HomeMy WebLinkAboutMaster Permit.720 W Smuggler St.0016-2022-BREP (3) Reviewed by Engineering
06/06/2022 9:45:34 AM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen.The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements."The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction _\
documents and other data. _,IT t/OF ASPEN
Construction Mitigation Plan for Minor Projects
Full Construction Management Plan (CMP) requirements can be found in the Construction Management
Plan Requirements Manual available here. The following document can be utilized for interior remodels
and/or soil disturbance less than 1,000 SF with no excavation stabilization.The "Construction Mitigation
Plan for Medium Projects" document can be utilized for interior remodels and/or soil disturbance greater
than 1,000 SF and less than 2,000 SF. For large projects or at the discretion of the CMP reviewer a full CMP
written by the project contractor is required.
The purpose of this form is for small projects to acknowledge the applicant is aware of all CMP
requirements and will abide by all requirements.
1.0 General
The project contractor has completed the City of Aspen online CMP certification class. The online
training course is available at cmpaspen.com. A copy of the CMP certificate is provided with this
submission.
2.0 Project Location
Project Address: 720 W Smuggler Street Aspen CO 81611
Project Disturbance Area: 140 SF
Project Description: Replace existing rear deck by removing concrete slab with heat tubing,
existing waterproof membrane and drainage mat and damaged framing.
Replace wood framing, replace drainage mat and waterproof membrane,
replace heat tubing and pour a new sloped concrete slab per proposed
structural design dated 05/20/22.
Contact Information:
Appendix A—Proled Sig.
William J Lawrenz
Name: PROJECT NAME
PROJECT ADDRESS
Phone: 303-704-6145 PERMIT NUMBER
G C.NAME&CONTACT NUMSERISI
Email: Jlawrenz@blueriverconstruction.net EMERGENCY MAMEa CONTACTNUMBER(S)
3.0 Project Documentation
Prior to the start of permit activity, the contractor will properly
notify all neighbors and the general public. Project Oesctiption
Project Partner
P,oject Panne,
Project Partner
Listing ApenUASency
Prior to the start of permit activity, a project sign will be posted at the «K«»x1
site. •
RECEIVED
05/31/2022
ASPEN
BUILDING DEPARTMENT
CITY OF ASPEN
4.0 Project Implementation
Hours of Construction: Construction hours shall be limited to 7:30am —5:30pm Monday through
Friday and 9:00am —5:00pm on Saturday. No construction is permitted on Sundays or holidays as
identified by the CMP Manual.
Prior to the start of permit activity the project will provide fencing six feet (6') in height and
constructed out of chain-link fence with mesh windscreens (visual barriers) for all exterior work.
The contractor is aware of all trees within the work area and will provide tree protection in
coordination with, and as directed by the City Parks Department.
5.0 Site and Right of Way Management
By signing this document, the contractor ensures that there is adequate staging area onsite for all
construction trailers,job materials storage, portable restrooms, waste management and recycling
containers. If a portion of the ROW is needed the contractor will submit for a temporary
encroachment permit. Loose job material storage is not allowed in ROW under any circumstances.
The project will maintain continuous emergency vehicle access, on and around site, including but not
limited to police, fire, and ambulance services.
All required construction parking shall be provided onsite or the contractor will properly lease parking
spaces from the COA Parking Department.
Contractor will provide recycling onsite for both conventional and construction related materials.
6.0 Traffic Control
By signing this document the contractor ensures that the project does not impact roadways or
pedestrian walkways. No traffic control plan is needed.
The project requires no special circumstances for deliveries. Traffic control required for deliveries
must be fully coordinated with the City of Aspen Engineering Department. Roads will not be closed
under any circumstances, unless granted permission from the City of Aspen Engineering Department.
7.0 Pedestrian Protection
The project maintains all pedestrian walkways including all ADA requirements.
8.0 Sediment and Erosion Control
Best Management Practices will be installed which will prevent any erosion and sediment transport
offsite.
RECEIVED
2
05/31/2022
ASPEN
BUILDING DEPARTMENT
lobe
CITY OF ASPEN
If the project is located in the Smuggler Mountain Superfund Site a Superfund Site soil removal permit
has been submitted.
9.0 FUGITIVE DUST CONTROL
A Fugitive Dust Control Plan is in place if applicable.
10.0 EMISSIONS
All vehicles and equipment used on site will be properly maintained such that the engines will
function within manufacture's standards or parameters.
I spoke witi the
11.0 NOISE SUPPRESSION contractor about
concrete demo. This
The project will adhere to all noise requirements. work to be done from
9-5 as it will be loud
Noise limits are 70 decibels(dB) at the property line during the summer on season. Projects located
on the Mall will be limited to 70 decibels (dB) at the property line during the winter on season. All
other times projects will be limited to 80 decibels (80dB) at the property line.
If the project requires a sound fence to stay within the noise limits this form is not applicable and the
project shall submit a full CMP with a Noise Suppression Plan. The minimum requirements for a non-
modeled noise suppression plan are a 14-foot tall fence of noise dampening material surrounding the
construction site.
12.0 ENFORCEMENT
A City Construction Mitigation Officer will complete random site visits to determine if the project is
following approved Plan and City requirements.
SIGNATURE
I acknowledge that all Requirements listed above as well as within the COA Construction Management
Plan Requirements IVaanual will be met on the project site. Contractor acknowledges that failure to
abide by this affidav twill result in red tags on the project and loss of participation in the program
Signature: {/VV
Printed Name: William J Lawrenz
Date: 05/31/2022