HomeMy WebLinkAboutagenda.council.worksession.20230206AGENDA
CITY COUNCIL WORK SESSION
February 6, 2023
4:00 PM, City Council Chambers
427 Rio Grande Place, Aspen
I.Work Session
I.A Armory Update
I.B Old Powerhouse Update
Zoom Meeting Instructions
Join from a PC, Mac, iPad, iPhone or Android device:
Please click this URL to join: https://us06web.zoom.us/j/88906771440?
pwd=S1Rya2dwSjRSbTdKcE93TUlOU3pYZz09
Passcode: 81611
Or join by phone:
Dial:
US: +1 346 248 7799
Webinar ID: 889 0677 1440
Passcode: 81611
International numbers available: https://us06web.zoom.us/u/kcd2K5BqP
Armory Hall work session memo_2.06.23.docx
Memo_Old_Powerhouse_Programming_Options__2-6-
2023_Worksession_Final_Final.docx
Exhibit I-Programming Option 1-Public Space Option.pdf
Exhibit II-Programming Option 2-Office Space Option.pdf
1
11
Page 1 of 5
MEMORANDUM
TO:Mayor Torre and Aspen City Council
FROM:Jen Phelan, Development Manager
THROUGH:Scott Miller, Public Works Director
MEETING DATE:February 06, 2023
RE:City facilities remodel and use plan -Armory
REQUEST OF COUNCIL:Staff is providing an
update on the Armory and is requesting
confirmation on proposed next steps for the
building.
SUMMARY AND BACKGROUND: At the
September 12, 2022,work session, City
Council discussed the status of the Armory
building regarding its interim use,preferred
level of remodel,and funding options to
undertake the work.Council requested staff
return with updates after the November
election to: 1)provide a status update on lease negotiations with ACRA and any temporary or permanent
needs the City has for the building, 2) see what ballot initiatives passed that may assist in funding the
project, 3)review the feasibility of leasing more of the building, and 4)determine a longer-term plan for
the building. Staff has the following information for Council to consider.
ACRA and city staff space needs.City staff is currently negotiating with ACRA on lease conditions for office
space. The terms being discussed include the continued use of ACRA’s present location within the Old
Powerhouse and anticipated relocation to the ground floor of the Armory. Specifically, the City is looking
at guaranteeing space for ACRA for up to five years.
ACRA is presently estimating a need for approximately 3,200 sq. ft. of the total +/-5,500 sq. ft.of the
Armory ground floor. This proposal would include a welcome center and office space with intermittent
use of the basement meeting rooms.Discussion with the USFS is ongoing, with their proposed footprint
amounting to an additional 200 sq. ft..Subtracting +/-1,620 sq. ft.of common circulation on the ground
floor,ACRA’s and the USFS’space needs,there is 480 sq. ft. of unprogrammed space remaining on the
ground floor of the Armory.
The IT department has relocated from the ground to the second floor of the Armory. Additionally, the
former clerks office on the second floor is being used for record storage and scanning needs. Utility Billing
22
Page 2 of 5
is currently on the ground floor and will need to relocate prior to any move by ACRA. Temporary relocation
of both the Special Events and Asset Management departments will be necessary pending a remodel of
the Main Street cabin and the Old Powerhouse. Remodel of the Main Street cabin is anticipated to begin
in 2024 while work on the Old Powerhouse is forecasted with a similar timeline. It is estimated that the
temporary relocations will be for about 12-18 months.
November ballot results. The November ballot initiative on Short Term Rentals (STRs) was approved by
the electorate and it is estimated that the tax will generate $8-9 million dollars annually. Council may
commit up to 30% of those funds towards environmental initiatives and capital maintenance and repair,
or about $2-3 million, which can free up some existing resources in the Asset Management Plan Fund
being used for maintenance and repair efforts (roughly $800-$900K annually), but Council will need to
weigh additional demands on those funds before any allocation decision is made to leverage these new
sources to support the Armory remodel effort. Outside of these new resources, the City has at least $12
million on hand in the General Fund Reserve that could be prioritized towards remodel of the Armory,
with the balance of the remodel cost being financed via debt issuance.
Long term planning for the Armory. After meeting with Council and confirming guiding principles for the
project (Exhibit A), staff solicited public input in the spring of 2022 and direction from City Council at a
work session in May 2022. Feedback indicated a strong preference for the building to function as a
community hub.Community outreach was undertaken using a variety of techniques, including two online
questionnaires, an open house, and two focus group meetings to solicit community feedback. Staff heard
comments that the community needs a place to gather, that the Armory should be the heart of town, a
community living room with the ability to eat, experience entertainment, shop or just hang out. Top uses
for the building included: casual
dining, community center, multi-
purpose space, non-profit services,
and lower price point retail.
The range of remodel options
included a ‘Light Touch’1 to ‘The
Works’.2 The preferred ‘Somewhere
in the Middle’option provides a
ground floor addition to the Armory
along the alley, with a full basement
underneath. The head height of the
new basement would match that of
the existing basement and allow for
1 ‘A light Touch’:This option would maintain the existing footprint, floors, and square footage while incorporating
improved ADA access (especially the second floor), an overhaul of building systems as needed such as electrical,
heating/cooling, and some repair and restoration of the exterior shell are included. $11 - $16 million.
2 ‘The Works’:This option is essentially a duplicate of ‘Somewhere in the Middle’, except for the basement. The
existing basement would be expanded along the perimeter to existing walls and the depth would be increased
overall in the basement providing for greater floor to ceiling heights. $21.5 – $26.5 million.
33
Page 3 of 5
connectivity. To increase head height on the ground floor of the Armory andrestore it closer to its original
form, the second story would be removed. All new systems would be installed in the building.The remodel
is estimated at $18 - $23 million.
STAFF DISCUSSION:Staff would like to confirm next steps for the use and remodel of the Armory with
City Council. Staff is anticipating a five-year timeline to plan, design and fund the Armory remodel with
construction forecasted to be undertaken in 2028. Feedback is requested in the following areas:
Plan and design for a ‘Somewhere in the Middle’ remodel.Based on the public outreachand direction
from City Council, staff is anticipating furthering the programming and design of the remodel. Staff
will emphasize the need for the end productto be an accessible community gathering space, providing
as much community access as possible. A program will need to be developed that does not duplicate
programming that is or will be available (for example, the potential community space at the Old
Powerhouse)and provides for unmet needs of the community. Additionally, staff will work on a design
that lands in the ‘Somewhere in the Middle’ with an estimated cost of $18 – 23 million. Staff is
requesting that Council confirm the preferred design concept is still ‘Somewhere in the Middle’.
Funding of the remodel. As
mentioned previously, the
City has at least $12 million
on hand within the General
Fund reserve to fund the
project and can look at
taking on additional debt to
fund the balance. Staff
recognizes that City Council
has competing interests for
limited funds but is
requesting confirmation
that funding the remodel is
a Council priority. If funding
is a priority, staff can return later with a more concrete plan to fund the remodel. Most respondents
of the public outreach considered the Armory a high or somewhat high priority that should receive
additional funds if necessary.
Interim Use of the Armory. Besides the anticipated housing of ACRA, the IT department, Utility billing
and the Clerks storage/scanning needs, City staff is anticipating temporary relocation of other
departments within the Armory during the remodel of the Main Street cabin and the Old Powerhouse.
Most of the ground floor will be occupied by ACRA and the second floor with the city departments
just mentioned. This leaves the third floor for temporary relocation of Special Events and Asset
Management while the Main Street cabin and Old Powerhouse are remodeled. Considering the need
to provide access control into and throughout the building, adding more potential users may not
justifythe expenditure of funds prior to any extensiveremodel.Staff is seeking confirmation that the
ground floor, second and third floors will be maintained for ACRA or City use prior to a remodel of
the building.
Courtesy of Aspen Historical Society
44
Page 4 of 5
Timeline of the Remodel. Staff is looking at a five-year timeline to plan, design and fund the remodel
of the Armory, with construction to begin in 2028.At this point staff is estimating a two-year remodel
for the building (Table 1). The timeframe will allow for the programming, design, entitlement,
permittingand funding of the project to be developed as well as any temporary landing space for City
departments affected by the remodel of both the Main Street cabin and the Old Powerhouse.
Although this will take time to complete, a majority of respondentsto the public outreachsaid to take
the time, if needed, for a more thorough renovation.Staff is seeking confirmation thatthe proposed
timeline is supported by City Council.
Table 1: Redevelopment Timeline
RECOMMENDED ACTION: Staff requests confirmation/direction on the remodel concept, funding
component, interim use of the Armory and remodel timeline as noted above.
ATTACHMENTS:
Exhibit A – Armory Guiding Principles
55
Page 5 of 5
Exhibit A
Adopted ‘Guiding Principles’ for the remodel and programming of the Armory.
The programming at the Armory should focus on unmet needs within the community.
The uses within the Armory should provide meaningful and affordable participation in programs
and offerings.
The remodel will respect the historic context and contribute to Aspen’s small-town character.
The building remodel will incorporate sustainable systems showing a commitment to the
environment.
The Armory should be able to be used by a diverse range of people.
The operational structure of the Armory should limit the public financial burden of operating
and maintaining the building.
The programming of the Armory should contribute to a lively and diverse downtown.
66
Page 1 of 5
MEMORANDUM
TO:Mayor Torre and Aspen City Council
FROM:Evan Pletcher, Capital Asset Project Manager
THROUGH:Rob Schober, Capital Asset Director
Scott Miller, Public Works Director
MEMO DATE:January 30, 2023
MEETING DATE:February 6, 2023
RE:Old Powerhouse Programming Options
REQUEST OF COUNCIL:
The Old Powerhouse (OPH) design team requests direction from Council on the future
programming for the facility.
PROJECT BACKGROUND:
Upon completion of City Hall, the conversation about the future use of the OPH and
Armory was revisited. Council initially directed Staff to take steps necessary to perform a
comprehensive remodel of the facility for office use that was in line with the City’s Facility
Master Plan (FMP). That plan anticipated the building to be used as city offices. Besides
office use, Council direction included a focus on preservation of the building’s historic
nature, sustainability, and exploring options for potential activation of the lawn space for
public use.
In 2022, based on internal dialogue, Staff evaluated whether the facility could house a
public meeting space in addition to office space. Staff has confirmed office and storage
requirements can be met, and the existing downstairs, currently leased to ACRA, could
serve as a public gathering area.
Given the original and most recent Council requests for the facility, Staff has
subsequently created two programming options for Council’s consideration: A
public/office space option, and an all-office space option. Staff has also detailed what
will be included in the base project scope.
77
Page 2 of 5
BASE PROJECT SCOPE:
Regardless of the programming option chosen, the base project will address all
deficiencies noted in the FMP and bring the facility up to current ADA and energy
efficiency standards.
The base scope of this project will address:
Accessibility throughout the facility, including adding an elevator, and ADA
compliant bathrooms.
Preservation of the existing masonry envelope including replacement of spalled
and cracked bricks, repointing and waterproofing improvements.
Reroofing with historically compatible materials and other waterproofing and
thermal improvements.
Code required structural roof framing upgrades to accommodate current
snow loading requirements.
Installation of new gutters, downspouts, snow fences and heat trace to better
manage roof moisture and runoff.
Replacement of non-historic windows to improve thermal performance.
Enclosing the existing porch at the parking lot to provide an additional 180 SF of
floor area.
Improvements to maximize the functionality of the shop attic storage area.
Selected tree removal to eliminate future damage to building foundations and
roof eaves.
Completion of the historic wood window refurbishment. (8 of 10 windows
were previously restored in 2017.)
Install sustainable and high performance mechanical and electrical systems.
Replacement of building sewer service line.
Resurfacing of the existing parking lot.
BASE PROJECT BUDGET:
This project will be funded by the Asset Management Plan Fund (000) in project
51420 – Old Powerhouse Preservation.
In 2022, $350,000 was appropriated for design and pre-construction services.
There is currently $4,095,000 million budgeted for construction in 2024.
The original scope of the project was to renovate the space to be City offices only.
Staff will provide an updated total project cost estimate once a programming
decision has been made and the design has progressed.
88
Page 3 of 5
PROGRAMMING OPTION 1:
Option 1, or the “Public Space Option”, detailed in Exhibit I, would utilize the upstairs of
the OPH for Staff office space, and use most of the lower level as a large public meeting
space.
In addition to the base scope, this programming option includes:
Creating a public gathering space at the OPH.
Creating a new opening in the south gable end wall for a glazed operable door
that permits direct circulation between the community room and the landscape.
Improve visual and physical connections to the adjacent park and river
landscape.
Landscape improvements to enhance the community use of the building.
Adding a catering kitchen and public space storage areas.
Adding a new shed dormer to the east side to improve lighting, functionality, and
ventilation in the upper-level workspaces.
Providing a separate free-standing storage and trash structure east of the
building.
Exposing some of the historic masonry in interior community spaces.
Providing educational opportunities with historic photos/story board of the facility.
Pros:
The facility is available for public use and may relive pressure for meeting space
in the Armory.
The lawn space is activated.
This beautiful historic building can be enjoyed and experienced by everyone.
The functionality of the upstairs office space is maximized with the addition of the
dormer.
The downstairs workshop will meet Staff needs.
The Main St Cabin can be vacated by City Staff and redeveloped as employee
housing.
Council could explore the possibility of moving Sister Cities to the OPH, freeing
up the existing City Hall space for other uses.
The historic brick that is removed to create the opening for the roll door can be
used to replace exterior brick that is beyond repair.
Cons:
The Utility Billing, IT, and Transportation departments will have to remain in the
Armory or another location.
This option costs more than Option 2 or the “Office Space Option”.
99
Page 4 of 5
PROGRAMMING OPTION 2:
Option 2, or the “Office Space Option”, detailed in Exhibit II, would utilize the entire
facility as City Staff office, workshop, and storage space. In this scenario, the Special
Events, IT, and Capital Asset Departments would occupy the building. Additionally, a
large conference room and flex office/meeting area would be available for City use on
the lower level.
In addition to the base scope, This programming option includes:
Creation of additional secure storage and a new kitchenette.
Adding a new shed dormer to the east side to improve lighting, functionality, and
ventilation in the upper-level workspaces.
Providing a separate free-standing storage and trash structure east of the
building.
Landscape improvements to aid in activating the outdoor space.
Pros:
Creates City office space that is in line with the verified program and FMP
The Main St Cabin can be vacated by City Staff and redeveloped as employee
housing
The Armory can be fully vacated by City Staff
The functionality of the upstairs office space is maximized with the addition of the
dormer
This option costs less than Option 1, or the “Public Space Option”.
Cons:
The facility is not available to the public
It may be challenging activating the lawn space
ENVIRONMENTAL IMPACTS:
The design team will closely evaluate the existing mechanical systems and building
envelope in search of efficiencies to be gained in building operation and functionality.
They will use knowledge gained from the pandemic and existing City office spaces to
ensure they create a healthy and productive office environment.
ALTERNATIVES:
Staff could perform only the base project scope and continue using the facility as City
offices.
1010
Page 5 of 5
RECOMMENDATIONS:
Please review and select either Option 1, the “Public Space Option”, or Option 2, the
“Office Space Option”.
CITY MANAGER COMMENTS:
ATTACHMENTS:
Exhibit I:Programming Option 1 “Public Space Option”
Exhibit II: Programming Option 2 “Office Space Option”
1111
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 E1EXISTING MAIN LEVEL PLAN
MECH
SHOP
WOMEN
MEN
LOBBY
STORAGE
ACRA CONFERENCE
ENTRY
SHOPSHOP
OFFICE
OFFICE
FILES MEETING
WS WS WS
WSWSWS
1212
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 1MECH
SHOP
WOMEN
MEN
LOBBY
CATERING
KITCHEN
STORAGE
COMMUNITY ROOM
ENTRY
CONCEPTUAL MAIN LEVEL PLAN
1313
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 E2EXISTING UPPER LEVEL PLAN
LOBBY
MECH.STORAGE
MEETING OFFICE OFFICE
OFFICE
OFFICE
OFFICE
1414
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 KITCHEN MEETING
PO-1
PO-1
FILES +
STORAGE
PO-2
PO-2PO-2
PO-2MECH
WS
WS
WS
WS
WS
WS 2COPIER
MEETING
CONCEPTUAL UPPER LEVEL PLAN
1515
1616
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 4AERIAL VIEW
SOUTHWEST VIEW
1717
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 5SOUTH VIEW
SOUTHEAST VIEW
1818
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 3NORTH VIEW
NORTHWEST VIEW
1919
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 E1EXISTING MAIN LEVEL PLAN
MECH
SHOP
WOMEN
MEN
LOBBY
STORAGE
ACRA CONFERENCE
ENTRY
SHOPSHOP
OFFICE
OFFICE
FILES MEETING
WS WS WS
WSWSWS
2020
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 1aCONFERENCE ROOM
OFFICE CONCEPTUAL MAIN LEVEL PLAN
MECH
SHOP
WOMEN
MEN
LOBBY
KITCHEN
STORAGE
ENTRY
WS WS WS
WS WS WS
FLEX
WS
FLEX
WS
WORKROOM MEETING
PO-1
2121
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 E2EXISTING UPPER LEVEL PLAN
LOBBY
MECH.STORAGE
MEETING OFFICE OFFICE
OFFICE
OFFICE
OFFICE
2222
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 KITCHEN MEETING
PO-1
PO-1
FILES +
STORAGE
PO-2
PO-2PO-2
PO-2MECH
WS
WS
WS
WS
WS
WS 2COPIER
MEETING
CONCEPTUAL UPPER LEVEL PLAN
2323
GILBERT SANCHEZ ARCHITECT PLLC300 South Spring Street #202 Aspen, CO 81611P: 970.948.0597 E: grsanchezaia@gmail.com OLD POWERHOUSE REMODELCONCEPTUAL DESIGNNovember 28, 2022 3NORTH VIEW
NORTHWEST VIEW
2424