Loading...
HomeMy WebLinkAboutMaster Permit.720 W Smuggler St.0016-2022-BREP (5) Permit Detail Edit Clone Permit Form Print Application Letter} View GISMap Send Email I Create Permit Fee Updati Field Plan Set Must Be Printed In Color ,`►►;�; Number 0016-2022-BREP Record Type Building-Repair[Change] CITY OF ASPEN ' / Address 720 W SMUGGLER ST Owner Ds yJiey Fallon[Change] • ',�i � Original Number 22-1389 status Permit Review PERMIT M0.0016-2022-BREP Type Building-Repair Reason for Cancel or Comp!. OWNER ELSENBROOK CITY OF Review Fail . ,. Applicant JOEY LAWRENZ Aspen Internal? No ADDRESS 720 W SMUGGLER ASPEN Account RICK L HALEVY Required Bond Amount PARCEL ID 2735124060020 Project Total Available Bond Amount - These plans muse De Kept at the building site or inspection Land Use Planning Application Bluebeam Project Id 015-029-160 delays may occur.Construction Permit Contractor RICK L HALEVY HPC-ZON-EH-UTIL Review CALL FOR INSPECTION AT shall conform to these plans.All changes shall be approved by Valid Business License on Eng Review liiiiking official. Account DEMO TO VERIFY EXTENTS OF Imported Parks-Prkng-San Review Required Submissions Conditional Inspections EXISTING S N O W M E LT SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, Documents Resubmitted Conditional Final Insp PLUMBING,MECHANICAL,OR FIRE SPRINKLER WORK Approved Covid-19 Plan j SMOKE ALARMS AND ►Action kerns CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING - UNIT PER CITY OF ASPEN ►Queue Score MUNICIPAL CODE 8.15 ► Dates It should be known that this review shall v Basic Information Minimum R10 continuous insulation required not relieve the applicant of their responsibility to comply with the Description Replace existing rear deck by removing concrete slab with Census Code directly under the snowmelt assembly. requirements of the City of Aspen heat tubing,existing waterproof membrane and drainage Municipal Code.Pursuant to mat and damaged framing.Replace wood framing, Sec.26.104.050,any permit or approval issued in error or otherwise not in replace drainage mat and waterproof membrane,replace SNOWMELT SYSTEM AND EQUIPMENT MANDATORY RE conformity with the requirements of this heat tubing and pour a new sloped concrete slab per Title,shall be void.Similarly,any permit proposed structural design dated 05/20/22. All snowmelt systems shall meet the following: or approval issued in reliance upon or Use of Building Single Family -Any portions in the Right of Way must be on a separate zone. A ROW permit as a result of,a materially false and Permanent Encroachment License are required. statement or representation made in Use Class Residential - R10 insulation shall be installed under the area to be snowmelted or R5 insulation the process of obtaining the permit or shall be installed under the slab edges.(Ordinance 11 Series 2011) development approval shall,likewise, Permit Comments be void.Any person having received a -Automatic controls installed for system shut off when pavement temperature is above void or voidable permit or approval 50°F and no precipitation is falling.(2015 IECC R403.9 and C403.2.4.5) shall not be relieved from having to *Job Location -Automatic or manual controls installed for system shut off when outdoor temperature comply with all applicable terms and Address 720 W SMUGGLER ST ASPEN:273512406002 Lot P is above 40°F. (2015 IECC R403.9 and C403.2.3.5) conditions of this Title and the City shall - Inspection by testing hydrostatically at 1.5 times max system design pressure,but not not be estopped from fully enforcing Site Address Display on Map Legal Description Subdivision:CITY AND TOWNSITE OF less than 100psi,for 15 minutes. (2015 IMC 1208.1) same. Lot P AND:-Lot:Q Historic Property? No Eden Address ---�� Historic District? No ► HPC-Planning-Zoning Details blueriver Scope of Work w Building Project Details 720 W.Smuggler Street Aspen CO 81611 Valuation S134.332.19 Lot Size Sq.Ft. 6,000 Dining Room Balcony Replacement Reason for Valuation Change Soil Disturbance Sq Ft 0 05/18/2022 Unit Sq.Ft. 4.109 Affected Area Sq Ft 0 Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft SITE CONSTRUCTION: Sq Ft of Building Work Area 140 Existing Hardscape of Lot 0% 1. Install protection on all existing finishes at dining room balcony,lower-level rear patio(beneath balcony to be replaced)and backyard paver terrace area Building Fire Area Sq Ft Con Mit Sq Ft Total 140 2. Remove existing privacy fence and fence posts as needed to accommodate construction "��of Interior being Altered Utility Review Sq Ft Total 0 activities,dumpster,temporary toilet and stagging location a. Fence and fence posts to be replaced in existing location when work is complete 3. Install temporary fencing as needed to secure jobsite ► Scope of Work Details 4. Receive 20 yrd dumpster and temporary toilet DEMOLITION OF EXISTING: Building Description 1. Isolate and drain existing heat tubes in concrete deck v 2. Remove existing steel spiral staircase and steel guardrails Code Editions 2015 I RC Required Special Inspections a. Existing steel spiral staircase and guardrails to be re-installed in their existing locations when the new framing and concrete are completed Other Code Editions Energy Code Compliance Prescriptive Table 3. Demolish balcony concrete slab Building Type(IRC) One family Open Text Field For Comments Existing compliance to remain. 4. Demolish balcony framing a. Existing double 6x6 columns to remain Construction Type VB 5. Remove all trash and recoverable items from the property Occupancy Group CONSTRUCTION OF NEW DINING ROOM BALCONY: 1. Install new wood framing per the proposed design,dated 05/18/2022 2. Install new hot applied waterproof membrane and drainage mat 3. Install new heat tubes and make plumbing connections to the existing heat loops(cut during concrete demolition) 4. Form and pour new sloped concrete slab per the proposed design,dated 05/18/2022 5. Re-install steel spiral staircase and guardrails Note:All proposed finishes are to match the existing finishes COMPLETION:After all inspections associated with the new balcony's construction 1. Remove protection and dumpster 2. Paint/staining 3. Final cleaning [eV/WE-0 4. Re-install privacy fence in existing location RECEIVED /15/2022 5. Final inspections 05/31/2022 FORCODECUIII'IJN(CE Page 1 of 1 -tustinh ASPEN BUILDING DEPARTMENT