HomeMy WebLinkAboutFile Documents.700 Castle Creek Dr.0067-2022-BROF Reviewed by Engineering
08/24/2022 8:23:57 AM
"It should be known that this review shall not
Pacific Sheet Metal Inc. Manufacturing relieve the applicant of their responsibility to
O comply with the requirements of the City of
80 Gemat Circle Aspen.The review and approval by the City is
offered only to assist the applicant's
970.963.6563 Phone Rifle, CO 81650 understanding of the applicable Engineering
requirements."The issuance of a permit based
970.963.6564 Fax on construction documents and other data shall
ROOFING not prevent the City of Aspen from requiring the
www.pacificsheetmetal.net MailingAddress• correction of errors in the construction
documents and other data.
Post Office Box 70
Carbondale, CO 81623
Construction Management Plan
700 Castle Creek Drive,Aspen, CO 81611
1. General
a. No soil to be disturbed
2. Project Introduction
a. No soil to be disturbed
b. See attached map
i. This project encompasses s Berridge Standing Seam Metal re-roof, Class"A"
fire rated roof assembly.
3. Project Documentation
a. A building permit will be required for this work,no#received yet
b. Pacific Sheet Metal sign to be posted at front of 700 Castle Creek Drive.
c. Contact List
i. Contractor: Justin Labier,Asepn Constructors,970-333-6749
ii. Sub-contractor: Pacific Sheet Metal Inc. 970.963.6563
iii. Site Supervisor: Dave Hofmann 970.948.2567 dave(a,pacificsheetmetal.net
iv. Safety Officer: Dave Hofmann 970.948.2567 dave(a pacificsheetmetal.net
v. Traffic Officer: N/A no traffic will be affected.
vi. Erosion Control Rep: N/A no soil disturbed.
4. Project Implementation
a. Dates of Construction: October—December 2022.
b. Hours of Construction: Mon-Fri 7:30 AM to 5 PM
i. Saturday work as necessary to meet project timeline, 9 AM to 5 PM
c. Construction Schedule
i. Tear off existing roof metal roof
ii. Install Carlisle WIP 300 HT Ice and Water Shield.
iii. Install VersaShield.
iv. Install related flashings using 24 Gauge Berridge pre-finished sheet metal.
v. Install Berridge pre-finished metal standing seam roof,Matte Black.
vi. Final detailing and close out of project.
d. Project Fencing
i. No soil disturbed,no work over public ROW
5. Project Management
a. Parking Management: public parking on side of street.
b. Project Management Map: See attached map.
i. Materials to be staged on existing roof and in driveway.
ii. Trailers and Man Lifts not used.
iii. Waste to be managed via dump trailer in driveway.
iv. Materials to be disposed of and recycled.
6. Traffic Control
a. Weight and Size Limitations: Deliveries from two-ton delivery truck.
b. Delivery Vehicle: Two-ton truck.
i. Maximum of 1 delivery per day.
Page 1 of 2 RECEIVES,
08/19/2022
ASPEN
BUILDING DEPARTMENT
Pacific Sheet Metal Inc. Manufacturing
cp 970.963.6563 Phone
80 Gemat Circle
Rifle, CO 81650
970.963.6564 Fax
ROOFING www.pacificsheetmetal.net MailingAddress:
Post Office Box 70
Carbondale, CO 81623
ii. Deliveries to be carried out between 8:00 am and 10:00 am.
iii. Exceptions to delivery schedule: unexpected delays in shipping.
7. Traffic Control Plan
a. See attached map N/A
b. See attached map N/A
c. Peak traffic hours: no deliveries during peak times.
8. Sediment and Erosion Control
a. N/A no soil disturbed
9. Fugitive Dust Control
a. N/A no soil disturbed
10. Emissions
a. All vehicles meet local emissions standards.
11. Noise Suppression
a. We will be working with roofing hand tools.
b. Hours will be limited to 7:30AM-5:30PM(accepted times for making noise).
Page 2 of 2 RECEIVES,
08/19/2022
ASPEN