HomeMy WebLinkAboutresolution.council.121-14 RESOLUTION 121
(Series of 2014)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO,
APPROVING CONTRACT AMENDMENT BETWEEN THE CITY OF ASPEN AND R.A.
NELSON, LLC, AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT
AMENDMENT ON BEHALF OF THE CITY OF ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council Change Orders#13, #39, #43,
to the contract between the City of Aspen and R.A. NELSON, LLC, a true and accurate copy of
which is attached hereto as "Exhibit I";
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves the changes to the Contract
between the City of Aspen and R.A. NELSON, LLC, a copy of which is annexed hereto and
incorporated herein, and does hereby authorize the City Manager to execute said agreement on
behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED by the CityQounci'1 of the City of Asp e on
the 22th day of September, 2014.
Steven adron, Mayor
I, Linda Manning, duly appointed and acting City Clerk do certi that the foregoing is a
true and accurate copy of that resolution adopted by the City Council of th City of Aspen,
Colorado, at a meeting held September 22, 2014.
Linda Manning, City Clerk
Page 1 of 1
R LB Rider Levett Bucknall ATTACHMENT A
16 It,Lanmer treet
Suite 470
Denver,Colorado 8C202
T.*720 904 1480
memorandum
To Jack Wheeler City of Aspen
cc Scott Miller, Chris Everson City of Aspen
From Rob Taylor
Date 12 September 2014,
for consent agenda on 22 September 2014
Subject Burlingame Ranch Phase II - City Council Approval of Reference No. 02
Current Change Orders Above $25,000
Jack;
The purpose of this memo is to recommend City Council acceptance of three RA Nelson Change Orders
and to give an update on the overall Change Order status.
This request of City Council is for approval of change orders within the current approved project budget.
This is NOT a request for additional project funding.
Background
For the RA Nelson contract, CoA staff require City Council approval for change orders over$25,000.
Rider Levett Bucknall keeps detailed logs of the project Change Orders which is attached.
There are three live construction contracts at Burlingame:
• Haselden has Access and Infrastructure which commenced in April 2012 for the earthwork and
utility construction and the Vertical project Phase 2ai for Building 1 to 4 which commenced in
April 2013. Buildings 1 to 4 reached substantial completion in early 2014 and are now occupied.
• RA Nelson is constructing Phase 2aii for Buildings 5—7.
Council previously approved three RA Nelson change orders on May 27, 2014. This memo requests
change orders to the RA Nelson contract only.
Current Project Status
The table below reflects the status of RAN Change Orders including those proposed for Council
acceptance in this memo.
Approved GMP Total Change Orders Total Change
Value to date Orders % to date
Vertical Buildings 5-7 $11,279,114 $473,668 4.19%
RA Nelson
www.rlb.com
R L B Rider Levett Bucknall
12 September 2014
Memorandum Page 2
Detail
1 RA Nelson 5-7 Change Order#13 Lattice at Parking $26,397
One of the primary goals of the carport design at the base of Deer Hill was to utilize the back wall as
BOTH a retaining wall, and also as the rear wall of the carport and storage units. The retaining wall was
constructed in A/I and as a result of phasing, the lattice is required to reduce the open area to snow
exposure and reduce the mass of the structure to meet the design intent of images contained in the PUD.
The costs associated with this change are reasonable and we recommend acceptance.
2. RA Nelson 5-7 Change Order#39 Walks and Rails $68,282
The bulk of the cost of this change order is the central sidewalk and handrails that were transferred from
Haselden (where a credit change order for$40,312 has already been processed under this separate
contract)to RA Nelson. The main reason this transfer occurred was to allow better access for RA Nelson
work and prevent damage or abortive work of the central walk and rails. An impact of phasing a small
section of sidewalk and rails at Parking 4/Building 5 was a gap"between projects"which is a small but
necessary cost addition related to the phasing intent. Some relocation of irrigation was also necessary,
also impacted by phasing from the A/I establishment to the vertical building 5-7 project. There is some
possibility some of the handrail costs associated with this change may be able to be removed, but review
on site will be needed with key parties will be required, once the sidewalks are installed.
The costs associated with this change are reasonable and we recommend acceptance.
3. RA Nelson 5-7 Change Order#43 Landscape and Irrigation $29,451
This change is for additional irrigation zones at mid tier rain gardens and the associated work to relocate
boulders to achieve this irrigation routing. Also attributable in some degree to phasing, the cost might
have been avoided if the A/I phase did not occur and the irrigation could have been installed for the"end
state" as the boulder walls were installed. This change also allocates$10,000 to extend the landscape
and irrigation boundary southwards to coordinate with the proposed Parks Department work at"central
park".
The costs associated with this change are reasonable and we recommend acceptance.
See over...
RLB I Rider Levett Bucknall
12 September 2014
Memorandum Page 3
Budget Status
The approved 2014 budget is in good shape. After acceptance of these Change Orders, we still have
$1.08 mil of contingency available which we are managing diligently, with the goal that most will still
remain at the end of the three current active projects/Contracts.
Recommendation
RLB recommend that RA Nelson Change Order numbers#13, #39 and#43 are accepted by Council.
The 2014 project budget and contingency remains in good shape.
Please contact me for any queries relating the attached or above.
Sincerely,
Rob Taylor
Associate Principal
Rider Levett Bucknall Ltd
Encl: B. Overall Project Budget Status
C. RLB-RA Nelson Change Order Log
Refer:
Exhibit I-RAN PCO#13 P5 and P7 Lattice, PCO#39 walks and rails, PCO#43 boulders and
irrigation
Burlingame Ranch Phase IIAii, Buildings 5-7, 34 units ATTACHMENT B
2014 Detailed Budget Estimate (including carry-forward from
rev.Sept 12,2014 rt
SOURCES Budget Actual Variance
2013 Carry-Forward Balance $ 4,411,189 $ 4,411,189 $
2014 City Council Budget Approval $ 15,056,020 $ 15,056,020 $
Grant Funding(CORE Application May 2014) $
Total Sources $ 19,467,209 $ 19,467,209 $
USES
A. Construction-GC/GMP $ 15,256,167 $ 16,172,753 $ 916,586
Access/Infrastructure Remaining(Haselden) $ 470,383 $ 471,245 $ 862
Vertical Buildings 1-4 Remaining(Haselden) $ 3,356,670 $ 3,316,238 $ (40,432)
Vertical Buildings 5-7 including Solar Thermal(RANelson) $ 11,279,114 $ 11,880,064 $ 600,950
2014-2015 Irrigation connectivity-design and construction $ 150,000 $ 150,000 $ -
Deferred Park1/POnd2 Scope to work with Parks L I Li I $ 355,206 $ 355,206
B. Construction-Developer Responsibilities(City of Aspen) $ 129,000 $ 115,437 $ (13,563)'
Offsites Sunk $
Mitigation Sunk $
Offsite Storm Sewer $
Site Gas Supply,Electrical Design,Utility Oversight $
Site Elect Underground $
Site Elect Supply $ -
Site Sanitary Engineer $ 10,000 $ 10,000
Owners OCIP Insurance $ 129,000 $ 105,437 $ (23,563)
C. Soft costs $ 1,836,033 $ 2,099,665 $ 263,632
Desi n
Administrative Services
COA PM $ 200,000 $ 200,000 $ -
Legal $ 20,000 $ 40,000 $ 20,000
Presales $ 10,000 $ 10,000 $ -
Owner's Agent $ 390,880 $ 446,268 $ 55,388
Architect&Consultants $ 408,609 $ 533,673 $ 125,064
CxA Constr Phase $ 138,630 $ 152,290 $ 13,660
Enhanced Civil Oversight $ -
Enhanced Vertical Oversight $ 64,130 $ 74,050 $ 9,920
Professional Services
Materials Testing
Geotech(inc materials testing) $ 44,000 $ 66,000 $ 22,000
Survey $ 40,000 $ 40,000 $ -
Medium voltage electrical oversight $ 5,000 $ 5,000 $
Fees
Sewer Tap Fee $ 191,784 $ 190,512 $ (1,272)
Water Tap Fee-waived
Parks Impact Fee-waived
TDM Impact Fee-when buildings online $ 37,000 $ 36,306 $ (694)
School Impact Fee-when buildings online $ 31,000 $ 31,000 $
Road Impact Fee-n/a only for Pitkin County Permit
Building Permit Fee $ 150,000 $ 149,566 $ (434)
Stormwater Fee-waived
Land Use Fee-done in 2011
Home Sales Fee
HOA Setup $ 20,000 $ 20,000 $
Burlingame Phase I Parking,Design(Const.in 2015 budget) $ 75,000 $ 75,000 $ -
Other
Construction Resources,Natural Gas,Power,Water $ 10,000 $ 30,000 $ 20,000 Ll
D. Contingencies $ 2,246,009 $ 1,079,354 $ (1,166,655)
2014 Contingency $ 2,246,009 $ (1,166,655)
Project contingency expressed as%of construction cost 14.7%
Total Uses(A+B+C+D) $ 19,467,209 $ 19,467,209 $
Page 1 of 1
BURLINGAME RANCH PHASE 11-R,A,NELSON BUILDINGS 5-7 CHANGE ORDER REGISTER
mn S,-1,e1 12,2014 1 RLB'Rider Levett BuckroLt
TIH C.1,„t%, ,
TOINEGMI
CONSl11UR10N CONTINGENCY CHANGE _1
POOR R11 AsIR P.Date NC NCD.te Cumem actbn COExttwed Date pay APp• ISSUE Ail-ACI-iMENT(:
CONTINGENCIES AND ALLOWANCES AVAILABLE WITHIN THE GMP 1111
MN CmMructlon CmG a 209,38100
alowawe-Ile alr esdmin harasw a 10 DID
alowawe-Ste 3
alowawe- all Patch and Rttonfi IOp00.@
aluwawe-fl411D9313 50.000.W
Nlowa e-Weatbel Cmd- 38000.00
alowa e.5ubc¢rtra<t¢Bu $ 100.00000
Nlowatte-qf-Site GL bsuwMe y4�,@
514.38100 (209,38100) (305.00000)
THE LIST OF CHANGE ORDERS BELOW REPRESENTS ALL CHANGES TO THE GMP AND USES OF CONTINGENCIES AND ALLOWANCES
I 3/27/2014 Houd d s/xz/z014 a 1Exbtin Conaitions $ 13,910.10
3 sa 2/2 shN;rroEUUd aaif
4/38/2014 [bsed 5/22/3014 Excess UablBty 11'u-ce and DA/OC 729.55 $ 89,11110.00 $
4 1 14 'l- 5/27/2014 BWIa Ewer<x 1,(14.62 $ 40,000AD M,--
4/1620]4 losrtl 5/222014 Baltlin Bwacer to remowl 183.91 $ 9,849.00
G 5/ifi/2p14 cbsee 27 DE BWNI Soyea exuwtion 46.76 $ M,OW.Op S 13,31440
? 4 38 014 clozetl 5 22 2014 Erosion nuol Marcdals 6333 $ 3,305.00
8 4 14 cb4M 5)22/2@4 AU COINaq resmtatMe nllcwtcN e
9 4/38/2014 cbsetl 5/2212014 Adtled be Makers 58.53 $e 3,134.00
]0 2 @4 4bsed cM1O mE mk<n pl m•il mtl c root cha cwt bken
11 5/16/2014 closed 5131/2014 Buildin]ores excawuon 1842.57 S 6,059.90 $ 45,11].00
12 5X1 li clwed Il 14 fM dfice halb9 Z19J9 $ 31)5840
13 A51011 9/5/2014 RAN Z 9/12/2014 a ute A C 9122 PS antl P7lam¢
14 ASIW3fl 12 Olt [bud X11.::;.1! Down ub<d fi-I cost reed allZ 1)0.01 $ 1@.99
15
614/2014 ozed 6/1712014 Schedule-Ma 1 az baseline
16
4/a/2014 [bsed 2 @4 Gtrealbotlon-finked b PC03
17 630 2014 closed >25 2014 Wl�rter Wx contlisiwi alo - $ 2.500.10
IB MiMI EtSIM14 [bsed )2/014 5 86,M87C4awl ace Frami 44672 $ 5,000.00 $ 14,@8J1
39 6/6/2014 [bsed 6117/2014 -LW-Wall lrri ation line 2].16 S 1!54.46
M M14 clwed IH 1014 Tsuruml NkeEL 33
21 $ 17.01
6(4/2014 cbzetl 6/18/2014 Radon ans&AtOCU nz 139.19 $
zz sM14 lwe soFO wW F
;rmcuud cold 145i.I9
23 suhminal G/9 12014 dosed 72/2014 5 WhOp.lA Il...eU rode 126.43 S
24 43 17 W160024 I.,P).05 ham modlflcatbn 1,15 Lt 0@39
25 REG memo 5/23 6/20/2014 clmetl 7/14/2014 5 HVAC Modifications at T2.1/T1.11ownMmes 34,%3.75
26 mi" 36/1014 clwed 7/14/2D14 5 BS adtl two wiwlmvs 6030 $ 3b @.83
27 6/16/2014 wid wld raid;no used
we
28 v 14 clmed
1/21IM14 s r]e .Flenrl<une Damae Je $ P2,7]0/1014 <bsed )/15/2014 5 O.O2 CMI Work] X04 [bsed 7d A4CassibiF slkws fix-dl 1 and 3 k)/14/2014 bsetl 7 25 M34 5 rode Packe a 11 014 GRAN 22 14 RAN c4r /reissue J Paklmwlws Or alllEll alowewe iB0 33 Ell SG 8182014 RAN 0222014 RN cons34 ASI005 6 Issue RAN 35 851006 7/30/2014 closed 9/26/M10 P6roof care 53Sa 36 ]30 U 8 14 6 P5 aM P7 mt b-k<b 35.)0 $37 A5101p1 )31/2014 <I- 0 28 2014 )rash Em'IOSUCe Motlz 1934) 5 2 14 6 PW NIIin 4 $
39 .1.7 8/19/2014 COA BIN12014 a ttwr/G1 19/22 tltled Sdewalb 110001
40 M34 cbsN '26=4 1 6 Irri Ilan Mainline 4),33 $ 1$p.%
41 851008 0/42014 [bsed 8126/2D14 nntl25cope $ 13.000.00 $ :i,EXDW
42 R 4.14 1 [bud 9/2W2014 6 Tem.Ste Meawrez $ 000.00 $ )�.�
43 65,]1,80 813M14 1 CM S 2014 exttute Cit0922 PS/Ilr 549% 5
44
8/19/2014 CM 992014 IW exttme - p Radon Fan GedR
9/3/2014 1715 $ X7.4%22
45 Sl RAN ¢tM Wmtlew«MaH6rx. ted
K 9 M14 RAM 9 14 FARrM d«rrouu Wx Cmditi-Allovwnce Na $ 4,014- n
47 A51014 942014 CaA 992014 IW PIIs1-landuae 5 1660 88862
K
9/4/M4 CAA 9 M14 IWmecuute Pond 2 Gradl $ 15,54).01 $
49 65,66,72,89 9/5/M14 RAN ¢and
50 B1 9 M34 [W 9M14 1Wexecurc Rai dm Rerisbn 5 13.51 715,03
74 9/5/2014 RAN ot eSonr $ 2,0 .14 51 n
S2 107 9AM14 RAN 9/8/M14 RAN W.,BS mob Eee O-o Mat-lueas res4slon,reduce area $ 109.13 $ gq
s3 endin ix RAN coon mtlaI PCQ Column at 54 C<?0.0M rpD 1p s 40cV(a
51 main iss RAN etlan -ill PCQ 511s 52 W-SH iwWI.RFI albwame ROM $ l0,-.
)19,172.16 47.429.50 $ 198.0)430 $ 373.66841
NET TOTAL (161,951.50) $ 1306,925.80) $ 473,668.46
ORIGINALGMPAMOUNT
.6
719
TOTAL OF ALL CHANGE ORDERS(ANTICIPATED PLUS UNANTICIPATED) $ ]19,3]17 2.316 R!7$I
CHANGE ORDERS PAID POR WITHIN THE GMP(ANTICIPATED USE CF FUNDS AVANABLE IN THE GMP) $ 2K,503.7p
CHANGE ORDERS WHICH CHANGE THE GMP(UNANTICIPATED USE OF OWNER'S CONTINGENCY) $ 473,66fl.K aaplk
CURRENT REWSEO GMP AMOUNT $ 11T7M42.K
ALLOWANCES AND CONTINGENCIES REMAINING WITHIN THE GMP $ (268,87).30) 2.39%
n R.A.N E L S O N PROPOSED CHANGE ORD EXHIBIT
BUILDING MOUNTAIN RESORT COMMUNITIES Burlingame Ranch Phase 11
Project No.:17-14-00 Page: 1 of 2
Proposed Change Order No. 00013
DESCRIPTION: ASI-11, RFI#86 P5,P7 lattice rev2 DATE: 5/22/2014
TO: CONTRACT NO: 1
City of Aspen
130 South Galena Street
Aspen, CO 81611
PH: 970.920.5085
DESCRIPTION OF PROPOSAL
ASIA 1, RFI#86 Parking P5, P7 Lattice Screens Revision 2-All wood framing by Patriacca. Patriacca Proposal#5-Rev
2 dated 9.3.14
As part of this proposal, a time extension of 0 day(s)is requested.
Item Description Quantity Units Unit Price Net Amount
00001 Patriacca Labor ASI-11 P5,P7 lattice revision 2 1.000 $11,587.50 $11,587.50
00002 Prima-Painting ASI-11 P5,P7 lattice revision 1.000 $3,865.29 $3,665.29
2,no caulking included
00003 Project Manager 7.000 hrs $80.00 $560.00
00004 Patriacca Materials ASIA 1,RFI-86 P5,P7 1.000 $8,426.00 $8,426.00
lattice revised.Proposal#5-Rev 2 dated 9.3.14
Description Markup% Markup Amount
Bond 0.850% $207.73
Subtotal $24,646.52
Contingency 2.000% $492.93
Subtotal $25,139.45
Construction Fee 5.000% $1,256.97
Subtotal $26.396.42_
Total Cost: $26,396.42
APPROVAL:
By: By: By:
City of Aspen Oz Architecture Bruce Gentry
Date: Date: Date:
DISTRIBUTION OF CHANGE:
Cost Code Description Cost Code Distributed Value
Project Manager 1-3150 $560.00
Subtotal of Cost Code $560.00
Bond 17-1120 $207.73 j
Subtotal of Cost Code $207.73
Construction Contingency 18-1100 $492.93
Subtotal of Cost Code $492.93
R.A.Nelson LLC
Rev.Date:06106107 51 Eagle Road#21 P.O Drawer 5400/Avon,Colorado 1 81 620 1970.949.5152 1 Fax 970.949.4379 Fong:rpco_02m
' R.A.N E L S O N PROPOSED CHANGE ORDER
WILDING MOUNTAIN RESORT COMMUNITIES Burlingame Ranch Phase IIAII Date: 09/05/2014
Project No.:17-14-00 Page: 2 of 2
Proposed Change Order No. 00013
DISTRIBUTION OF CHANGE:
Cost Code Description Cost Code Distributed Value
Construction Fee 5% 19-2100 $1,256.97
Subtotal of Cost Code $1,256.97
Framing Materials 6-1100 $8,426.00
Subtotal of Cost Code $8,426.00
Framing Labor 6-2100 $11,587.50
Subtotal of Cost Code $11,587.50
Painting 9-9100 $3,865.29
Subtotal of Cost Code $3,865.29
Total Distributed Value: $26,396.42
i
R.A.Nelson LLC
Rev.Date:0610M7 51 Eagle Road#2!P.O Drawer 5400/Avon,Colorado/81 620 1 970.949,5152 I Fax 970.949.4379 Form:f poc_02m
M N
R.A.N E L � t� PROPOSED CHANGE ORDER
I`
BUILDING MOUNTAIN AESOAI COMMUNITIES Burlingame Ranch Phase IIAil Date: 08128/2014
Project No.:17-14-00 Page: 1 of 2
Proposed Change Order No. 00039
DESCRIPTION: ASI-7, RFI 85, Irrigation mainline DATE: 8/1/2014
TO: CONTRACT NO: 1
City of Aspen
130 South Galena Street
Aspen, CO 81611
PH:970.920.5085
DESCRIPTION OF PROPOSAL
ASI-7 Additional sidewalk with delete of 175 L.F. railing and thickened concrete edge. Relocation of irrigation mainline
under sidewalk Building BD,.Relocate vaives in Rain Garden 14A per RFI 85.
As part of this proposal,a time extension of 0 day(s)is requested.
Item Description Quantity Units Unit.Price Net Amount
00001 S2M ASI-7 Additional sidewalk with delete 1.000 $14,850.41 $14.850.41
thickened edge per RT
00002 Heyl ASI-7 Additional sidewalk with deduct 1.000 $14.241.10 $14,241.10
thickened edge,baclrfill irrigation mainline at
Building 6,cut thickened edge at Building 6
sidewalk in lieu of top of concrete edge per
plans.
00003 Gore ASI-7 Additional sidewalk 1 000 $1.050.00 $1,050.00
00004 Project Manager 8.000 Hr $80.00 $640.00
00005 Project Superintendent 6.000 Hr $105.00 $630.00
00006 1.000 $21.847.00 $21,847.00
Timberwolf ASI-7 Additional sidewalk with
delete 175 L.F rail Q$230.001L.F.per RT
00007 Twisted Tree-Estimate#3228 RFI#85 move 1.000 $7,245.00 $7,245.00
mainline irrigation at Rain Garden 14A,Estimate
#5016 Relocate Irrigation mainline under
Building 6 sidewalk,Estimate#3243 Add 180
L.F.of split rail fence in lieu of metal railing per
RT
00008 GH Daniels-Repair relocated irrigation mainline 1.000 $2,714.21 $2,714.21
at Building 6D.Relocate irrigation vatves at Rain
Garden 14A per RFi 85
Description Markup% Markup Amount
Bond 0.850% $537.35
Subtotal $63,755.07
Contingency 2.000% $1,275.10
Subtotal $65,030.17
Construction Fee 5.000% $3,251.51 i
Subtotal $68,281.68
Totai Cost: .$.68,281.6$
R.A.Nelson LLC
Rev.Date:06MM7 51 Eagle Road#21 RO Drawer 54001Avon,Colorado 181620 1970,949-5152 1 Fax 970.949.4379 Palm:t pta 02M
t
I
1
r*OA) R.A.N E L 5 O N PROPOSED CHANGE ORDER
BUILDING MQUNTAIP!RESORT COMMUNITIES Burlingame Ranch Phase IIAII Date: 08/28/2014
Project No,:17-14.00 Page: 2 of 2
Proposed Change Order No. 00039
APPROV Paul L D1911e11y,fgn byP-IL4hul
-US WaW LSchuMy o-OL oLL
ar W F pu h u Itp7aaentco m,
By: ` By: Schultz �5
La:301D291368.16 BY:
City of Aspen Oz Architecture B ce a try
Date; �,yT-! Date: Date: Q
DISTRIBUTION'QF:Q4,ANQEr
Coat'soda ipeacttption cost Code Distributed Value
Project Manager 1-3150 $640.00
Subtotal of Cost Code $640,00
Project Supervision 1-3200 $630.00
Subtotal of Cost Code $630.00
Bond 17-1120 $537.35
Subtotal of Cost Code $537.35
Construction Contingency 18-1100 $1,275.10
Subtotal of Cost Code $1,27$.10
Construction Fee 5% 19-2100 $3,251,51
Subtotal of Cost Code $3.251.51
Construction Surveying 2-2200 $1,050.00
Subtotal of Cost Code $1,050,00
Excavation,backfill,grading 2-3100 514.241.10
Subtotal of Cost Code $14.241.10
Landscaping 2-9100 $2,714.21
i_aindscaping 2-9100 $7,245.00
Subtotal of Cost Code 59,959.21
Concrete footings,wells and slabs 3-1100 $14,860.41
Subtotal of Cost Code $14:850.41
Structural Steel 5-11tH) $21,847.00
Subtotal of Cost Code $21,847.00
Total Distributed Value: $618,281.68
R.A.Nelson LLC
Row.Dam;Wosra7 51 Eagle Road#21 P.0 Drawer 5400/Avon,Colorado 18162019M949-5152 1 Fax 970.949,4379 Form:1_pco 02m
c
1
I
r R.A.N E L S O N PROPOSED CHANGE ORDER
1/\ BUILDING MOUNTAIN RESORT COMMUNITIES Burl In ame Ranch Phase I Date: 08
9 IIAI r2812014
Project No.:17-14-00 Page: 1 of 2
Proposed Change Ordier_No. 00_0_43
DESCRIPTION: RFi#65,72,80,89 Add'l Irrigation DATE: 8/1312014
I TO: CONTRACT NO: 1
City of Aspen
130 South Galena Street
Aspen, CO 81611
PH:970.920.5085
DESCRIRTIt N:QF.PROPQSAL
RFI#65,72,80.Additional irrigation Twisted Tree P5,P7 excluding bubblers. Added spray zones and sleeving under
existing boulder walls.Allowance established for future landscaping south of P7.
As part of this proposal, a time extension of 0 day(s)is requested.
Item Description Quantity Units Unit Price Net-Amount
00001 Twisted Tree Estimate#3198 Planter 1,000 $1,991.78 $1.891.78
00003 Twisted Tree Estimate#3206 Terrace Irrigation 1.000 $6,545.61 $6,545.61
00004 Twisted Tree Estimate#3239 Boulder Wall 1.000 $3,522.00 $3,522.00
lower sleeving
00005 Twisted Tree Estimate#3240 8culder wall 1.000 $4,567,00 $4,567.00
upper sleeving
00006 Project Manager 8.000 Hr $80,00 $640.00
00007 Landscaping Allowance P7 south 1 000 $10,000.00 $10,000.00
Description Markup% Markup Amount
Bond 0.850% $231.76
Subtotal $27,498.15
Contingency 2.000% $549.96
Subtotal $28,048.11
Construction Fee 5.000% $1,402.41
Subtotal $296450.$2
Total Cost: $28450:52
APPROV Paul L wiwlydgis�aa uu
/ emalkpacM1�namsrch<om,
By: C?� By: Schultz 0ac701I�391}/916-0bW By:
City of Aspen Oz Architecture Bruce Gentry
Date: / Z / �f Date: Date: Z$
DISTRIIOUT119WOF CHANGE:
Cost Code Desdi.11 ticn Cost Code Distributed Value
Project Manager 1-3150 $640.00
Subtotal of Cost Code $840.00
Bond 17-1120 5231.76
Subtotal of Cost Code 3231.76
R.A.Nelson LLC
new.Oslo:0610M7 51 Eagle Road#2/P.O Drawer 5400/Avon,Colorado/81620 1 970,949.51521 Fax 970.949.4379 Fame I-co pain
rA00) R,p_N E I S O N PROPOSED CHANGE ORDER
L SURDING MOUNTAIN RESORT COMMUNITIES Burlingame Ranch Phase Ildll Date:
0812812014
Project No.:17-1400 Page: 2 of 2
Proposed Change Order No. 00043
D!$TRIBUTION of CHAffG*E:
Cost Codo Desodption Cost Code Dlstrlbuted Value
Construction Contingency 18-1100 5549.96
Subtotal of Cost Code $549.96
Construction Fee 5% 19-2100 $1,402.41
Subtotal of Cost Code $1.402.41
Landscaping 2-9100 $1.991:78
Landscaping 2-9100 $4,567.00
Landscaping 2-9100 $6.545.81
Landscaping 2-9100 $3;522.00
Subtotal of Cost Code $16,626.39
Landscaping Allowance P7 south 2-9110 $10.000.00
Subtotal of Cost Code $10'omoO
Total Distributed Value: $29,450.52
i
R.A.Nelson LLC
Rev.Dale:06WO? 61 Eagle Road#21 p0 Drawer 5400/Avon,Colorado 181620/970.949.5152/Fax 970.949.4379