Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Master Permit.100 Dean St.0056-2021-BCHO (7)
Permit Detail Edit Clone Permit Form Print Application Letter View GIS Map Send Email I Create Permit Fee' Update BB p Field Plan Set Must Be Printed In Color Number 0003-2021-BRES Record Type Building[Change] Address 100 E DEAN ST Owner ©Lauren Litchet[Change] CITY•OF ASPEN `, Original Number 20-3327 Status Permit Review Type Building Reason for Cancel or Compl. PERMIT NO.0003-2021-BRES �\ Review Fail /� `�11 Applicant WAYLAND WEATHERRED Aspen Internal? No OWNER TIMBER RIDGE CONDO ASSOC Account WAYLAND WEATHERRED Required Bond Amount The City of Aspen Project Total Available Bond Amount ADDRESS 100 E DEAN ST 3D //�� These plans must be kept at the Land Use Planning Application LPA-21-005 Bluebeam Project Id 702-357-517 PARCEL ID 273513115801 building site or inspection Permit contractor JANCKILA CONSTRUCTION INC HPC-ZON-EH-UTIL Review delays may occur.Construction Valid Business License on Eng Review Eng-CMP Rev.Eng-Dev Rev.Eng-ES Rev, shall conform to these plans.All Account "TRIM 601 Fire Resistive Requirements for changes shall be approved by Imported Parks-Prkng-San Review Type of Construction: VA the building official. Primary Structural Frame: 1 hr Required Submissions Conditional Inspections (columns,beams,girders,etc) Exterior Bearing Walls: 1 hr Documents Resubmitted Conditional Final Insp Eng-Dev Final,Eng-ES Final, Interior Bearing Walls: 1 hr SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, Approved Covid-19 Plan IFloors/Ceilings: 1 hr Roof: 1 hr PLUMBING,MECHANICAL,OR Unless noted otherwise for occupancy separation or fire FIRE SPRINKLER WORK ►Action Items separation distance. ► SPECIAL INSPECTION REQUIRED: Related Charts - ructural steel welding:Field&Shop 0.Queue Score - i h strength bolting -Epoxy anc to 0.Dates -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles w Basic Information Special inspection is required per 2015 IBC Description Remove existing exterior wood stairs,decks and balconies Census Code 434-Additions.Alterations,and Conversions section 1704.inspector to yeri6,that copy of and replace them with steel/conc.structure.Remove Residential Buildings agreement for inspection program to be on existing exterior materials and replace.Remove existing the job site p or to performing any mansard roofs and replace with new metal clad roof nspections.A copy of all Special Inspector design_New roof will use existing flat roof drains.Replace fold reports to be on the job site for iany existing wood framed windows and doors with new nspecto s review if requested.Failure to metal clad windows and doors,same size and shape.All comply may result in denial of inspection. work will be exterior to the building_ Use of Building Multi-Family Interior Remodel Only Use Class Residential Class of Work Alteration Permit Comments — Building to be completely unoccupied w Job Location while stair towers are under construction Address 100 E DEAN ST ASPEN:273513115801 Lot Site Address Display on Map Legal Description Subdivision:TIMBER RIDGE DESC:COMM Timber Ridge Corporation ADDRESS::00E.DEAN ST.,ASPEN,COLORADO.91911 PERMIT NUMBER: 0003-2021-BRES TITLE PARCEL B(5,627 SQ FT+/-) c/o Aspen Resort Accommodations Historic Property? No Eden Address 600 East Hopkins Ave.,Suite 203 COMMUNITY DEVELOPMENT DEPARTMENT Historic District? No Aspen,Co 81611 BUILDING PERMIT CONTACT SHEET me Ken Adler.KA Designworks,Inc. Phase „mall Ken tOKd-Oe Sly IWOt ItS.OUIII 0. HPC-Planning-Zoning Details "e April 22,2021 name Jim Zielinski,Janckila Construction Phone E.mIIpmzw lancanaconslructisn.wm w Building Project Details Nam. nave coin,owner Mange t.onoonnmums nVA IAwna u Phone Valuation $2.200,000.00 Lot Size Sq.Ft. 12.171 aearea:100 E.Dean Street „,,,Aspen NCO ap81611 Reason for Valuation Change Soil Disturbance Sq Ft 916 Justin Hahn al,pdellis@q.eom City of Aspen Unit Sq.Ft. 960 Affected Area Sq Ft 3.266 Building Department ware John Howard,Willow Creek Property Management pheM tU f U)Ue i-U I 03 cal Phone Building Footprint Sq Ft 6,255 Existing Hardscape Footprint Sq 0 130 S.Galena St. rigi.100 Elk Run Dr.,Ste.121 Basalt CO 81621 Ft Aspen,CO 81611 wgjOhnhoward@willowcreekrns.com run ar Sq Ft of Building Work Area 2,350 Existing Hardscape%of Lot 0% tits:a Building Fire Area Sq Ft Con Mit Sq Ft Total 3.266 vame Arch Cect Phone Call Phone Re:Timber Ridge Remodel Permit Ma,l;re Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 916 address stir state ZIP of Interior being Altered 0% LTA, Dear Justin: Ken Adler,KA Desi nworks,Inc. Phone cell Pne�ey/U-y40- o I U New Sq.Ft 0 ware g alVfe p P.O.Box 12204 Aspen m,,,0C0 sir81621 - This letter is to confirm that the Timber Ridge building will be completely unoccupied ow ► Scope of Work Details during construction of stair towers and associated walkways.The building will remain ing„ken@ka-designworks.com unoccupied until the towers and associated structure necessary for safe egress have been constructed. some Jordan Kehoe,SGM Engineers ph...MI V)304- UO I GII Phor,. w Building Description Aadlrll118 W.Sixth St.,Ste.200 Glenwood Springs sw_CO ,p81601 Code Editions 2015 IBC Required Special Inspections High-Strength Bolting;Epoxy Anchors;Stnlc The Board of Directors included this measure in the project planning to expedite LTA,jordank@sgm-inc.com Welding construction.All unit owners are on notice of the mandated building vacancy. ry.,John Parleh,SGM Engineers ....tun")3oae-yu,ao bll Phone Other Code Editions Energy Code Compliance Ifyou have furtherquestions,please contact me byemail, dcllisliS .corn orphone,970- ;Wm 118 W.Sixth St.,Ste.200 o,,,Glenwood Springs w_C0 ap81601 Building Type(IRC) Townhouse Existing Snowmelt Energy Use 0 p I seeress 230-9639. r.mall Amress Construction Type VA New Snowmelt Energy Use 0 N.me Janckila Construction y/V y 1-oi 14 n 1 ? !L��T r m Occupancy Group(IBC) R-2 Existing Spa Energy Use 0 Yours truly, nit lIR„r 50 Sunset Dr.,Ste.3 ( Basalt r� CO 81621 I pwl Occupancy Load New Spa Energy Use 0 ott' stm zv O�kl / �L1 J �„ � farjimz@janckilaconstruction.com .:.1 ZONING Fire Sprinkler Existing? No Existing Pool Energy Use 0 7; Fire Sprinkler Required? No New Pool Energy Use 0 David Ellis,President INSPECTIONS: lea a visit wwwa penpiitkm�eom/Departme�mjcommunitcey-Development-Forms/to do so. Fire Sprinkler Type Open Text Field For Comments Stair,walkway,decks and balconies to be Ty Board of Directors I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and ordinances governing this type of work will be complied with whether specifiedgranting of a permit does not new Roofs to be Type VA. Timber Ridge Corporation presume to p herein law not. lac give authority to violate or cancel the provisions of any other state or local regulating construction or the pertormance Fire Alarms Installed? of construction.It is we responsibility to review the approved plans and any comments that are contained thereon and see that the stntcture and/ar je is bur lianeewhh-all appliahle codes. EI � rieWe/Sianetu apope12-7-2020 11 2 0 21 11) RECEIVED0 Check if a tested owner builder(single-family homes only).You must take a test and complete the owner/bu dogs davit. (CITYU O Y)Owner builder approved by: Date: Affidavit oefie/30/2t20 05/04/2021 CITY OF ASPENAupntaos, 130 S.GALENA ST I ASPEN,CO 81.144 1ustinh ASPEN tuiwtNb utPARIMENT BUILDING DEPARTMENT ESR-1463 I Most Widely Accepted and Trusted Page 2 of 13 Page 3 of 1 S 1.14,1.52 or 2.29 min))nonreinforoe0 white EPDM bonded ESR•1469 I Mont Widely Accepted and Trusted 9 ESR-1463 I Most Widely Accepted and Trusted Paga 4 of 19 ma Ireu^;gas ( (1.14 Ira)] 60 mils[0.60 Inch(1.52 ram)]and 80 mils 'Iliv Most Widely Accepted and Trusted to polyester fleece.Available product thicknesses are 100, [0.60 Inch(2.03 ram))thick,with a laminated polyester (19.1 ram), or into the wood deck a minimum of 3.9.14 PVC'Oval Barbed Plate:This is a 11/2-Inch=by- supplied in 5-gallon(18.9 L)containers with a shelf life of against contact with Incompatible materials.Where gypsum _ . 115 and 145 mile 0.100,0.115 or 0.145 Inch 2.54,2.92 or fleece backing. Available thicknesses are 1002 mils 1 Inch 25.4 mm). 2.4-Inch(35 rate by 69.85 ram)Oval Barbed Plate designed one I ( g ( ) to be used with HP-X Fasteners to mechanically attach PVC year. board is used as barrier board in the roofing assembly, 3.2.ram)]. 135 m inch5 l rate( 115 mils[0.115 inch(2.92 mm)]and 3.9.3 HP Perlin Fastener:This is an epoxy-coaled steel membrane to the roof deck. 3.10.8 Solvent-Free EPDM Bonding Adhesive:Solvent- Weather protection must be provided to prevent damage to ICC-ES Evaluation Report • ESR-1463 3.2.8 Sure Seel mm)or Sure-Seal AFX Is a 45-mil 135 mils[re W Inch(3.43 rate)], • screw used in combination with Carisle's fastening plates or Free EPDM Banding Adhesive is a high-strength,polymer- the gypsum board prior to application of the roofing Reissued October 2018 [0.045 inch(1.14 mm)or 60-mll[0.060 Inch(1.52 ram)]non- 3.4.5 Sure-Weld AFX:Sure-Weld AFX is the Sure-Weld bars to mechanically attach roofing Insulation and 3.9.150MG Roofing Products RhlnoBond Plate:The based adhesive.This adhesive can be used to adhere all membrane. Revised July 2019 reinforced EPDM bonded to a 7 polyester fleece.Available HS membrane with a laminated polyester fleece backing. membranes to atmcturel steel members.Fastener length Rhin8Bond Plate la a 3-inch-diameter (78.2 rate, thicknesses are 90 tells 0.090 inch(2.29 rate]and 105 mils Available thicknesses range from 120 mils 0.120 Inch must be selected to penetrate through the steel member a 0.028-inch-thick(0.7 rate galvalume-coated steel plate, Sure-Seal or Sure-White EPDM membranes as a The slope of the roof°n which the single-ply membranes I ) 9 [ coated with a proprietary adhesive and used with the HP-X one-sided,wet lay-in a lion(.It has a coverage rate of are Installed must not be more than the maximum slope This raped is subject to renewal October 2020. [0.105 inch(2.67 rate)]. (3.05 rate)]to 155 mils[0.165 Inch(3.94 rate)], minimum of N.inch(19.1 rate.) 100 square feet per gallon(2.5 m2IL).The adhesive is indicated for the particular assembly as listed in Tables 2 fastener to mechanically attach PVC and TPO membranes supplied in 5-gallon(18.9 L)containers with a shelf life of six and 3. 3.3 PVC Membranes: 3.4.6 Speclro•Weld: Spectro-Weld is the Sure-Weld 3.9.4 HD 14.10 Fastener:This Is a heavy-duty,epoxy- to the roof deck.The adhesive bonds the plate to the months. www.icc-eS.Orq I (800)423-6587 I (562)699.0543 A Subsidiary of the International Code Council® 3.3.1 Sure-Flex PVC:Sure-Flex PVC Is aheat-weldable membrane,described in Section 3.4.1,formulated with a coated steel screw used in combination with Carlisle's underside of the membrane. Penetrations and terminations of the roof covering mud brighter white color.Available thicknesses are 60 mils fastening plates or bars to mechanically attach roofing 3.10.9 Cold Applied Adhesive:Cold Applied Adhesive is a be flashed and made weather tight In accordance with the PVC thermoplastic membrane consisting of a weft-inserted 3.10 Carlisle 8 ntec Adhesives;See Tables 2 and 6 for polyester fabric that is encapsulated by PVC based top and [0.060 Inch(1.52 ram))and 80 mils[0.0801nch(2.03 ram)]. Insulation antl membranes to concrete roof deck.Fastener Y solvent-tree, asphalt-modified polyether adhesive. This requirements d the membrane manufacturer and the DIVISION:07 00 00-THERMAL AND MOISTURE 2.0 USES bettom piles.Available thicknesses range from 50 mils 3.4.7 Speetro"Weld FleeceBACK: Specfro-Weld length must be selected to penetrate Into the concrete deck adhered roofing systems. adhesive can be used with all Sure-Seal or Sure-Weld AFX applicable code. PROTECTION Ce4isle ethylene propylene diene monomer (EPDM) [0.050Inch(1.27 rate)]to 80 mils[O.OBO Inch(203 rate)]. FleeceBACK Is the Spectro-Weld membrane with a a minimum of 1 Inch(25.4 mm). 3.10.1 90-8-30A Bonding Adhesive:90-8-30A Bonding membranes as a one-sided,wet lay-in adhesive.It has a Section:07 53 23-Ethylene-Propylene-Oiene"Monomer Adhesive is a high-strength, solvent-based contact coverage rate of 67 square feet per gallon(1.6 m2IL).The 4.2 Fire Classification: Roofing polyvinyl chloride(PVC)and thermoplastic poyolefin(TPO' laminated 5.5-ounce-per-square-yard (0.18 kglm2) 3.9.5 CD-10 Fastener:The CD-10 Is an epoxy-coated, 9 3.3.2 Sure-Flex KEE HP:Sure-Flex KEE HP Is a heat" adhesive used to adhere EPDM membranes to the adhesive is supplied in 5-gallon(18.9 L)containers with a 4.2.1 New Construction:The adhered and mechanically single-ply roofing membranes are used as roof coverings it weldable theramo taste membrane that consists is of a Polyester fleece backing. It is 115 mils [0.115 Inch hammer"driven,nonthreaded fastener specifically designed Section:07 54 19-Polyvinyl-Chloride Roofing adhered and mechanicelly fastened membrane roofer P (2.92 rate)]thick. to be used with Insulation and seam fastening pierce to insulation Or substrate. It has a coverage rate of shelf life of one year. fastened EPDM, PVC,and TPO single-ply membrane Section:07 54 23-Thermoplastic-Pot lefin Roofing polyester fabric that is encapsulated by KEE HP based top approximately 80 square feet per gallon(1.5 m2IL)when 3.10.10 FAST Adhesives:FAST 100,FAST 100LV,and roofing systems,when Installed in accordance with this Y° systems. and bottom piles.Available thicknesses range from 50 mils 3.5 Insulation: secure membrane end Insulation to structural concrete. applied to the finished surface area.The adhesive is Flexible FAST Adhesives are two-component report,are Class A,B or C roof covering systems in ' 3.0 DESCRIPTION [0.50 inch(1.27 ram))to 80 mils[0.80 Inch(2.03 ram)]. See Tables 2 through 5 for insulations for use with specific • Fastener length must be selected to penetrate Into the supplied In 5-gallon(18.9 L containers end has a shelf Ire p ant polyurethane accordance with ASTM E108 or UL 790,as noted in Tables REPORT HOLDER: g p concrete deck a minimum of 1 Inch(25.4 ram). g ) adhesives used to adhere FleeceBACK membran.and 2 and 3. 3.1 General: 3.9.3 Sure-Flex PVC FRS:Sure-Flex PVC FRS Is a heat- roofing systems.Foam plastic Insulation,where used,must of one year. insulations to various substrates.The adhesives have a CARLISLE SYN7EC SYSTEMS, A DIVISION OF weldable thermoplastic membrane that consists IN a have aHama-spread index of not more then 75 when tested 3.8.8 Lite-Deck Fastener:The Lite-Deck Fastener Is used 3.10.2 Aqua Base 120 Bonding Adhesive:Aqua Base 120 coverage rate of approximately 100 square fed per gallon 4.2-2 Reroofing:The existing deck must ba inspected to The EPDM,PVC and TPO Membrane Roofing System: g ptop at the maximum thickness Intended for use in accordance In conjunction' with a specially designed 3-inch BondingAdhesive is a hi h-siren th,water-based contact (2.5 m/L).The adhesives are supplied in 5-gallon verify that the structure to be rerouted is structurally sound CARLISLE CONSTRUCTION MATERIALS,LLC fiberglass reinforcement encapsulated with PVC based P g g (18.9 L) fY y described in this report consist of single-ply roofn( and bottom piles.Available thicknesses range from 60 mite with ASTM E84 or UL 723. (78.2 ram)Lire-Deck Metal Plate for Insulation attachment adhesive used to adhere EPDM and TPO membranes to the jugs,15-Baton(56.7 L)and 50-gallon(189 L)drums,box and adequate to support and secure the roofing membrane. EVALUATION SUBJECT: membranes,insulation where used,barrier board or ell{ [0.80Inch(1.52 ram))to 80 mils[0.80 inch(2.03 ram)]. 9.8 Barrier Board: to gypsum,cemeniltious wood fiber(Teclum IESR•11121), insulation or substrate. It has a coverage rate of sets,cartridge tubes,dual tanks,and/or cylinders,and he. Prior to Installation of new roof coverings,inspection by and shed where used,flashing,mechanical fasteners am and lightweight concrete decks.Fastener length must be a shelf life of one pprova g jurisdiction CARLISLE EPDM, PVC AND TPO SINGLE-PLY adhesives that am installed on a combustible a 3.3.4 Sure-Flex PVC FleeceBACK: Sure-Flex PVC Barrier board, where used, must be either minimum selected to penetrate Into the deck a minimum of 2 Inches approximately 120 square feet per gallon(3 m2/L)when year. written b a I from the code official having ROOFING MEMBRANES noncombustible deck.See Table 1 for Carlisle product trade scrim and membrane consists of polyester reinforcing 'fa-inch-thick (6.4 mm) Georgia-Pacific Gypsum LLC (50.8 ram). applied ID the finished surface area.The adhesive is 3.10.11 OlyBond 500 Adhesive:OMG Roofingproducts must be required. names.and corresponding product names for Mule-Hide scrim and polyester fleece backing.Available thicknesses "DensDeck°Rooiboard"or"DensDeck Prime°Roofboard," supplied In 5-gallon(18.9 L)containers and has a shelf life OlyBord 500 Spot Shot and OlyBond 500 BA are Class A a or C root covering systems may be installed ADDITIONAL LISTEES: Products Company,Inc.,WeatherBond,Versico, Kell) range from 115 mile[0.115 Inch(2.92 ram)]to'135 mils minimum Winch-thick (6.4 mm) Owens Coming 3.9.7 GypTec Fastener:The GypTec Fastener is a glass- of one year. two-component polyurethane adhedves used to adhere over existing classified roof covering systems under the Company/2001 Inc.,and Roofing Products International [0.135 Inch(3.43 mm)]. "StrataGuard," minimum V.-Inch-thick (8.4 mm) USG filled nylon auger fastener designed for securing 3.10.3 Low-VOC PVC Bonding Adhesives: Low VOC insulations to various substrates.The adhesives have a following cend'N""one without additional roof classification KELLY COMPANY/2001 INC. Inc.,the additional listees. Corporation "SECUROCK°Gypsum-Fiber Roof Board" mechanically attached membranes and Insulation to PVC Bonding Adhesives Is high-strength,solvent-based coveragerate of approximately 100 square feet per gallon ,provided the resulting classification is the lower of the 9.9.5 Sure-Flex KEE HP FleeceBACK:Sure-Flex KEE or"SECUROCK°Glass-Mat Roof Beard,"or minimum gypsum and cementehous wood fiber(Teclum[ESR-11121) contact adhesives used to adhere PVC membranes to an (2.5 m2IL).The adhesives are supplied in cerridge tubes new or existing roofing dessificetion: MULE-HIDE PRODUCTS COMPANY,INC. 3.2 EPDM Membranes: HP FleeceBACK membrane consists of a polyester Winch-thick(12.7 mm)gypsum board.Banker board must decks.Fastener length must be selected to penetrate Into Insulation or substrate.They have a coverage rate of and box sets,and have a shelf life of one year. ■New uninaulatad systems installed only over existing reinforcing scrim,polyester fleece backing,and DuPont° g applications or ULalaselfed ( approximately 60 square feet per gallon(1.5 m2IL)when 3.10.12 EPDM X-23 Low-VOC Bonding Adhesive: uninsulated assemblies. 3.2.1 Sure-Seal: Sure-Seal Is a black, nonrdnfocek Elvalo KEE HP copolymer.Available thicknesses range be UL-classified for rodin the deck a minimum of 1.51nches 38.1 ram). VERSICO - )/sg EPDM membrane,45 mils thick[0.045 inch(1.14 ram)). gypsum board. 3.9.8 HP Polymer Seam Plate:This Is a 2-inch-diameter applied'to the finished surface area.The adhesive EPDM X-23 Low-VOC Bonding Adhesive is a high strength, ■New insulated systems installed over existing from 105 mils [0.105 inch (2.67 ram)] to 135 mils Y WEATHERBOND 3.2.2 Sure-Seal FR: Sure-Seal FR is a black [0.135 Inch(3.43 ram)). 3.7 Slip Sheet: (50 mm)polymer plate designed to be used with HP and HD supplied In 5-gallon(18.9 L)containers with a shelf life of solvent-based contact adhesive used to adhere EPDM uniceulated systems only. nonreinforced EPDM membrane with fire retardants 14-10 fasteners to mechanically attach roofing membranes one year. membranes to an insulation or substrate.It has a coverage 3,3,6 Sure-Flex PVC FRS FleeceBACK:Sure-Flex PVC The slip sheet,where used,must include Cariieie"FR Base rate at 4.3 Wind Resistance: ROOFING PRODUCTS INTERNATIONAL,INC. Available thicknesses range from 45 mils (0.045 Mot Sheet iS or 2S,"GAF"VersaShleltl°Fire-Resistant Roof to the roof deck. 3.10.4 Sure-Weld TPO Bonding Adhesive:Sure-Weld approximately 60 square feet per gallon(1.5 m2IL) 1 14 ram to 90 mils 0 090 inch[2.29 mm FRS FleeceBACK membrane consists of a highstrength when applied to the finished surface area.The adhesive is 4.3.1 New Construction: The allowable wind uplift 1.0 EVALUATION SCOPE I ]) (' ])' fiberglass scrim and polyester fleece backing.Available Deck Protection (ESR-2053)," Elk 'VersaBhield 3.9.9 Sure•Tito Fastener and 8T Fastening Bar:This is TPO Bonding Adhesive is a high-strength,solvent-based supplied in 5 allon 18.9 L 3.2.3 Sure-White:Sure-White is a white,nonreinfomer thicknesses range from 115 mils[0.116 inch(2.92 ram)]to FB-1S or FB-23",or Atlas"FR 10 or FR 50."Slip sheets a heavy-duty,epoxy-coaled steel screw and bar used to contact adhesive used to adhere TPO membranes to an a year. g ( )containers with a shelf life d pressures for the EPDM,PVC,and 7P0 roofing membranes Compliance with the following codes: EPDM membrane.it is available in thicknesses d 60 mile 135 mile[0.135 inch(3.43 mm)]. must be UL-classified for roofing applications. secure reinforced EPDM membranes to steel or wood deck. Insulation or substrate. It has a coverage rate of or 1/e as parts of roof assemblies are noted In Tables 4 and 5. ■2018,2015,2012 and 20091ntemafional Building Codes [0.0601nch(1.52 ram)]and 90 tells[0.0901nch(2.29 ram)]. 3.9.7 Sure-Flex KEE,HP FRS FlesIwBACK:Sure-Flex 3.8 Flashing: The bar is 1-Inch-v ice-by-0.040-inch-thick-by-l0-foot-long approximately 60 square feet per gallon(1.5 m2IL)when 3.10.13 CAV-GRIP III Low-VOC Adhesive/Primer:CAV- Metal edge securement systems must be listed in (25.4 ram by 1.1 ram by 3.1 m)galvalume"coated steel with applied to the finished surface area.The adhesive Is GRIP III Low-VOC Adhesive/Primer is a contact adhesive accordance with the 2011 edition of ANSUSPRI/FM4435 (IBC) 3.2.4 Sure-Tough:.Sure-Tough is a black, reinforcer KEE HP FRS FleeceBACK membrane consists of a Flashing must be provided in accordance with IBC Section pre-punched holes 6lnches(150 ram)on center, supplied in 5-gallon(18.9 L)containers with a shelf life of used to adhere EPDM and TPO membranes to various ES-1 and designed and installed for wind loads in ■2018,2015,2012 and 2009 International Residential membrane consisting of a polyester reinforcemen fiberglass reinforcing scrim,polyester fleece backing,and 1503.2 or IRC.Section R903.2,as applicable.Where one year. substrates.It has a coverage rate of 1000 ft.per cylinder accordance with IBC Section 1504.5 and IBC Chapter 16. plies Code°(IRC) encapsulated between two EPDM membrane plies.It I: DuPont. Elvaloya KEE ,HP copolymer. Available flashing is of metal,the metal must he corrosion-resistant, 3.9.10 HP-X Fastener.This M an epoxy-coated carbon when applied to the finished suriace area.The adhesive Is g g [ ( )] gage[ ( )]galvanized steel screw used In combination with the Piranha Fastening 3.10.5 Low VOC Bonding Adhesive:Low VOC Bonding supplied in No.40 c 4.9.2 Reroofing:Mechanicaly anchored systems may he t available In thicknesses ranging from 45 mils[0.045 Inc! thicknesses range from 105 mils 0.105 inch 2.67 ram to minimum No.2fi a a 0,019 inch 0.483 ram Adhesive Is a hi h strength, solvent-based contact Hinders with a shelf Me of one year acts t d based an the ■2013 Abu Dhabi International Building Code(ADIBC) (1.14 ram)]to 75 mils[0.075Inch(1.90 ram)]. 135 mils[0.135 inch(3.43 ram)]. steel. Plate to mechanically attach TPO membranes to steel or 9- (unopened). P° adequacy of anchors penetrating IThe ADIaC Is based m the Zoos IBC.2mg lac rode sections referenced wood substrate. Fastener length must be selected to adhesive used to adhere EPDM end TPO membranes to an through existing roof coverings into structural substrates. in this report are the same sections in she ADIBC. 3.2.5 Sure-Tough FR: Sure-Tough FR le a black 3.4 TPO Membranes: 3.9 Fastenerc: penetrate through the steel deck a minimum of a4 Intl insulation or substrata. It has a coverage rate of 3.111mpact Resistance: Since the composition and/or condition of any particular reinforced membrane consisting of a polyeste 3.4.1 Sure-Weld:Sure-Wald membrane consists of a Fasteners, used to mechanically attach Insuletlon and (19.1 ram),end into the wood deck a minimum of 1 Inch approximately 60 square feet per gallon(1.5 m2/L)when The EPDM,PVC,and TPO roofing membranes described existing underiying material may vary widely,reroofing with For evaluation for compliance with codes adopted by the reinforcement fms encapsulated between two EPDM membrane membranes to the root deck,must be corrosion-resistant, 25.4 ram. applied to the finished surface area.The adhesive Is P° requirements for impact resistence in IBC adhered systems is outside the scope of this report. polyester reinforcement encapsulated between two plies of ( ) P M this report meet pa Los Angeles Department of Budding and Safety(LADBS), plies with fire retardants.Available thicknesses are 45 mill supplied In 5-gallon(18.9 L)containers with a shelf life of Section 1504.7,teased on tesWg in accordance with Section 5.0 CONDITIONS OF USE TPO.The membrane Is available in white,gray,tan and and meat be Carlisle fasteners,plates or fastening bars, see ESR-1463 LABC and LARC Supplement. [0.045 inch(1.14 ram)]and 60 mils[0.060 Inch(1.52 ming. 3.9.11.Piranha Fastening Plate: This M a 2a/e-Inch- custom colors.Available thicknesses range from 45 mils unless otherwise noted In this report.Refer to Table 4 and one year. 4.6 of FM 4470. Properties evaluated: 5 for spacing offasteners. diameter galvalumecoated steel plate designed to be used 3.10.8 HydroBond Water-Based Bonding Adhesive: The single-ply EPDM,PVC,and TPO roofing membranes 3.2.6 Sure-Seal FleeceBACK:Sure-Seal FleeceBACK k [0.045 inch(1.14 ram)]to 80 mils[0.080 inch(2.03 ram)]. with HP-X fasteners to mechanically attach PVC and TPO 4.0 INSTALLATION described in this report comply with, or are suitable ■Weather resistance a 45-mil to 90-mil[0,045 Inch to 0.090 inch(1.14 ram tk 9.9.1 HP Fastener:This is an epoxy-coated steel screw HydroBond Water-Based Bonding Adhesive is a water- • alternatives to what is specified in,those cedes listed in 9.4.2 Sum-Weld N3:Sure-Weld HS is the Sure-Waldmembranes to the roof deck. based,wet la one-sided adhesive to be used to adhere 4.1 General: pet 2.29 ram)]non-reinforced EPDM bonded to a polyeste membrane formulated with an additional flame retardant for used in combination with Carlisle's fastening plates or loam lay-in, Section 1.0 of this report,subjeclio the following conditions: •Roof covering fire classification fleece.Available product thicknesses range from 100 mil: fire resistance at higher slopes.The membrane la available to mechanicily attach roofing Insulation and membranes to 3.9.12 HP-XTRA Fastener:This M an epoxy-coated carbon Sure-Flex PVC,Sure-Flex PVC FRS and FleeceBACK Installation of the EPDM, PVC, and TPO roofing ■Wind uplift resistance [0.100 inch(2.55 ram)]to 145 mils[0.145 inch(3.68 ram)]. steel or wood substrate.Fastener length must be selected steel screw used In combination with the Piranha XTRA membranes to an Insulation or substrate.It has a coverage membranes described in this report must comply with the 5.1 Installation must comply with the applicable code,the In white,gray,ten Inc custom colors.and Available thicknesses a rate of 100 square feetpergallon(2.5 m2IL).The adhesive applicable code,the manufacturers published installation manufacturers ■Impact resistance 3.2.7 Sure-While FleeceBACK:Sure-White FIceceBACY are 45 tells(0.045 Inch[1.14 ram]) 60 tells(0.080 inch to penetrate through the steel deck a minimum of 4 Inch Fastening Plate to mechanically attach PVC end TPO thus report.The instructions insshuctions and p is a 45-, 60-or 90-mil [0.045, 0.060 or 0.090 ind [1.52 ram)). (19.1 mm), and into the wood deck a minimum of membranes to steel or wood substrate.Fastener length Is supplied in 5-gallon(918.9 L)containers with a shelf life instructions and this report The manufacturers published report must 1 inch(25.4 mm). must be selected to penetrate through the steel deck a of one year. installation Instructions must be available at all times on the govern if there are any conflicts between the 3A.3 Sure-Weld SAT-TPO:Sure-Weld SAT-TPO Is a self- minimum of a/x Inch(19.1 mm)and into the wood deck a jobsite during stellatioh. manufacturers Insallaton instructions and this report. adhered version IN the Sure-Weld HS membrane with 3.9.2 In teal screw!Insulation Fastener:This is an epoxy- 3.10.7 Low VOC Bonding Adhesive 1168, Low VOC gl" ICC-Rsswduation Repo.ore ear,a he ammedaa p.eeeodasa.need.r am on:rumb ie$xotspe<y ly addressed,eaare'key.be ro,mAued coated steel used In combination with Carlisle'- minimum of 1 inch(25.4 ram). Bonding Adhesive 1168 Is high-strength,solvent-based The substrate to which the membrane is to be applied 5.2 The adhered and mechanically fastened single-ply on fnnov or other oco,abjafuu,mo repo,m:oo,vproducra, byee Mere;,ao.oreaa yeyrccamr„ana„se,.,a,HE.rxy,r„wmWre, $11�l adhesive. Insulation plates tomechenioll attach roofing insulation to 3.9.13 Piranha XTRA Fastening Plate:This is 2a/s-inch- contact adhesive used to adhere EPDM and TPO must be dean,dry,and free of frost,loose fasteners,and membrane roofing systems must be installed by Co ypaeasa.aeee.aarx,are,n xeeclon LLC. 01:0 rights sv ra=,yar. ,,.e.d ._ p d su y 0 protesslonal roofingcontractors who am trained and 3.4.4 Sure-Weld FleeceBACK:Sure-Weld FleeceBACK steel or wood substrates.Fastener length must be selected diameter galvalume-ceeled steel plate deigned to be used membranes to an Insulation or substrate.It has a coverage other protrusions or conteminates that will interfere with the Copyright 020te ICC Evaluation Service,LLC.All rights reserved. - Pagel ufl- is the Sure-Weld HS membrane,45 mils[0.045 Inch to penetrate Through the steel deck a minimum of d/x inch with HP-XTRA fasteners to mechanically attach PVC end rate of approximately 60 square feet per gallon(1.58 m2/L) adhesion or attachment of the membrane or that will approved by the manufacturer. •ror,..,e...i,.-.,ve to the melt Hark whon anoliad to the finished surface area.The adhesive is puncture the membrane.All materials must be protected 5.3 Foam plastic insulation must be separated from the ESR-1463 I Most Widely Accepted and Trusted Page 5of13 ESR-1463 I Most Widely Accepted and Trusted Page 6 of 13 ' ESR-14831 Most Widely Accepted end Trusted Page 7 of 13 interior of the building by.an approved thermal barrier additional Iistee,the manufacturers address or plant TABLE 1--PRODUCT NAMES in accordance with IBC Section 2603.4.1.5 or IRC code end the ICC-ES evaluation report number KEILYCO.I TABLE 1-PRODUCT NAMES(continued) ESR-1463 I Most Widely Accepted and Traded Page7of lS Section R316.4,as applicable. (ESR-1463). CARLISLE MULE-HIDE PRODUCT nensicO PRODUCT WEATHERBOND PRODUCT ROOFING PRODUCTS 2001 INC. INTERNATIONAL PRODUCT NAME PRODUCT NAME NAME NAME NAME KELLY co./ ROOFING PRODUCTS 5.4 Foam plastic insulation,Where used,moat bear the 7.2 The report holders contact information Is the following: PRODUCT NAME CARLISLE MULE-HIDE PRODUCT VERSICO PRODUCT WEATHERBOND TABLE 1-PRODUCT NAM (continued) 20011NC. NAME NAME PRODUCT NAME INTERNATIONAL label Of an approved agency indicating That the foam SureSeal CEPDM Mule-Hide Standard VersiGeN Non-reFfarced Wealher9ontl EPDM Nth- Royal Edge Nth- PRODUCT NAME PRODUCT NAME PRODUCT NAME KELLY CO/ ROOFING PRODUCTS CARLISLE SYNTEC SYSTEMS,A DIVISION OF Black EPDM EPDM Reinforced Membrane Reinforced EPDM CARLISLE 20011NC. MULE-HIDE PRODUCT VERSICO PRODUCT WEATHERBOND INTERNATIONAL plastic has a flame-spread Index of not more than 75 CARLISLE CONSTRUCTION MATERIALS Cold Applbd Adhesive - Cold Applietl Adhesive Cold Applied Adhesee Cold A plied PAheelve RPI Cold Applied PRODUCT NAME PRODUCT NAME NAME NAME PRODUCT NAME pnosucT NAME when tested at the maximum thickness intended for Sure-Seel FR C-EPOM.0 Ode-Hide FR EPDM VehiGerd FR Non- WedhaBond EPDM FR Royal Edge Non- P Adhesive POST OFFICE BOX 7000 Reinforced EPDM Non-Reinforced Membrane Reinforced FR EPOM RPI Cold Applied use in accordance with ASTM E84 or UL 723,subject FAST 100 Adhesive - DASH 100 Adhesive - - Cold Applied Adhealve - Cold Applied Adhesive Cold Applied Adhesive Cold Applied Adhesive Adhesive CARLISLE,PENNSYLVANIA 17013 S,reSeel FleeceBACK GEppµpB VerslFleem EPDM WeatherBond Fleece EPDM Royal Edge EPDM to the approval of the code official' (717)245-7000 Membrane FleeceBACK FAST 100-LV Adhesive - Helix°2 Low-Rise OAST Adhesive OASHAdhealve FasBond 100 LV FAST 100 Adhesive • DASH 100 Adhesive - • 5.5 Design wind uplift pressure on any roof area,including www.carllabsvntec.com sure-Seal AFX C-EPDM-AFX - VeaiFleece AC EPDM WeatherBond EPDM AC Adhesive Adhesive edge and Comer zones,must not exceed the allowable - He1x°Max Law-Rise Helix°2 Low-Rice FeetB°nd 100 LV Fleece MembraneFeslBond Flex Adhesive FAST 100-LV Adhesive • OAST Adhesive DASHAdheaNa Flexible FAST AdhesiveFlexible DAST Adhesive Flexible DASH Adhesive Adhesive Adhesive 7.3 The Additional Listees'contact information Is theAdhesive Wind uplift pressure for the system Installed In that following: Sure-Tgph GEPDMC,Type2 Meinfored Standard VerslGard Reinforced WeatherBond Royal Edge Reinforced OI nd 500 AdhesNe - olyennd 500 Adhesive OlyBond 500 Adhesive OlyBond 500 Adhesive Flexible FAST Adhesive Helix°Mez Low-Rise Fledble DAST Adhesive Flexible DASH Adhesive Fes and Flee Adhesive particular area.Refer to allowable wind uplift pressures Reinforced EPDM EPDM Reinforced Membrane EPDM '�° - Adhesive for systems as listed in Tables 4 and 5. KELLY COMPANY/2001 INC. Sure-Tough FR C-EPDM-CR Reinfoced Mule-Hide FR VersIGaNFR Reinforced WeatherBond EPDM FR Royal Edge Reinforced OlyBond 500 AdhesNe - - OlyBond 500 Adhealve OlyBond 500 Adhesive OlyBond 500 Adhesive 5.6 The allowable wind uplift pressures listed In Tables 4 325 THOMASTON AVENUE Reinforced EPDM EPDM Reinforced Membrane Fire Rated EPDM WATERBURY,CONNECTICUT 08702 Sure-White c.EPDM-Whte Mule-Hide Whte-on- Voeldam-While WeatheBontl EPDM White Re-Flex White EPDM TABLE 2-FIRE CLASSIFICATION ASSEMBLIES-ADHERED ROOFING SYSTEMS.and 5 are for the roof coveting system only.The deck (203)575-9220 Black EPDM Standard Membrane and framing to which the system Is attached must be SYSTEM ROOF MAX BARRIER BOARD TABLE 2-FIRE CLASSIFICATION ASSEMBLIES-ADHERED ROOFING SYSTEMS'° designed for the applicable components and cladding Sure-White FleeceBACK GEPDMFB-Whoa - - - Re-Flex While EPDM DECO SLOPE INSULATION` MEMBRANE MULE-HIDE PRODUCTS COMPANY,INC. FleeceBACK NO. CLASS OR SLIP SHEET SYSTEM ROOF MAX BARRIER BOARD Wind loads In accordance with the applicable Code. 1195 PRINCE HALL DRIVE • Vershoee Reinfomed WeaherBond TPO Re-Flex TPO 1 14:12 Sure-Weld,Spectre-Weld Na CLASS DECK SLOPE OR SLIP SHEET INSULATIONS MEMBRANE 5.7 When application Is over existing roofs,documentation BELOIT,WISCONSIN 53511 Sure-Weld TPOq( Mule-Hide TPOc - of the wind-uplift resistance of the composite roof (800)786-1492 TPO Membrane Membrane Sue-Weld HS TPO-KFR Mule-Hide TPOc(FR) VersM/eld HS WeatherBond TPO High Ro-FIex TPO HS Sure-Seal FR,Sure-Tough, 1 Y41p Sure-Weld,Spectro-Weld construction must be submitted to the code official for Slope Membrane Sure-Whole,SureSeal FleeceBACK, approval at the the of permit application. VERSICO Vereweld OA TPO WedhheBond TPO PAS Regnee TPO SAT 2 14:12 Anyof the following Sure-Weld H$SFleecadSAT-TPO, Sure -Seal Reeugh, n Sure-Weld FleeceBACK, Sure-White,Sure-Seel FleeceBACK, Sure-Weld SAT-TPO TPO-K_SA7 Mule-Hide ShTPO Insulations,1-Inch min.to Sure-Weld HS,Sure-Weld SAT-1 eO, POST OFFICE BOX 1289 Membrane Membrane SPdxro-Weld FleeceBACK, 2 'Ir:12 Any of the following 5.8 For holdings under the IBC,above deck thermal CARLISLE,PA 17013 &inch max.thickness: Sure-White FleeceBACK Insulations,7-inch min.to Sure-Wald FleeceBACK, Mule-Hide TPOc WeatherBond FleecaTPO Ro-Fbx TPO A Noncombustible - Carlisle"SewrShield Spectro-Weld FleeceBACK, Sure-Weld FleeceBACK 1PO4(FB Sure-While FleeceBACK insulation board must comply with the applicable 800 992.7663 Fleece Beck VB1BiFlB°OOTPD Membrane - FleeceBACK Pol Iso"," 8-inch max thickness: standards listed In IBC Table 1508.2 or IRC Table ( ) y In'Ft -she", Sure-Flex PVC FleeceBACK, A NmcambusllWe - Canlsle'SecurSihleid R908.2,as applicable. WEATHERBOND Sure-Weld AFX TPO -AFX Mute-Hide TPOc V�IFleece AC TPO Wee 000 Me TPO AC - 3 s4,12 HunterorTI.ohla.CG" " Sure-Flex KEE HP FRS FlneoeACK, 5.9 The rooting membranes are manufactured at Carlisle, POST OFFICE BOX 251 Fleece Bed Flue Fleece Membrane °r.'HShIeM-CG' SuSure -Flex ez PVC FRS FleeceBACK, eater o","InsulBase', Sure-Flex PVCHP FleeceBACK, Pennsylvania;Greenville.Illinois;Tocele,Utah;and PLAINFIELD,PENNSYLVANIA 17081 Spectro-WWeld Sure-Flex KEE HP FRS FleeceBACK HarterH-ShPanels d-CG"dd" Sure-Flex rFl KEE FR FleeceBACK, SpeWeM 3 Ye:12 or HShteld-CG" Sure-Flex PVC FRS FleeceBACK, • Senatobla,Mississippi,under a quality control program (866)471.5125 FleeceBACK - - - - 4 2:12 Sure-Flex PVC,Sure-Flax PVC FRS, Sure-Flax KEE HP FRS FleeceBACK Sire-Flex KEE HP Sure-Flex PVC,Sure-Flex PVC FRS, with inspections by ICC-ES. Mule-Hide PVC Weenwreatl WC RSFhx we 4 2:12 8.0 EVIDENCE SUBMITTED ROOFING PRODUCTS INTERNATIONAL,INC. Sure-Flex PVC - Membrane VersIFlez PVC Membrane 5 e4,12 Sure-White FleeceBACK Sure-Flex KEE HP 57460 DEWITT STREET Data In accordance with ICC-ES Acceptance Criteria for EOO)628,INDIANA 46517 Sure-Flex KEE HP Mule-Hoe„ �C KEE HP WaeM fen KEE HP Re-Flex KEE HP 6 1.12 Sure-Seal FR,Sure-White,Sure-Seal FleeceBACK, 5 '4'12 Sure-While ReeleBACK • ane VersiFlex KEE HP VxdncMihld Oberboerds, Membrane Roof-covering Systems (AC75), dated 0300)628.2957 i, S/finch-thick fiberboard' 8 1:12 Sure-Seal FR,Sure-Tough Mule-HHide PVC FRS WeetheBond PVC FRS Re-Flex FRS PVC Sure-Weld,Spectra-Weld,Sure-Weld '/rbnch-thick fiberboards, July 2010 (editorially revised March 2018). sureFler PVC FRS - Membrane yerdFlex FRS PVC or banner board H3,Sure-Weld SAT-TPO, Winch-thick fibemoards Sure-Whole, ure-Seal FleeceBACK, Membrane (see Section 3.6)over Sure-Weld,Spectre-Weld,Sure-Weld Sure-Weld FleeceBACK, . or barrier board Sure-Flex PVC Maoack a PVC WeatherBond PVC Fleece - A Nenoombuetihie - 5-inch max Inaulfoam HS,Sure-Weld SAT-TPO, FleeceBACK - Fber Beck Membrane VerslFleeca WC Membrane EPS',VrMch-thick SpecVo- Weld FleeceBACK, (see Section 3.6)over Sure-Weld FleeceBACK, 7.0 IDENTIFICATION 7 1'/s:12 Sure.Flex PVC,Sure-Flex PVC FRS, A Noncombustible - 5.inch mexlnsolfeem Sure-Flex KEE HP - Mule-Hide PVC KEE HP WeetheBontl KEE HP - fiberboard or harder board Sure-Flex KEE HP, EPS.,'/a-Inch-ihidk Spectre-Weld FleeceBACK, Veaifleece KEE HP (see Section 3.8)over r 14s:12 Sure-Flex PVC,Sure-Flax PVC FRS, 7.1 Each roll of the roofing membrane must bear a label FkmmBACKFleece Bad Membrane Fleece Membrane noting the product name,the manufacturers name Sure-Flax PVC FleeceBACK, fiberboard or barrier board Sure-Flex PVC FRS WeatherBond PVC FRS Re-Flex FRS PVC Systan No.i Insuladans Sure-Flex KEE HP FleeceBACK, (see Section 3.6)over Sure-Flex KEE HP, (Carlisle SynTec Systems) or the name of the FleeceBACK - - VandFleece FRS PVC Fleece Membrane ReemBACK Sure-Flex PVC FRS FleeceBACK, System No.i lneulafbna Sure-Flax PVC FleeceBACK, Sue-Flex KEE HP FRS Sure-Flax KEE HP FRS FleeceBACK Sure-Flex KEE HP FleeceBACK, FleeceBACK - - VersiReer FRS KEE HP Weatheoue o KEE HP FRS - Sure-Flex PVC FRS FleeceBACK, Fleece Membrane S e4:12 Sure-While FleeceBACK 6 ..' 1'S'I'I''-'1"" 8"C. S0-8J0A Bonding 2001 Ina Bonding Mule-Hide Bonding G2005A Yellow Royal Edge Bonding 9 1'/a:12 Sum-White,Sure-Seal FleeceBACK 8 .4:12 Sure-While FleeceBACK Adhesive Adhesive Adhesive Substrate Loaf V0dhesive LC-60 Bonding Adhesive Adhesive Sure-Tough,Sum-Weld,Spectro-Weld, a 1'/y:12 Sure-White,SureSod Fe00001ACK . EPDMX-23 Low-VOC ' EPDM X-23 Low VOC EPDM X-23 Low VOC EPDM X-23 Low VOC Bonding Adhesive - Bonding Adhesive Bonding Adhesive Bonding Adhesive 10 Noncombustibleable 9:12 V.-inch thick Sure-Weld FleeceBACK, Sure-Tough,Sure-Weld,Spectro-Weld, or Combus0bie "DensDeck Prime" Spectro-Weld FleeceBACK 10 3:12 Sure-Weld FleeceBACK, Solvent-Free EPDM Solvent-Fee EPDM Solvent-Free EPDM Bonding R E Solvent-Fee Noncombustible '/e-inch thick g Royal Edge 71 -min.`s/mirhdt- q;i2 or thick Sure-Weld HS,Sure-WeM SAT-TPO S Weld FleeceBACK Bonding Adhesive - - Bonding Adhesive Adhesive EPDM Bending Adhesive A - or CombusOble "DensDeck Prime" P°°tro- g thick plywood lmdoda Gypsum Sure-Seel FR,Sure-Flex PVC, -min.`Ve.bnch- or4-inch thick Aqua ease 120 Bonding Aqua Base 120 Bonding Aqua Base 120 Bonding Aqua Base Adhesive Burbling Royal Edge Weser Based 12 m /Se-Inch- Unlimited Gypsum Fiber Roof Sure-Flex PVC FRS,Sure-Flex KEE HP 11 A thick plywood or • 4:12 "SECUROCK - Sure-Weld HS,Sure-Weld SAT-TPO Adhesive AdhasNe Adhesive Adhesive Bonding Adhesive thick OSB. Board' P10-le Sure-Seal FR,Sure-Flex PVC, n./Orion- Unlimited Gypsum Fiber Roof Sure-Weld TPO Bonding M riding a TPOc VeraWeltl TPO Bondi I Edge EPDMRPO Sure-Flex PVC FleeceBACK, 12 col Sure-Flex PVC FRS,Sure-Flex KEE HP Adhesive - Bonding Adhesive Adhesive TPO Bontling Adhesive Bonding Adhesive 13' 3:12 Sure-Flex KEE HP FleeceBACK, thick OSB. Board" LOW VOC Bonding Low VOC Bonding LOW VOC Bonding LowyOC Bonding Adhesive Royal Edge Low VOC Sure-Flex PVC FRS FleeceBACK, Sum-Flex KEE HC FleeceBACK, Sure-Flex KEE HP FleaceeACK, Sure-Flex KEE HP FRS FleeceBed 13 3:12 Sure-Flex PVC FRS FleeceBACK, Adhesive - Adhaslve Adhesive Bonding Adhesive Low VOC Bonding Low VOC Bonding Low VOC Bonding Low VOC Bonding Adhesive - Sure-Flex KEE HP FRS FleeceB9d Adhesive 1168 . Adhesive 1168 Adhesive ime _ 1168 Low VOC PVC Bonding Low-VOC PVC Bonding Low-VOC PVC Bonding Low-VOC PVC Bonding ReFlee PVC Law VOC -Adhesive - Adhesive Adhesive Adhesive Bonding Adhesive Hydr Bond Water- HydroBond Water- e Basal reeks - Based BondingH Bonding ng Adhesive HydBoonnddi gAdhesv Water-Based Adhesive Adhesive- • CAV-GRIP II I Low VOC Csv-Grip 3V Low VOC Cav-Grip III Low VOC - AdheslvelPrimer AdroWeb AdheaFre Adhesive/Primer Adhesive/Pdmer ' 17 MECHANICALLY ATTACHED PVC ASSEMBLY PLATE Assembly Identification TABLE 113:WOOD DECKS-NEW CONSTRUCTION,REROOF(Tear-Off)or RECOVER Membrane Thickness Membrane Type SYSTEM TYPE D:INSULATED,MECHANICALLY ATTACHED ROOF COVER(STRESS PLATES) 5=50 mil(1.27 mm) I I R=Reinforced system Deck Insulation(See Note La) Roof Cover Tested Fire Whine Ne. (See Nate I) Wintl LIMO/MOB 6=60 mil(1.51 mm) S=Single Ply-, 1-Attachment P=Polyester Fleece Backed ESP. Attachment Membrane Fasteners Attachment Uplift Class Max (MH) Incline 7=72 mil(1.83 mm) PVC Membrane M=Mechanically Attached on.) 8=80 mil(2.03 mm) R=RhinoPlate Attached W-9 Wood Deck (Optional)INSULATION followed Prelim.Attached JM TPO 95, JM APB Plates Fasteners spaced 4"o.c. 75 A 1 (T19/32P, by min.0.25'Invinsa FR Roof 60,or BO and High Load within 6"wide laps; L24,N6) Board,1/2-In.ProtectoR HD FR, Fasteners fastener rows spaced 114" Project Name: Class A fire rated assembly or min.3/8-in.SECUROCK o.c.Laps sealed with 1.5' Timber Ridge Gypsum-Fiber Roof Board, heat weld. Project Location: Min.0.5-in.SeparatcR CGF or 1/2 Mechanically Attached Membrane IJM Bomil PVC I ProtectoR HD,min.1.5"ENRGY 3 Project Number: CGF W-10 Woad nark IOntionall MSU/ATtON follower, Prelim Attarhed 1M TPO 95 All Purpose Fasteners snared 6"n r 75 A 1/2 (T19/32P, by min.1/2-in.ProtectoR HD, 60,or 80 Fasteners and within 6"wide laps; INVINSA®FR ROOF COVER L24,8d4/6) 1/2-In.ProtectorR HD FR 11,1 High Load fastener rows spaced 90" A 1 BOARD Plates o.c.Laps sealed with 1.5" heat weld. Tapered EPS Poly Foam W-11 Wood Deck (Optional)INSULATION followed Prelim.Attached :::°: 120AA�� W-12 Wood Deck (Optional)INSULATION followed URh 120 Avnr/� 0 Fasteners and 6'wide laps spaced 90" - -.....°- N111140011111' '' .411111111 '........''‘el L24, Plates attached 1 Plates 1 2/4) per 6.9 IV ��j O Wood Deck / O _-4 For JM Guarantee Requirements Contact JM Technical Services at(800)922.5922 Option 3 or Refer to the JM Peak Advantage Charges and Requirements-Single Ply document PVC Membrane and Specification Number: Approved Cover Boards:(If Applicable) Approved JM Insulations: Approved Vapor Barer: JM PVC with Dupont'°Elvaloy KEE polymer ❑Invinsa"Roof Board 0 ENRGY 3° (If Applicable) 050 mil SPERM 0 Invinsa Plus (ENRGY 3 Options) 0 DynaBase°(CA)(HA) O 60 mil SPERM 0 SP6RR In Invinsa FR Roof Board 0 AGF ❑DynaBase PR(CA)(HA) Page 14 of 85 080 mil SPERM 0SP8RR ❑RetroPlus"^Roof Board OCGF 0GlasPly9V(HA) JM PVC SD Plus JM DEXCELL° 0 FR 0 GlasPly Premier(HA) ❑50 mil SPERM 0 FA Glass-Mat Roof Board 0 20 PSI 0 APPeX°4S(HW) ❑60 mil SPERM 0 SP6RR O Glass-Mat Roof Board ❑25 PSI 0 DynaWeld^"Bese(HW) ❑OD rail SPERM❑SPBRR JMSECUROCK° 0p Tapered ❑DynaBase HW(HW) JM PVC FB with Dupont Elvaloy KEE polymer 0 Gypsum-Fiber Roof Board 0 Invinsa Foam"' ❑DynaWeld 180 S(HW) 0 50 rail SPSPM O Glass-Mat Roof Board ❑JM API°'Base Sheet(HW) Doe DensDeck°Roof Board 0ji e55ip°Base SDISA(SA) 0 60 mil SP6PM ❑JM DensDeck Prime Roof Board Approved Thermal Banter: 0 JM Vapor Ba"SDISA(SA) 072 mil MIN. SP7PM (If Applicable) O JM Vapor Banter SA(SA) 080 mil SPBPM Separation Layer:(Re-cover only) JM SECUROCK° 06 or 10 mil poly (If Applicable) ❑Gypsum-Fiber Roof Board with taped seams ❑SeparatoRTMBoard ❑Glass-Mat Roof Board 0 JM 3 oz Polyester Slipsheet JM DEXCELL Deck Type: O FA Glaser-Mat Roof Board ❑Stands , IVED ❑FA Glass-Mat ss-Roof Board ❑Slandi ❑JM DensDeck Roof Board ❑Steel( DAM DensDeck Prime Roof Board ❑SVucturei Con,,,, (� 0Wootl(Prywo5 3jag0 Vapor Barrier Application Key(CA)Cold Applied (HA)Hot Asphalt (HW)Heat Weld (SfIBrrered BUILDING DEPARTMENT 14,1 5. Provide Final Inspection Report.The special inspector shall submit a written f al tl�r report documenting required special inspections and correction of any discrepancies llill 'R,'taprN noted in the inspections prior to the final building inspection. TM Ca rer farmSPECIAL INSPECTION AND TESTING AGREEMENT B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the ovmer is responsible for employing special-inspection services.The special inspector\agency shall To permit applicants of project requiring special inspection and\or testing per Section 1704 of the not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In G. Balding Department ResponaWBltles: International Building Code(IBC). case of an owner\contractor,the special inspector\agency shall be employed as specified by the I. Approve special-inspection program.The building department shall approve all special building official. intiicanors and special-inspection requirements Project Address: _ Enforce 100 E DEAN ST Permit Number:0003-2021-BRES speelal inspection.Work requiring special inspection and the building inspector shall C.Engineer or Architect of Record Responsibilities monitor the performance of special inspectors.His/Her approval.in addition la that of We special BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the I:-cror.most be obtained prior to placenncnt ofconca+c,coveting of structural sta:l,or other owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing 1. Prepare special inspection program.The engineer or architect of record shall list the srmJar materials. Schedule,including the required acknowledgments.A pre-construction conference with the parties items for which special inspection is required;and shall indicate any items for which the 3. Review inspection reports.The building official should review special-inspection progress and involved may be required to review the special-inspection requirements and procedures. IBC or the building official approves periodic inspection and the frequency of such final'mans. inspections. 4. Perform final i°°Pretion.The building official should poefonn the lineal inspection and approval APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the .m a t.tryeci[IBC Sec.180.3.11 after the final special-inspection report has been reviewed and projects for which they provide special inspections.Special inspectors shall be approved by the building 2. Respond to field discrepancies.The engineer or architect of record shall respond to improves department prior to performing any duties.Special inspectors shall submit their qualifications and are uncorrected field discrepancies in design,material,or workmanship observed by the subject to personal interviews for pre-qualification.Special inspectors shall display approved special inspector. identification,as stipulated by the building official,when performing the fimction of special inspector. 3. Review shop drawings and submit design changes.The engineer or architect of record /{ L Special inspection and testing shall meet the minimum requirements of the International Building Code shall acknowledge and review for conformance with the construction drawings those Project Address:tOO L e c' 0003-2021-BRES Section 1704.The following conditions are also applicable: shop drawings that may detail structural information,shall submit to the building official Parrott Number: and to the special-inspection agency written documentation of any verbally authorized ,tCxNOWLEDGMENT'S A.Duties and Responsibilities of the Special Inspector deviations from the approved construction documents,and shall submit revised I have red and m cormdv with the ensdhieos of ibis agereese t documents for building official approval as required. T 1. Signify presence at job site.Special inspectors should notify contractor personnel of - Jam. /r ,T their presence and responsibilities at the job site.If required by the building official,they D.Contractor Responsibilities - V s+t � /�o� V .SS6 shall sign m on the appropriate form posted with the building permit / f „/� 1. Notify the special inspector.The contractor is responsible for notifying the special , a.. On Nam it 7_vl GU'[(70 2. Observe assigned work.The special inspector shall observe assigned work for inspector or agency regarding individual inspections for items listed on the attached Timber Ridge HOA191C 'A.. David Ellis conformance with the building department approved(stamped)design drawings, schedule and as noted on the building department approved plans.Adequate notice shall 12/7/20 pdell[s@q.com specifications,and applicable workmanship provisions of the International Building be provided so the special inspector has time to become familiar with the project. 0weere Sipovmn Primed Name Date Baeoil Code.Architect\engineer-reviewed shop drawings may be used only as an aid to SGM,Inc. �" __- --� John E.Partch,PE 9/18/2020 johnp@sgrn-inc.com inspection. 2. Provide access to approved plans.The contractor is responsible for providing the _-'_ _______._ ._ j �__ special inspector access to approved plans. Desk,I'mfessroaai a Si®usePrlaed Nano Hera F a For continuous special-inspection,the special inspector shall be on site at all times observing the work requiring special inspection.Periodic inspections,if any,must have 3. Retain special inspection records.Upon request,the contractor is also responsible for .TaettLla OaeaEcoetLm moms I5.50aatti 12/17/20 9ia.Biameleimeenaeerction.een prior approval based on a separate written plan reviewed and approved by the building retaining,at the job site,all special inspection records completed by the special inspector. Comroewr Primed Name tide Email department and the engineer or architect of record. E.Inspection of Fabricators _ __ 3. Report nonconforming items.The special inspector shall bring nonconforming items to ADProved F lmorme-e Sienese Pooled Name Date Email the immediate attention of the contractor and note all such items in the daily report.If 1. Fabrication of structural assemblies and members.Where fabrication of structural any item is not resolved in a timely manner or is about to be incorporated in the work,the load-bearing members and assemblies is being performed on the premises of a 'r''x'F - �^�"-"` v f�jo �"JD'MP��"L'L°'� special inspector shall immediately notify the building department by telephone or in fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated Inspected-'a!ytnams• Signature Primed Nerve Date Ernail person,notify the engineer or architect,and post a discrepancy notice. items. CrIYef Wopen Handing _ JH Justin Hahn 4/19/21 justin.hahn@cityofaspen.com 4. Provide timely reports.The special inspector shall complete written inspection reports 2. Fabrication and implementation procedures.The special inspector shall verify that 0.�.vmm1 Simms,. Primed Name Dar Fad for each inspection visit and provide the reports on a timely basis determined by the the fabricator maintains detailed fabrication and quality control procedures that provide a ear As n.,,rr a trap,war®„r.l m amorrw.rem,rue ma building official.The special inspector or inspection agency shall furnish these reports basis for inspection control of the workmanship and the fabricator's ability to conform to 'Fmk.The asr.o.°fBomar or r.rpecaa#obecuor nee Om KW ueW^Peromed ie 4,e shop,fan Approved Wbdra m Mr npeaul directly to the building official,engineer or architect of record,and others as designated. approved construction documents and reference standards.The special inspector shall Kamm.44'"`T mm"r""eFm'a Na 6rl...kr [IBC Sec.1704.1.2]These reports should be organized on a daily format and may be review the procedures for completeness and adequacy relative to code requirements for submitted weekly at the option of the building official.These reports should include: fabricator's scope of work. a.Description of daily inspections and tests made with applicable locations, b.Listing of nonconforming items, F.Approved Fabricator Responsibilities c.Report on how nonconforming items were resolved or unresolved as applicable, 1. Fabrication exempt inspections.Special inspections are not required where work is d.Itemized changes authorized by the architect,engineer,and building official if done on the premise of a fabricator registered and approved to perform such work not included in nonconforming items. without special inspection. RECEIVED 2 - 12/30/2020 ASPEN BUILDING DEPARTMENT