offered only to assist the applicant's
1.1 Total Project Demo — 1425 SF of roofingmaterials understanding of the applicable Engineering
j requirements.'The issuance of a permit based
1.2 Table of Contents on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
2. Project Introduction documents and other data.
2.1 No soil disturbance is anticipated
2.2 See Attachment for Project Vicinity Map
2.3 Description of work
Includes removal of tar and gravel roof. Install membrane roof.
3. Project Documentation
3.1 Permits
Roof Permit Only
3.2 Project Notification
A letter of explanation of the project will be given to all neighbors including
two phone numbers if issues arise.
3.3 Project Sign
Project will last less than 30 days so no sign is required
3.4 Contact List
Roof Contractor—Ajax Roofing Company
Lyle Cox 970-901-1762
Brady Emens 987-3932
4. Project Implementation
4.1 Dates of Construction
Start approximately December 1st Anticipated schedule is 1.5 week.
4.2 Hours of Construction
8am — 5pm Monday through Friday
9am — 5pm Saturday (weather dependent )
4.3 Construction Schedule
Removal of Existing Roof: 5 working days
New Roof: 4 working days
4.4 Site Fencing
No site fencing is anticipated as the work will only be on the roof
4.5 Site Map for Trees — N/A
4.6 Park Issues — N/A
RECEIVED
03/31/2021
ASPEN
BUILDING DEPARTMENT
AJAX ROOFING COMPANY
5. Project Management
5.1 Parking Request
We will park on the road with permits.
5.2 Emergency Vehicle Access
5.3 Construction Parking Details
5.4 Staging Area
No construction staging will be necessary
5.5 Construction Trailer, Materials Storage, Waste Management
No trailer or material storage will be necessary.
6. Traffic Control — Not Applicable
7. Pedestrian Protection — Not Applicable
8. Sediment and Erosion Control — Not Applicable
9. Fugitive Dust Control — Not Applicable
10. Emissions - Agreed
11.Noise Suppression
The only tools we will be using are hand tools. No electric or gas tools will be
used.