HomeMy WebLinkAboutInspection.100 Dean St.0056-2021-BCHO 0003-2021 -BRES 100 E Dean St_BuildingCommentl
90.Architectural Plans.100 E Dean St.2020.12.29.pdf(1)
Subject: PlanCheck
M Page: 1-CVR COVER IBC 3302.1 and 3310.2 require
Author:justinh that safe and compliant egress
„— Color: ■ be provided during construction.
File Name: 90.Architectural Plans.100 E Dean The building will either need to
`re" St.2020.12.29.pdf be completely unoccupied during
„ „"'°°°�'""" "°°s�<•,• construction of the stair towers
or an alternate method of
providing safe egress will be
WEE required. Confirm that the
building will be unoccupied
during construction or provide a
Letter from Timber Ridge HOA President confirming the detailed plan for the temporary
building will be unoccupied during construction: egress that will be put in place
30.Timber Ridge HOA Unoccupied Letter.100 E Dean St.2021.04.22
during stair demolition and
construction.
RECEIVED
05/04/2021
ASPEN
BUILDING DEPARTMENT