Loading...
HomeMy WebLinkAboutFile Documents.630 W Hallam St.0008-2021-BROF (4) AJAX ROOFING COMPANY CONSTRUCTION MANAGEMENT PLAN 630 W. hallam 04/01 2021�10 06 28 AM y ring ASPEN, CO "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of 1. General Aspen.The review and approval by the City is offered only to assist the applicant's 1.1 Total Project Demo — 1425 SF of roofingmaterials understanding of the applicable Engineering j requirements.'The issuance of a permit based 1.2 Table of Contents on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction 2. Project Introduction documents and other data. 2.1 No soil disturbance is anticipated 2.2 See Attachment for Project Vicinity Map 2.3 Description of work Includes removal of tar and gravel roof. Install membrane roof. 3. Project Documentation 3.1 Permits Roof Permit Only 3.2 Project Notification A letter of explanation of the project will be given to all neighbors including two phone numbers if issues arise. 3.3 Project Sign Project will last less than 30 days so no sign is required 3.4 Contact List Roof Contractor—Ajax Roofing Company Lyle Cox 970-901-1762 Brady Emens 987-3932 4. Project Implementation 4.1 Dates of Construction Start approximately December 1st Anticipated schedule is 1.5 week. 4.2 Hours of Construction 8am — 5pm Monday through Friday 9am — 5pm Saturday (weather dependent ) 4.3 Construction Schedule Removal of Existing Roof: 5 working days New Roof: 4 working days 4.4 Site Fencing No site fencing is anticipated as the work will only be on the roof 4.5 Site Map for Trees — N/A 4.6 Park Issues — N/A RECEIVED 03/31/2021 ASPEN BUILDING DEPARTMENT AJAX ROOFING COMPANY 5. Project Management 5.1 Parking Request We will park on the road with permits. 5.2 Emergency Vehicle Access 5.3 Construction Parking Details 5.4 Staging Area No construction staging will be necessary 5.5 Construction Trailer, Materials Storage, Waste Management No trailer or material storage will be necessary. 6. Traffic Control — Not Applicable 7. Pedestrian Protection — Not Applicable 8. Sediment and Erosion Control — Not Applicable 9. Fugitive Dust Control — Not Applicable 10. Emissions - Agreed 11.Noise Suppression The only tools we will be using are hand tools. No electric or gas tools will be used. RECEIVED 03/31/2021 ASPEN BUILDING DEPARTMENT