Loading...
HomeMy WebLinkAboutInspection.100 Dean St.0056-2021-BCHO 0003-2021 -BRES 100 E Dean St_BuildingCommentl 90.Architectural Plans.100 E Dean St.2020.12.29.pdf(1) Subject: PlanCheck M Page: 1-CVR COVER IBC 3302.1 and 3310.2 require Author:justinh that safe and compliant egress „— Color: ■ be provided during construction. File Name: 90.Architectural Plans.100 E Dean The building will either need to `re" St.2020.12.29.pdf be completely unoccupied during „ „"'°°°�'""" "°°s�<•,• construction of the stair towers or an alternate method of providing safe egress will be WEE required. Confirm that the building will be unoccupied during construction or provide a Letter from Timber Ridge HOA President confirming the detailed plan for the temporary building will be unoccupied during construction: egress that will be put in place 30.Timber Ridge HOA Unoccupied Letter.100 E Dean St.2021.04.22 during stair demolition and construction. RECEIVED 05/04/2021 ASPEN BUILDING DEPARTMENT