HomeMy WebLinkAboutresolution.council.080-23RESOLUTION #080 (Series of 2023) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CHANGE ORDER BETWEEN THE CITY OF ASPEN AND GOULD CONSTRUCTION. AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a change order to the original contract for Construction Manager/General Contractor for Maroon Creek Multi -Use Trail between the City of Aspen and Gould Construction, a true and accurate copy of which is attached hereto as Exhibit "A"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves a change order to the original contract for Construction Manager/General Contractor for Maroon Creek Multi -Use Trail, between the City of Aspen and Gould Construction, a copy of which is annexed hereto and incorporated herein and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 23rd day of May 2023. 7/XW'_ Torre, Mayor I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, May 23rd, 2023. Nicole Henning, City Clerk DocuSign Envelope ID: B61CC34E-58FA-4E2A-9BDB-DD2AFD7E8450 { CITY OPASPEN General Information Change Order Form Revision 12/08/2021 Change Order Form Vendor _ Gould Change Order Number 1 Date of Issuance May 111h, 2023, Project Name Maroon Creek Road Trail Project Number 292ZMx 2022-324 RESO 2022-036 u�- Project Completion Date _ Fall 2024 Project Manager John Spiess COA Account Code 100.572.81200.57210.50964 Project Information Description Of Service Potholing of utilities within Maroon Creek Rd. Corridor at critical proposed trail locations. Utility potholing is used to locate known utilities below surface level by excavating holes. Workers start with a simple pothole of around 8 to 12 Inches in diameter and use a vacuum excavator to dig straight down until the utility Is found. This service will fill critical gaps in utility location Information. This work is under the direction of Gould construction and Involves subcontracting of traffic control and hydrovac operations. Description Of Change Order The project team for the Maroon Creek Trail proposes that the potholing occur during the design phase of the project so that critical Information can be incorporated prior to the issuance of final drawings. This is advantageous to the project because It avolds potential delays In construction and more costly field adjustments that may occur when potholing Is completed during construction. This activity was not initially Included in the existing Gould contract because the potential utility Impacts were not fully understood prior to that contract. Potholing work by Its nature Is difficult to predict based on the unknown challenges or surprises that the crews will face below the surface. This change order Is In the form of a not to exceed contract totaling $139,125.00. This figure is generated based on 1 of 2 DocuSign Envelope ID: B61CC34E-58FA-4E2A-9BDB-DD2AFD7E8450 Contract Information Original Contract Amount Previous Change Orders) Change Order Amount (If Over 50k Change Order To Be Presented To Council For Approval) Final Contract Amount (Including All Change Orders) Revised Completion Date Signature 1. Contractor (Required) 2. Project Manager (Required) 3. Department Head (Required) 4. Procurement Officer (Required) S. City Attorney (Required Based On Value Of Thresholds) 6. City Manager (Required Based On Value Of Thresholds) Change Order Form Revision 12/08/2021 the daily rate of $13,912.50. Estimates for the total number of days to completion have varied from 3-10 days. $ 69,025.00 root to exceea,i 139,125.00. Work will be billed on a Time and Materials basis. $ 208,150.00 - Fall 2023- Completion of phase CM/GC contract _ Wltl 7�i3M1�Ik0f?7�W'W' A4d V 5/12/2023 1 2:20:46 PM MDT —DoauSign* d Cy: ,�wt,S 9. thol EOocuS%,�.nzn�d by'.1aEe1sazg... Original contract, if applicable all other change orders, and vendor quote for requested change order must be attached to this document. For additional Information: See Procurement Policy "Change Orders And Add Services Request" (page 30). Page 2 of 2