Loading...
HomeMy WebLinkAboutFile Documents.330 E Main St.0016-2021-BREP (4) TK MEMORANDUM To: City of Aspen Date: April 27, 2022 Community Development 130 S. Galena Aspen, CO 81611 From: Nathan Torres, PE, Principal Project: Hotel Jerome TK Engineering Consultants, LLC 330 East Main Street 1015 W. Horsetooth Rd, St. 203 Aspen, CO 81611 Fort Collins, CO 80526 Subject: Removal/Replacement of Deteriorated Beams in Front Entry Porte Cochere Scope of Work During routine Spring maintenance it was discovered by a subcontractor and Hotel Jerome Staff on April 20, 2022 that the east timber girder carrying the deck/roof joists of the Front Entry Porte Cochere was badly deteriorated. Hotel Jerome staff immediately contacted TK Engineering(TK) as a licensed Structural Engineering Firm to come to site to observe existing conditions and propose a remediation solution. On April 21, 2022, TK met with City of Aspen (CoA) staff from Engineering, Community Development and Historic Preservation. Additionally, personnel from Aspen Constructors (local General Contractor) and Sheldon Hoelsken (Hotel Jerome Director of Engineering)were in attendance. The existing deteriorated conditions were reviewed up close by TK personnel from a ladder and it was noted that the south end of the east beam has failed and crushed approximately 1/2-inch. The north end of the east beam did not show significant signs of deterioration. TK inspected the west timber girder and observed the initiation of deterioration at the north end. Of what was observable the south end of the west beam appeared sound. In coordination between CoA staff,TK, Aspen Constructors, and Hotel Jerome it was decided that both the east and west timber girders would be removed and replaced. Of note the following conditions/terms were discussed and approved: 1) All parties in attendance agreed that this would constitute an "emergency repair" and needed to be addressed as soon as possible. The hotel reopens on May 25, 2022, and would like this work completed on or before May 20, 2022 so as to allow hotel staff time to prepare the front entry ahead of reopening.Aspen Constructors will clean all construction related debris from the site and return the area to preexisting conditions prior to demobilizing from site. RECEIVED 04/29/2022 Page 1 of 3 Hotel Jerome - Front Entry Repair ASPEN BUILDING DEPARTMENT 2) All visible trim,flashing, and historic architectural features are to be returned to their preexisting condition. Aspen Constructors is to 'surgically' remove any metal flashing or historic trim features so that they may be replaced at the end of the removal/replacement of the affected timber girders. 3) CoA Engineering will work directly with Aspen Constructors on a construction management plan and divert pedestrian traffic around the porte cochere, through a protected barrier to be located in the parking spaces immediately south of the hotel and back onto the sidewalk. a. Aspen Constructors will drape the (3) exposed sides of the porte cochere from roof level to road level so as to provide visual block and a safety barrier for passers-by around the porte cochere. 4) Aspen Constructors is to lay down ground protection to protect the bricks at the front entry of the hotel. All scaffolding, screw jacks,temporary shoring walls, etc... are to bear on a material that will not mar, scrape, or otherwise damage the sidewalk surface. 5) TK personnel will be on site during removal of the existing timber girders and replacement of the new W8 structural steel beams to ensure all elements are removed and replaced per the engineering drawing attached herein. Attached to this memo are a series of photos showing the existing conditions. Additionally, attached herein, there is a repair plan that will outline the proposed remediation action for the deteriorated timber girders. RECEIVED [Continued on next page] 04/29/2022 Page 2 of 3 Hotel Jerome - Front Entry RepatiFL\1 BUILDING DEPARTMENT Liability Statement This memo provides general assumptions by TK Engineering Consultants, LLC for work to be completed by a licensed, bonded, and insured General Contractor in the State of Colorado.These recommendations are strictly limited only to items of work and components of the subject building specifically discussed within this memo. The Contractor shall be responsible for all means and methods of construction including forming, connections, lateral bracing, and shoring. The Contractor shall undertake all necessary measures to ensure safety of all persons, equipment, and existing structures at the project site. Observation visits and/or inspections by TK Engineering Consultants, LLC will not include recommendations or review of these measures. The Contractor is required to take precautionary measures to protect any and all utility lines including those not on record or discussed in this memo. The Contractor shall notify the Owner and Engineer immediately of any changed site conditions. Closure This memo is for the exclusive use of our client and is not intended for any other purpose. It is based on information made available to us at this time. Should additional information become available, we reserve the right to determine the impact, if any, of the latest information on our opinions and conclusions, and to revise our opinions and conclusions if necessary and warranted by the discovery of additional information. Please let us know if you have any questions or concerns regarding this project.You can reach me via phone at 720-936-8787 or by email at natetorres@tkengineering.biz. Respectfully submitted, TK Engineering Consultants, LLC Principal r oPP . LlCF4/s 111 or •�\GHA�C•�•�O 1'I : I119�••.•• •<4.,< � April 27, 2022 Nathan Torres, P.E. RECEIVED 04/29/2022 ASPEN Page 3 of 3 Hotel Jerome - FrontU { �e i MENT �' rb North Ittriv ,^. 4 I f ,. f4j // i/ The two 6x11 rough sawn girders are , to be removed and replaced with / r'� W8x21 steel beams. az.,------illa „IliO fel 11F,4 n(11, 1 \/' . '‘..........."Trawrim, __ L j‘Tril twill _LI j1 ,_, ram. _ o _40.111. 1 �" — / ,.T __ i if' \ !, 4 *. -- ivt-, _- _ _ .., .. , ,. . . =- .__ __, /4.,,.-., .: --.11, te - ', ,...., __,......____ _ __7. . $ \ . A ' Ja_ } 1i / q se • A/ p,�/. ' n ai r/ ol(J(Mr mo ' ye. tea. r w �r:,;l� li \ `,, •_ - _ ' ✓ �I rrJ r r t < `LS�t s" , L r ,ts� r., ti fu d k /�. d r I to » Jai--r t �� A/z -..J/.r`�•",, .1 „ ., , /�a ,,,„ ,u, ,. ,...lctt :s'C'f } +ELF' 'a' .`f -�i Ir,• �� \" \ r `n'}`'�l.. c 1 .'�Y. ,ar'r.}t'%j,eya''!r_ r 7'��'' .�+.�iP� .? r n&':; ',f i 1 i.i.a x > , 'T }`.r ` �-+ �1 ' r S i.•SS�w9.eY'„ (lam r,r`_':. ..-,A,,, r a. a r - r k<. .\ it' ',7 e\ i•,,,Y, J 1 7 ll ri ��� p 4 s- V' ,e s- 1 f{ ;.d-}jt$� "A's `iA�' `\a.; � `6• S,q }1��ft�r'{'•4l ��pd�••..f.:,f r ¢ „ "*tr, ., ., �.,F'r '�� - i.r. `4 '�l� _�� Ana {_..... aw I .'. 19 t � �' r i�i� -- �7 q + .'t5.. i � 7• 1 _ �'6•em s L /� n� k 1 t PF� p ''� I� ' CIF, ,. .. 1 Y'�,. ". .a � � a �i. / • !f { 9 �d� V . y, .T is � 9, P� T'lam/ / _ .4 �,r , y� `.#r, .- -1' i i I'1 E��C¢:'4.k $ :�rA � n f ,,,,, y,':f k OP ... i `as d•.+ ~'df �--r { Q r, ir �,1l, tA dtq �:'...'.J� g4r`'oe + ! .r� y ,r';14'-.,� ., 4.-,,,..4, �. g �.,,�. " Iii R� ,. T � ry'I �—' --e,-. r $ _� i 'Y,�r f ,+ \+ x2Fay 4„-,;' 2V'" ,' "•^ - y614. { �` mmrrrn p_. 8 ' r A. �:L• 'ti; ? is• �� ',N.l�.. ^--`f r�I!'^, _q=' E�,':l , •_���y� =: p,! �6_ Vf ra' .5 v5 K` t �.; . - 11 a — r I B I', - - Deteriorated condition -..--. .-...of east girder at south • bearing point. - _ -__� • • • • ��V "'ice - J- - _- tom �� - o� -.^e;.e ate"`+ • t_. . t i i. . 4. VIII C : .., It „ • 1 • _ F r ". oL - F r ih, 1,, ---_,-.,.:4\ :. IP, I - ' l‘itiJ I � f.. .„!..,* Itie \ i.-:/...,i, r_.; • I. rfr r ‘ • .. . • • im . RECEIVED trr 04/29/2022 II 1110e•-".'''..- Oil i . . IV t ..it•i -- ''....',.:-. . . ...., - •- •r•.,• .,'. „',.•",-;',‘ktk, , +,-,-,,,,''..,..' .,', ,'-,' '!',1',.'..,?.',7:1:'.-%-,,,,,,:.';':-!!1..:,.,-:,-,'L',...,,,s.,..4 4:•.=,. •' ',i'...cs.!-,•;,:•,,,••,-„,,,. i'. ...•q,1,...,-,:;,..1,-,-. .-.,:21.•.'..z,-,9..,.;,.. ...:.;;;;‘,:::•:. ''..'.;,-^2,'...y,-.ik:1--,"': :". • • ---"."--:"'•,';•: • ••••••• • . ' ,,,•,•,' ,•--"::iA',,,r,--•;.t...::: ",- SI'.•41. I 3•-fi•. • . .. . . --•. i,,,;,.. .... k-.,:, , .,,;-;,."',,,r..,-,;..'''',-.,,,,',- ,.—',,,,..",,,It.''.-9,2'4 •-- -?•-•'-;--r"-.-1. ,,..,,,, , ..:. _ . , - -•::.„4:,,V.,-.•,•..,'....,.. ','...-: ',.: ••••.',.I.;.: ' z <-e.',,,,•42.!.....-. :fie-.,:t.'1,1k,_ .','0,1;\ -'4' • ,---.- .si . ',-; • ..,a.,..,-..s_ .,-,:. .-.. . ': :-..-4•.f..- .•/:—.11..,.„ :,.„, .„..-.1.,...•_:Trt::_.,, , ,-,....., .,,... • A'-i-r-,,:..,,,_•,••''.•••:,,,•4*.'.-y::‘•- ,.:,,•,•-•Tir''',..:',',":;,',',.--.,4N•••••." •,,..".'f,.1:'',.-;•-.'24,1tif.';'1;:,.i-- , . ' _...,:pY';."-• ',"-K, -,.`;•"',' - %. •v-;:"-"`",- -''..--0,-'•-,'''.' -44::','.:- • •d.;;7'-' •••''i- ., , ''''',I,1„;,"... .-;,.',ilys,-..''' f ••' ..''''''t..;'•,. .‘`-'i. '-`''',u, " '''''''.',\''''..'. .<;•••'1,•'+'.!; ,•..'',''..-'.'...).'''''''`'.&;-•.‘.'',' •. ,.. ' „ . .. ''t...'4 , . ' -, . . . . . -,....,. • '''' ;14. -;.' '''.:'•*'• -1^- -- ''' •?, • ,• J , ,••-.-'.1. ----,t,•.:3..-..- ••••'..-....'4.... 4', .4'"--•„..4.,-,,',•,.-.'.-:-=,.7.*:',,.-', .- - . .... ' ''-,-;.-`-i,. , -••-IV'.:.'-•.• •'•: 'f'..;:,:por,.... '--,• •',..-...-3....s,..''.-- '-..t..s•'.6Fct4 4k--'7,,;';.;..:', :., :--, . , 7'.:'''''‘'':Vr...*-; ';•',•,..,..t.•'..',::,.."::'`.'.-'•;!•',-•1.•:<-A t'Tiit‘A,'::'',:-'- .' ', ', ••-•,.. . . . , . _,,.., / ''..':f.-,',. . '...-:';'...?.[;: '....,. .--2;-i-,.N.,, .- ..-$4,-; •P.:„.',.,,, -..; ,,,,...• - ,. '. '''''...6:'-',',.'2:„.. .,1,t....i?i,<-, . ':,...;-;-•••'..,-,,•ittii..'•......I,••:„,-,,..-.4: ,,,f-, .•.•,k ,-•„,: . -•,..• '•,•:. .. ,., . , "...: , ,.:2,., Deittoetreiodraattionnorhtahs in -.,-.:1;,k,,•-..,..,,..- ,.. ,-,.,.,•-•••!,•,,,•.:, ..*•-- ‘,,,-.4r,:„...-•• '.•-•-:- N: ,i,,, ,-,•.. '$1,....-:,:, i,' ,-, • • ),., ,., ., :. .: ' ' ' , r ''''',,,T.4.k .,::''.,;',.,, ..,12,-7-..„ -:::, .• . --.-: ',. -, -,r.,s,,, ,..'Li. -,. •• - ... .,-r ',: ......; ..--'..;,''.1...,.-..,: i -4Pf-i-r--..... -.. •.-,,'.,1,-... ,•:!;,,. . .....1.1-i,Y••,,. :„ ..<, '1, ..: .••-„,-,:t-f •',,,..<.,,,,,i -..„.,.„. ,. „if ,, ..,,,,.,,„,..,;. -_._,-. , . .;,-, „.-......: bearing of west girder. . .., „,,, ,.:-.1%., ,... .......,,-„,,,, ,•v, - •••••,,,, i;-. ----',-.\i, 'ifi\-N''''\:. ... • . . ,---.. .-. -,„,.,..:. ,,,,•,:-.. •--,... -.-, . ,,„• ;:s...........- ?..4., ' .',,,\\,.•-•',-,.t1-1... :WI . , ;-.- - -,,...,::•'., ,, „,,,,.,,s,:•;;;..... c4.;',,. N.,,',,, ..".. ,„:, .''',,,;:.it. .i',I. ..." . .-N 0.,",'••:-..-\ "' ,. J- • . • ... -. . ''--,;;•,:: .,, „ '-•,, :•st., -.•,...%4,,. s•t::,.. - ,....t., ,8:,.. ,..!5. s-..51.-_%,....;,..:• .•„, ..,,,,.0 . .. . ,, . •, .'s6-z.- • • ....,i7::?... ,,' '; '. •.;; ....- ;„ ..'-'ki;Ort• „ ‘‘,11/4,,,,.'!..... ' . . ,• . • , . . . ,. ... . .. . . , . •., t . . . , . ..„-•,..,,..;•. '.'1'.','-"k'., • .,•. ...... .- • • • . . .. , 'Y'' . , ,.,--• .-•-,..-•;.•.- 1.-‘5_,_.„:.-,..,, .....-.,, •.: . , , •,.. ,,,... , < .• . -44, 11/4,‘ . , „.. .. . . # ' • . • N.:7:-•-•',.--,,..•,- • s4.--, '-'''_ . ` •, . , . • •-....*';...- M,2•.,•,,, , , • -,`-- •::•'•-.•,-i:•.:-..v,",,,•-•?-eoes,-....- 0••-- - - • --" - • v•.,01-1t,..- . ,..,,,,... - ".- "•-,-.- , -. .„..„,.. ‘-. •.-.. , .;-..-ze:1:.-,2%•;;',•"'-.";i•'---::,Wititir&,-,• . -:' 1:':11.'''5'''... '.- _........ *...dit,,,,, Ns .. : ' '-","s...'!'-.' '.. .-.-L.:F,•,- .-.- • ,.....'-'.-',,7k--•-•%1';-.,:•rsi41,,4.*;-'.,-;,".,...7",ft,:t-t. '''V-t'.•.,-- :'•-•'-'4';''''. - .49'..ik,,v,-,1,•,.k..? ... :,-.-..'.'...-:.4.5•147k;••••,-t.:•,.----,.k.!..,.-,• • . - -•!..,;),...:. , .4..,<.....,t-‘1 ,4 .....,,,,,,.,i..,.--.....•.•••,••,.. .,-•.: .„-;•".-•-•. ' ,...,- ....,.., . .,.,. • .. . , .. _ • -- . •.. •-• . _. • ..; . .. . . ,....._.. ....„ ...' ---.. . . . , . •,-,. - - , • • ,.— . . ..,•• - ....I_ •„, : - • ',,,,-,-.••<•t . . ..4s-,v.' '- ' .. • ,... ___ . , , -. .. — .glir''. 'r-"--. .'7‘;-- -s""---... .40......--. - ,..._:_. ::- .-•-• ....,_ ., .,. . .4_, ..',-,• 111.11.11 .......... '• -• W' ,. -. ...._ ....,_ - ... ,• '-e '—- ;--•`••`•.. ..WIIIIIIMMIIIIIIN 411111r.:.. atIr ''''' . ,, •,,,f.',"'4--i..'•• Y, ..t. -,• '7 . -..,..-____ -_ _._. , ... —.._. ...-._. . „ . ....----...... _- __ -------•-••••...... ....~.0., NPI-el-LailiimMININIMPION1 ' a,,-- • • ,, . ._Y 1‘, : • , _ ' ... - 4 •'1 ' ,•_________,,......—„, , ,, . _.....•-• -`• "kaa.01:24 . ; • . .....„_4.--..., --......Art , .._ ...., ,,, ,... ..-.2?):•-•:•-re . , . _ ..., --...... • , • .. ,s. ,.- —,-,;---• .,.. ,i•.., ,,,, \ . -. - ' `:!‘,,4:•1., L . • .. ) — .. . - •- . . , . fr, — , .. ,• •,... • .. -,.... , - RECEIVED ... , ,. . • . k . •,,..,.. • , ' '• :•-•'e- •k' • -•_,-AP'•,..-- •• - -.. - k 9 .••.', , , .,,-t.\'), - - BUILDINAGni.i ., . i l'. '1 , ' !' ,' r n.1 • . '. %..',. ' ,' •': !,:2, :.; ,'.. '..•'-i: , -.. 'I- . • r' ... • ,•• • t•i , •i.. •' 4141r.146 - . ..... . , , 1 4.le. ' '• . "'"4-'-': - ' ....-',.;-4,,ifr' :,!... -.'' - ' • • A ' , - .:.'=.- - ',a • ....-.." 'A -=1 . . , . . . 'i 4,-. 1' • -'..". * ... ,. . • ./4'. 11. ,• -. • NORTH EXISTING DEL 2x 12 JOISTS TO REMAIN FACE OF HOTEL ALONG MILL STREET EXISTING NOM. 6x 11 IIIIII IIII RS BEAM TO BE N I REMOVED I " JOIST BRG = CRITICAL ELEVATION TO HOLD 2x6 TOP PLATE RAM SET TO TOP OF W8 1. Design and construction shall be in accordance with the requirements of the -TOP OF COLUMN CAPITOL = International Building Code, 2015 Edition (2015 IBC). Loads used in design are FIXED ELEVATION TO REMAIN as follows: t12'-3 FIELD MEASURED PACK OUT WEBS OF -Deck SL = 100 psf ✓ W8 W/2x MATERIAL LENGTH OF RS TIMBER BEAM < TL'S TO BE PLACED -Deck LL = 40 psf TO FACILITATE BTWN BOTTOM FLANGE -Deck DL = 12 psf RECONNECTION OF OF WS AND TOP OF END BRG OF WOOD GIRDER -Wind pressure based on 120 mph, 3 sec gust, Exposure C = APPROX. OF CAST I WOOD TRIM ELEMENTS COL. CAP TO MAKE UP -Seismic DesignCategory ory C TRIM ELEMENTS REMOVED IRON COLUMN TO REMAIN 2X FILLER PLATES AND REO D ELEV.. DIFF. FROM DETAIL FOR CLARITY 2. All steel shall be ASTM A992, Grade 50 for W shapes, ASTM A36 for plates & bars, and ASTM A500, Grade B (fy-46 ksi) for hollow structural sections. Anchor bolts shall be " diameter ASTM A307 with 7" minimum embed unless I I 2 - i"DIA. COMM. GRADE noted otherwise and spaced at 4'-0" o.c. w/ a min. of two anchor bolts per SIZE AND PROFILE OF COLUMN - 1 PER FLANGE CAPITOLS AND COL. IS APPROX SOUTH BEAM END TOGGLE BOLTS (1 section. Anchors bolts spaced a maximum of 12" from corners. Framing AND FOR ILLUSTRATION ONLY. DRILL TOP OF CAST COL CAP. connections shall use ASTM A307 bolts unless noted otherwise. Beam to beam 12'-3 IS TRUE FIELD BRO CONDITION INSERT TOGGLE BOLT AND SET TO SNUG TIGHT. PROVIDE BEVEL connections shall be fabricated in accordance with AISC Manual of Steel MEASURED DIMENSION WASHERS ON TOP SIDE OF W8 Construction Table IIA. Connections shall be designed to support the reaction FLANGE as shown on the drawing, or , the total uniform load capacity of the beam EXISTING CONDITIONS (AISC Manual of Construction, Section 2), whichever is greater. For wood ledger plate connections to steel beams, beams shall be provided with 9/16" dia. holes staggered at 24" o.c. in the top flange, unless noted otherwise. All stainless steel shall be ASTM A304 or A316. All welds shall be made by on AWS Certified welder with E7018 electrode in conformance with AWS 01.1. 3. Wood framing shall be connected in accordance with IBC unless noted PACK OUT WEBS OF WS W/ otherwise. Materials shall be as follows: 2x MATERIAL TO FACILITATE 2x6 TOP PLATE RAM -Rafters, headers, joists, studs: Kiln-dried Doug Fir, #1 Grade or better NORTH RECONNECTION OF WOOD TRIM SET TO TOP OF W8 -Pressure Treated: P.T. Doug Fir, #1 Grade or better ELEMENTS (REMOVED FROM -Log beams: Doug Fir, #1 grade EXISTING DBL 2x 12 THIS DETAIL FOR CLARITY) -Timber beams: Doug Fir, #1 grade. (no knots in bottom 1/3) JOISTS TO REMAIN „ „s„ -Deck Joists: P.T. DougFir 1 Grade of better. FACE OF HOTEL ALONG 3 2 x3 2 x4"ANGLE ANGLE # MILL STREET LEG AGAINST BLDG WALL TO HAVE SS HOLES ORIENTED VERTICAL. 4. Dimensions are to edge of framing or concrete, unless noted otherwise. All ANGLE LEG AGAINST W8 WEB TO discrepancies shall be brought to the attention of the Engineer and Owner prior NEW W8x21 W/ HAVE LS HOLES ORIENTED HORIZ. to construction. II2x TOP PLATE i" 1C S TO BEAR HOLES IN BEAM WEB TO BE STD. IIII IIII DIRECTLY ON TOP OF y 1-1 SIZE/SHAPE USE (2) DIA. 5. It is the responsibility of the Contractor to coordinate construction with all ^ 9 EXISTING BRG AT COLp BOLTS INTO BEAM WEB/ANGLE equipment and utilities, and verify sizes and locations before construction. V` i V " _ _ CAPITOL. W8 TO BEAR JOIST BRG = FIXED ON a" TL CONNECTIONS ELEVATION TO REMAIN 6. STABILITY DURING ERECTION.: Framing is not stable until all framing, 11111al connections, floors, and roofs have been installed and connected in accordance m NORTH BEAM END with these plans and the 2075 IBC. It is the responsibility of the contractor TOP OF COLUMN CAPITOL = BRG CONDITION to provide temporary bracing to stabilize framing until the structure is 11 FIXED ELEVATION TO REMAIN complete. 7. All floor joists are to be blocked at bearing and mid points. ±12'-3 a" FIELD MEASURED LENGTH OF RS TIMBER BEAM 8. Contractor is to give TK engineering consultants a minimum 24-hour notice before the existing timber girders will be removed. TK will be on site and I I photograph existing bearing conditions and provide direction as necessary if 2X FILLER PLATES AND conditions deviate from what has been assumed and detailed to date. TK will END BRG OF WOOD GIRDER TRIM ELEMENTS REMOVED notify City of Aspen Historic Preservation Staff with site observations. = APPROX OF CAST FROM DETAIL FOR CLARITY IRON COLUMN TO REMAIN RECEIVED SIZE AND PROFILE OF COLUMN 04/29/2022 CAPITOLS AND COL. IS APPROX Once timber beams are removed ASPEN AND FOR ILLUSTRATION ONLY. REVIEWED FOR and final plan for anchorage at the BUILDINGDEPARTMENT 12'-3 4"IS TRUE FIELD MEASURED DIMENSION COMPLIANCE exterior wall is determined, 04/29/2022 natalief coordinate with HPC and building ` s _:Poo ucE`,_;. PROPOSED CONDITIONS to ensure approval prior to making 09/29/2022 12/ ;; i c""^ c; ' BY HPC , any alterations or connections to just`E'"w' '���� 43 80 m existing historic construction. I,, y:�; '1ONAI�N s A9/ April 28,2022 TK ENGINEERING CONSULTANTS, LLC i . to l Jerome FrI n,t .rte Ca c ere K / •TK i 1015 WEST HORSETOOTH ROAD, SUITE 203 330 East Main Street er ency e airs FORT COLLINS, CO 80526 Aspen, Colorado PHONE: 720.689.3690, WWW.TKENGINEERING.BIZ A ISSUED FOR CONSTRUCTION NMT / 4/28/22 REV BUDGET ORDER CHANCE DWN CBKD APPV DATE DATED: April 28, 2022 SHEET