addressing project traffic and possible loud noises at least
10 Days prior to job start
3.3 Project Sign
See attached sheet C
3.4 Contact Designation
See attached sheet B
4.0 Project Implementation
4.1 Dates of Construction
RECEIVED
07/08/2022
ASPEN
BUILDING DEPARTMENT
Start Date is TBD. Shooting for Late July.
4.2 Hours of Construction
Construction hours will be limited to 7:30am to 5:30pm Monday thru Friday and 9-5 Saturday. No work
will be done on Sunday or City specified holidays
4.3 Sequence of Construction
The shake will be removed and the home will be dried in. We will then start laying panels
4.4 Neighboring Properties
Neighbors will be notified 10 days in advance to construction start date
4.5 Project Fencing
No fencing needed
4.6 Natural Environment
N/A
4.7 Wildlife Habitat
No impact to wildlife
5.0 Site and ROW Management
5.1 Parking Management& Right of Way
Three cars will be present during project. Parking will be in driveway or shuttled in. HOA has expressed
strict no street parking.
5.2 Emergency Vehicle Access and Ordinance 35
Contractor will allow at all hour access to the job site for any emergency vehicle
5.3 Traffic Control
A truck and trailer will be present for one day to drop material
5.4 Staging
Materials will be staged on the property and possibly the roof.
5.5 Waste Management
Native Waste will be used for our waste. Everything will be placed in a 40 yard container
5.6 Pedestrian Control
Job will not affect pedestrian traffic
5.7 Sediment and Erosion Control
RECEIVED
07/08/2022
ASPEN
BUILDING DEPARTMENT
N/A
6.0 Traffic Control
Half a day a delivery truck will be unloading while on the road. Cones and a flagger will be present to
direct traffic
6.3 Delivery
Delivery will take half a day
7.0 Fugitive Dust Control
N/A
7.2 Emissions
All vehicles on site pass emissions. An electric compressor will be used for our nail guns.
7.3 Noise Suppression
Noise shall not exceed 70 decibels as measured at the property line by a decibel meter. No radios will be
used onsite.
7.4 SWMP
N/A
RECEIVED
07/08/2022
ASPEN
BUILDING DEPARTMENT
Sheet A
®Map Aspen x } — 14 X
f -> C 0 8 https://dlyolaspe2'n. L,gis.can/apes/webappviewer/indeshlal?id=2e82f12cf1614081aa s)S35eac59f2fa 0
-- xe 353 PFISTER X'
nena for 353 PF .1°7 `ay.
/
0 ' ,
•
Z �. \ •
5 Number 353
III - Source Plat Bk 97 Py]a I /
Full Address 353 PFISTER DR
Junsdiouon ASPEN '‘,
Dare Last Edited June 20,2022 VI
S
rms.:user CayofAspenG/S
eared drte June 20,2022 I1
4 losledrtd_euser CrrynffupenGlS I1
1' •
Street PFISTER r
R Coy Aspen
S+rte COLORADO
Zmmm ...
» ____ esn
P II A ■ .a Fp - ^a. b 6mrz7,
RECEIVED
07/08/2022
ASPEN
BUILDING DEPARTMENT
Sheet B
Contact List
Project: Ashwin
Address: 353 Pfister Dr.
Jobsite Phone #: 970-389-3374 970-618-0118
Contractor: StormHelp Pro 970-927-6472
Project Manager Hayden Spurrell 970-948-6543
Safety Officer: Hayden Spurrell 970-618-0118
Pitkin County Community Development: 970-920-5526
Aspen Fire Dept: Non-Emergency: 970-925-5532
Aspen Police Dept.: Non-Emergency: 970-920-5400
Pitkin County Sheriff: Non-Emergency 970-920-5300
RFTA: 970-920-1905
Aspen School District: 970-925-3760
Holy Cross Energy: 970-945-5491
Source Gas: 800-569-0012
Century Link: 800-244-1111
Aspen Valley Hospital: 970-925-1120
IN CASE OF EMERGENCY CALL 911
REcEWED
07/08/2022
ASPEN
BUILDING DEPARTMENT
Storm Help
PRO
Sheet C
StormHelp Pro
Hayden Spurrell
Contact #970-389-3374
Emergency Contact #706-853-0305
Emergency Contact #970-977-9568
RECEIVED
07/08/2022
ASPEN
BUILDING DEPARTMENT
Site Plan
+ _ PFs-FF DF. X O
L
r
. . - It -:...,, dr: .!.,*; \ ----,,,
11 ��, �.
, (-4-•• - -- - •.." \::' ,
1: ...I..- \
.‘,
19G Degree
.. ;>r ,ham _ is_ �,m 3 esrI
Red Lines are where material will be placed
Blue box will be toilet
Orange will be dumpster
White will be parking
RECEIVED
07/08/2022
ASPEN
BUILDING DEPARTMENT
CMP Proof
(Did not receive copy after completion of test)
Construction Mitigation I Aspen. X 4 Construction-Mitigation-Plan-M X ++ Submission Confirmed—City of X i Resou': } 0 X
C I cmpaspen.com/submission-confirmed/?id=c6d930ce3a88580fbe9ad0e1d1cd037b
First Name Hayden Spurrell
dri6
'1 N Last Name Storm Help Pro
`I,1, Email haydens@stormhelppro.com
I1E►
Phone 9703893374
CITY OF ASPEN IPAddress 97.122.163.40
Score Obtained 95.0 out of 105.0(90.5%)
Overview
Introduction > Passed
Designation
Paperwork > You passed!Your Certificate is attached.Please print and submit with your CMP.
Site and ROW
Completion Time 7 minutes,47 seconds
Noise Suppression
Administrator Remarks Processing
Additional Requirements
Course Review User Account Guest
Final Exam Link https://cmpaspen.com/submission-confirmed/?id=c6d930ce3a88580fbe9ad0e1d1cd037b
Correct answers are worth 5 points.
O True
(Score 0)
Once a CMP is a.'roved,the site is exem.t from an new or
® P Type here to search Q o; q x ^ w n • (4 cin 1:10 cf. 9:26 PM I
10/1/2020 it
RECEIVED
07/08/2022
ASPEN
BUILDING DEPARTMENT