Loading...
HomeMy WebLinkAboutChange Order.100 Dean St.0056-2021-BCHO (5) Permit Detail Edit Clone Permit Form Print Application Letter View GIS Map Send Email l Create Permit Fee,,Update BB project ID Field Plan Set Must Be Printed In Color '`►►►►►►►/;',/ Number 0056-2021-BCHO Record Type Change Order[Change] Address 100 E DEAN ST Owner ©Emmy Garrigus[Change] ;''';I Original Number 21-2837 Status Permit Review ^ External Energy Use Approved Type Change Order Reason for Cancel orCompl. 1 MASTER PERMIT 0003-2021-BRES Review Fail x❑ RREMP ElCREMP Applicant WAYLAND WEATHERRED Aspen Internal? No _CI Of C ASPEN CITY OF PERMIT#:o056-2021-BCHO DATE:1/4/22 ASPEN Account WAYLAND WEATHERRED Required Bond Amount MASTER PERMIT 0003-2021-BRES Project Total Available Bond Amount PERMIT NO.0056-2021-BCHO SNOWMELT:513 SQ.FT. OWNER POOL: These plans'rtept at the Land Use Planning Application Bluebeam Project Id 702-357-517 TIMBER RIDGE CONDO ASSOC SPA: Master Building Permit 0003-2021-BRES HPC-ZON-EH-UTIL Review - - building site or inspection ADDRESS 100 E DEAN ST REMP SHEET: A1.3 delays may occur.Construction Permit Contractor JANCKILA CONSTRUCTION INC Eng Review _ shall conform to these plans.All Valid Business License on Parks-Prkng-San Review MINIMUM BOILER AFUE: 100%(ELECTRIC) changes shall be approved by Account PARCEL ID 273513115801 OFFSET: NONE the building official. Imported Conditional Inspections REVIEWED BY: JH Required Submissions Conditional Final!nap SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. All snowmelt systems shall meet the following: SEPARATE PERMITS ARE Documents Resubmitted -An rsons in the Right of Way t be on a separate zone.A ROW-Any g ymn REQUIRED FOR ELECTRICAL, Approved Covid-19 Plan permit and Permanent Encroachment pare License are required. -R10 insulation shall be installed under the area to be snow melted or R5 PLUMBING,MECHANICAL,OR insulation shall be instated under and at the slab edges.(Ordinance 11 FIRE SPRINKLER WORK Series 2011) ►Action Items -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling.(2009 IECC Sec.403.8 a 503.2.4.5) SMOKE ALARMS AND -Automatic or manual controls instated for system shut off when outdoor CARBON MONOXIDE ►Queue Score temperature spectionbytestinghve ydrostaticallyat1 times 9 IECC Sec. 3ma 503.2.4.5) y emdesign DETECTORS REQUIRED pressure,but not less than 100psi,for 15minutes.(20091MC Sec. THROUGHOUT DWELLING ►Dates 120e.1) UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 i Additional Information SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S I - Description Add snowmelt to 3rd level North decks. census Code -°Change Order All snowmelt systems shall meet the following: It should be known that this review shall -Any licant of their Use of Building Multi-Famity and Permanent es lntn tEncrroachm Encroachment License he Right of Way must bare required.e on a rate zone.A ROW permit resnot ponsibility to celieve the omply ly with the p Y pY Use Class Residential -R10 insulation shall be installed under the area to be snowmelted or R5 insulation requirements of the City of Aspen shall be installed under the slab edges.(Ordinance 11 Series 2011) Municipal Code.Pursuant to Class of Work Alteration -Automatic controls installed for system shut off when pavement temperature is above Sec.26.104.050,any permit or approval 50°F and no precipitation is falling.(2015 IECC R403.9 and C403.2.4.5) Permit Comments issued in error or otherwise not in -Automatic or manual controls installed for system shut off when outdoor temperature conformity with the requirements of this is above 40°F.(2015 IECC R403.9 and C403.2.3.5) Job Location -Inspection by testing hydrostatically at 1.5 times max system design pressure,but not Title,shall be void.Similarly,any permit Vless than 100psi,for 15 minutes.(2015 IMC 1208.1) or approval issued in reliance upon or Address 100 E DEAN ST,ASPEN:273513115801 Lot as a result of,a materially false statement or representation made in Site Address Display on Map Legal Description Subdivision:TIMBER RIDGE DESC:COMMON AREA the process of obtaining the permit or TITLE PARCEL B(5,627 SQ FT+/-) development approval shall,likewise, Historic Property? No Eden Address be void.Any person having received a Historic District? No void or voidable permit or approval shall not be relieved from having to _ comply with all applicable terms and ►HPC-Planning-Zoning Details conditions of this Title and the City shall not be estopped from fully enforcing same. i Building Project Details — Valuation S34,000.00 Lot Size Sq.Ft 12.171 Reason for Valuation Change Soil Disturbance Sq Ft 0 Unit Sq.Ft. 960 Affected Area Sq Ft 0 Sq Ft of Building Work Area 6,255 Existing Hardscape Footprint Sq 0 Ft Building Fire Area Sq Ft Existing Hardscape%of Lot 0% %of Interior being Altered 0% New Sq.Ft. 0 Utility Review Sq.Ft 0 ►MEP-New Work Items ►Scope of Work Details V Building Description Code Editions 2015 IEBC Required Special Inspections Fire Sprinkler Existing? No Energy Code Compliance Fire Sprinkler Required? NO Existing Snowmelt Energy Use 0 Fire Sprinkler Type Existing Spa Energy Use 0 Construction Type VA Existing Pool Energy Use 0 Fire Alarms Installed? Building Type(IRC) Occupancy Group(IBC) R-2 Open Text Field For Comments 513 sq.t new elect snowmelt on 3rd floor decks ►I Ink flearrintinn As Prnnnead rphiev �d��U 5/2022 ZONING SEE NOTES#1 PLANS rIEWIM L4 01/04/2022 FORCOOECOutc'UM(E justinh