HomeMy WebLinkAboutresolution.hpc.037-2014 RECEPTION#: 616145, 12/1912014 at
10:21:52 AM,
1 OF 9, R $51.00 Doc Code RESOLUTION
Janice K. Vos Caudill, Pitkin County, CO
RESOLUTION NO. 37
(SERIES OF 2014)
A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION
RECOMMENDING CITY COUNCIL GRANT PLANNED DEVELOPMENT —
PROJECT REVIEW APPROVAL, SUBDIVISION APPROVAL, MAJOR
DEVELOPMENT CONCEPTUAL APPROVAL, DEMOLITION, GROWTH
MANAGEMENT APPROVAL, AND CONCEPTUAL COMMERCIAL DESIGN
APPROVAL FOR A SITE SPECIFIC DEVELOPMENT PLAN FOR THE HOTEL
JEROME PLANNED DEVELOPMENT LOCATED ON PROPERTIES COMMONLY
KNOWN AS 310 & 330 E MAIN STREET (LEGALLY DESCRIBED IN EXHIBIT I TO
THIS RESOLUTION),CITY OF ASPEN, PITKIN COUNTY, COLORADO.
ParcellDs: 2737-073-21-001 & 2737-073-21-003
WHEREAS, the Community Development Department received an application for the
Hotel Jerome PD (the Application) from Jerome Properties, LLC and 310 East Main St.
Ventures, LLC (Applicants), represented by Vann Associates for the following land use review
approvals:
• Planned Development— Project Review, pursuant to Land Use Code Chapter 26.445.
• Subdivision Review—pursuant to Land Use Code Chapter 26.480.
• Growth Management Review— Lodge Development, pursuant to Land Use Code Chapter
26.470.
• Commercial Design Review - Conceptual, pursuant to Land Use Code Section 26.412.
• Major Development - Conceptual for properties listed on the Inventory of Historic
Landmark Sites and Structures, pursuant to Land Use Code Section 26.415.
• Demolition of properties listed on the Inventory of Historic Landmark Sites and
Structures, pursuant to Section 26.415; and,
WHEREAS, all code citation references are to the City of Aspen Land Use Code in
effect on the day of initial application—September 8, 2014, as applicable to this Project; and,
WHEREAS, the Community Development Department received referral comments from
the Aspen Consolidated Sanitation District, City Engineering, Building Department, Fire
Protection District, Environmental Health Department, Parks Department, Aspen/Pitkin County
Housing Authority, Public Works Department, and the Transportation Department as a result of
the Development*Review Committee meeting; and,
WHEREAS, said referral agencies and the Aspen Community Development Department
reviewed the proposed Application and recommended conditions; and,
WHEREAS, pursuant to Chapter 26.304.060 of the Land Use Code, the Community
Development Director may combine reviews where more than one (1) development approval is
being sought simultaneously; and,
WHEREAS, all required public noticing was provided as evidenced by an affidavit of
public noticing submitted to the record, a summary of public outreach was provided by the
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page I of 9
applicant to meet the requirements of Land Use Code Section 26.304.035, and the public was
provided a thorough and full review of the proposed development; and,
WHEREAS, the Historic Preservation Commission reviewed the Application at a duly
noticed public hearing on December 10, 2014, during which the recommendations of the
Community Development Director and comments from the public were heard by the Historic
Preservation Commission, and recommended approval with conditions by a vote of four to zero
(4 -0).
NOW, THEREFORE BE IT RESOLVED BY THE HISTORIC PRESERVATION
COMMISSION OF THE CITY OF ASPEN, COLORADO THAT:
Section 1:Atwovals
Pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal Code, the
Historic Preservation Commission hereby recommends City Council grant the Hotel Jerome
Planned Development — Project Review, Subdivision, Growth Management, Conceptual Major
Development, Conceptual Commercial Design, and Demolition approvals, subject to the
recommended conditions of approval as listed herein. The recommended dimensions are
attached as Exhibit II.
Existing and proposed floor area and net livable calculations shall be verified with the Zoning
Officer prior to Planned Development— Project Review by City Council.
The Applicant shall complete the following, prior to City Council review:
1. Further study the proposed fourth floor setback on the north side.
2. Further study the relationship of the new lodge structure to the restored former Aspen
Times building.
3. Consider restoring and incorporating the historic signage from the Aspen Times into the
new design.
Section 2: Subsequent Reviews
Pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal Code, the
Applicant is required to obtain Final Commercial Design Review, Major Development Review—
Final for properties located within the Historic District, and Planned Development — Detail
Review following approval of the reviews outlined herein. The applicant shall combine these
applications, and they shall be made no later than one (1) year following City Council approval
of the reviews outlined herein. Failure to file such an application within this time period shall
render Planned Development—Project Review, Conceptual Commercial Design, and Conceptual
Major Development approvals null and void. This deadline may be extended by the Community
Development Director, pursuant to Section 26.445.090.0 of the Land Use Code.
Section 3: Growth Management Allotments
The Historic Preservation Commission hereby recommends the Hotel Jerome be granted growth
management allotments for 15 lodging bedrooms = 30 lodging pillows from the 2014 growth
management year.
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 2 of 9
Section 4: Affordable Housing
The existing development for the Hotel Jerome generates a credit of 147.13 FTEs. The proposed
final development generates a total of 135.51 FTEs, creating a net decrease of 11.61 FTEs. The
proposed development for the Hotel Jerome is not required to provide any affordable housing
mitigation. Any reconstruction credit shall be valid for one (1) year following issuance of a
demolition permit, pursuant to Chapter 26.470.130.
Section 5: Planned Development— Detail Review
In addition to the general documents required as part of a Planned Development— Detail Review,
the following items shall be required as part of the Application's Planned Development — Detail
Review:
a. An Outdoor Lighting Plan, pursuant to section 26.575.150.
b. An existing and proposed Landscaping Plan, identifying trees with diameters and values.
c. A draft Construction Management Plan.
d. A completed Transportation Impact Analysis.
e. A plan for a delivery area for the restored historic resource that meets the Commercial
Design Standards.
Section 6: Subdivision/PD Plat and Agreement
The Applicants shall submit a Subdivision/PD agreement (hereinafter "Agreement") that meets
the requirements of the Land Use Code within 180 days of final approval. The 180 days shall
commence upon the granting of Final Commercial Design, Final Major Development and Planned
Development — Detail Review approvals by the Historic Preservation Commission. The
recordation documents shall be submitted in accordance with the requirements of Section 26.490
Approval Documents of the Land Use Code.
a. In accordance in Section 26.490.040, Approval Documents Content and Form, the
following plans are required in the Approved Plan Set:
1. Final Commercial and Historic Design Review/ Architectural Character
Plan.
2. Planned Development Project and Detail Review Plans.
3. Public Infrastructure Plan.
4. Final Transportation Impact Analysis (TIA).
b. In accordance with Section 26.490.050, Development Agreements, a Development
Agreement shall be entered into with the City.
c. In accordance with Section 26.490.060, Financial and Site Protection Requirements, the
applicant shall provide a site protection guarantee and a site enhancement guarantee.
d. In accordance with Section 26.490.070, Performance Guarantees, the following
guarantees are required in an amount equal to 150% of the current estimated cost of the
improvement:
1. Landscape Guarantee.
2. Public Facilities and Public Infrastructure Guarantee.
3. Storm Water and Drainage Improvements Guarantee.
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 3 of 9
Section 7: Engineering Department
The Applicant's design shall be compliant with all sections of the City of Aspen Municipal
Code, Title 21 and all construction and excavation standards published by the Engineering
Department.
Drainage:
• The project shall meet the Engineering Design Standards (the "EDS") and the Urban
Runoff Management Plan (the "URMP"). A full major drainage report and plan that
meets URMP and EDS must be submitted at building permit that provides for the WQCV
and for conveyance of the 100-yr event from the site to the City of Aspen Stormsewer
system.
Snow Storage:
• A minimum functional area equaling 30% of the paved area shall be provided contiguous
to the paved and designed to accommodate snow storage. For heated areas, the
functional area can be reduced to 10%.
Sidewalk and Curb and Gutter:
• All sidewalk, curb and gutter must meet the Engineering Standards as outlined in Title 21
and the Engineering Design Standards adopted by Title 29. The applicant shall work
with Engineering to provide a sidewalk improvement plan, prior to City Council review.
Construction Management
• The plan must include a planned sequence of construction that minimizes construction
impacts. The plan shall describe mitigation for parking, staging/encroachments, and truck
traffic.
Section 8: Fire Mitigation
All codes adopted by the Aspen Fire Protection District shall be met, subject to review and
approval by the Fire Marshall.
Section 9: Parks Department
Tree removal permits are required prior to issuance of a building permit for any demolition or
significant site work. Mitigation for removals must be met by paying cash in lieu, planting on
site, or a combination of both, pursuant to Chapter 13.20 of the City Municipal Code.
Section 10: Aspen Consolidated Sanitation District Requirements
Service is contingent upon compliance with the District's rules, regulations, and specifications,
which are on file at the District office.
ACSD will review the approved Drainage plans to assure that clear water connections (roof,
foundation, perimeter, patio drains) are not connected to the sanitary sewer system.
On-site utility plans require approval by ACSD.
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 4 of 9
Oil and Grease interceptors (NOT traps) are required for all food processing establishments.
Locations of food processing shall be identified prior to building permit.
Oil and Sand separators are required for parking garages and vehicle maintenance
establishments.
• Driveway entrance drains must drain to drywells.
• Elevator shafts drains must flow thru o/s interceptor
Old service line connections must be excavated and abandoned at the main sanitary sewer line
according to specific ACSD requirements.
Below grade development may require installation of a pumping system.
One tap is allowed for each building. Shared service line agreements will be required where
more than one unit is served by a single service line.
Subject to the provisions of the final plat, permanent improvements are prohibited in sewer
easements or right of ways. Landscaping plans will require approval by ACSD where soft and
hard landscaping may impact public ROW or easements to be dedicated to the district.
All ACSD fees must be paid prior to the issuance of a building permit.
Where additional development would produce flows that would exceed the planned reserve
capacity of the existing system (collection system and or treatment system) an additional
proportionate fee will be assessed to eliminate the downstream collection system or treatment
capacity constraint. Additional proportionate fees would be collected over time from all
development in the area of concern in order to fund the improvements needed.
Where additional development would produce flows that would overwhelm the planned capacity
of the existing collection system and or treatment facility, the development will be assessed fees
to cover the costs of replacing the entire portion of the system that would be overwhelmed. The
District would fund the costs of constructing reserve capacity in the area of concern (only for the
material cost difference for larger line).
The glycol heating and snow melt system must be designed to prohibit and discharge of glycol to
any portion of the public and private sanitary sewer system. The glycol storage areas must have
approved containment facilities.
The applicant's engineer must furnish average and peak flows as well as service size for both
buildings prior to final design.
The applicant will need to provide plans showing that the pool drain sizes conform to district
regulations.
Soil Nails are not allowed in the public ROW above ASCD main sewer lines and within 3 feet
vertically below an ACSD main sewer line.
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 5 of 9
The district will be able to respond with more specific comments and requirements once detailed
building and utility plans are available.
Section 11: Environmental Health Department
The Applicants shall obtain Special Review approval from the Environmental Health
Department in accordance with Municipal Code Chapter 12.10 in order to eliminate the
trash/recycle area required for the new construction, prior to issuance of building permit.
Section 12: Transportation Department
The Applicants shall update the Transportation Impact Analysis report for approval by the
Transportation Department and Engineering Department prior to City Council review. Staff
requests that the applicant consider new/enhanced TDM measures for this project.
Section 13: Water/Utilities Department
The Applicants shall comply with the City of Aspen Water System Standards, with Title 25, and
with the applicable standards of Title 8 (Water Conservation and Plumbing Advisory Code) of
the Aspen Municipal Code, as required by the City of Aspen Water Department. All Water
System Distribution standards in place at the time of building permit shall apply, and all tap fees
will be assess per applicable codes and standards. Utility placement and design shall meet
adopted City of Aspen standards.
Section 14: Outdoor Lighting and Signage
All outdoor lighting and all signage shall meet the requirements of the Aspen Municipal Code.
Section 15: Building Department
All applicable building and accessibility codes in place at the time of building permit shall be
met.
Section 16:
All material representations and commitments made by the Applicant pursuant to the
development proposal approvals as herein awarded, whether in public hearing or documentation
presented before the Community Development Department, the Historic Preservation
Commission, or the Aspen City Council are hereby incorporated in such plan development
approvals and the same shall be complied with as if fully set forth herein, unless amended by
other specific conditions or an authorized authority.
Section 17:
This Resolution shall not affect any existing litigation and shall not operate as an abatement of
any action or proceeding now pending under or by virtue of the ordinances repealed or amended
as herein provided, and the same shall be conducted and concluded under such prior ordinances.
Section 18:
If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason
held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 6 of 9
deemed a separate, distinct and independent provision and shall not affect the validity of the
remaining portions thereof.
FINALLY, adopted, passed and approved this 10`h day of December, 2014.
Ap roved as to form: Ap d as o conte
DcWorah Quinn,Assistant City Attorney Willis Pember,Acting Chair
Attest*
Kathy Strickl• d, Deputy City Clerk
Attachments:
Exhibit L• Legal Descriptions
Exhibit II. Recommended Dimensional Requirements
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 7 of 9
Exhibit 1
310 E. Main Street— All of Lot M, the west ten (10) feet of Lot N, and the east one-half of Lot L,
the said east one-half of Lot L being more particularly described as follows: that portion of Lot L
lying easterly of a line drawn parallel with the side lines of Lot L and equidistant therefrom and
extending to the end lines of said lot; all of said property being in Block 79, City and Townsite of
Aspen.
330 E. Main Street — A parcel of land situated in the City and Townsite of Aspen, Colorado,
being all of Lots A, B, C, D, E, F, G, H, 1, O, P, Q, R, S, and the East 20.00 feet of Lot N, all in
Block 79, together with the East 170.00 feet of the Alley in said Block 79, Vacated by Ordinance
No. 1 (Series of 1951) of the City of Aspen, Colorado, according to the Hotel Jerome Lot Line
Adjustment and Subdivision Exemption plat filed June 12, 1991 at Reception No. 331521, in
Plat Book 26 at Page 52.
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 8 of 9
Exhibit II — Recommended Dimensional Requirements
,.' ��
kr�, t5 ! 6 v: Dlmen811oLn9 �+i k' � ja ' i��k� if a,i }'. Propose
Dov XM.,
rr
Minimum tr,4': rr 54,355 sf
,E .
fl �l Aspen Times— 16' (21.5' false front)
'Maximum height' 'r a �" New lodge structure— 31.5'
�s u ,
t; Jerome— 54.5
X41 Aspen Times— 11.5' first floor
Minimum floor to"floor heights." a $ New lodge structure— 8.5' first floor
" Jerome— 8.5' on 4`s floor addition
, f ,z� 1,945 & 1,970 sf for 2 3-bedroom lock-off units
Maximum unit size
All other units— underlying Zoning
Cumulatrve�FAR —' ' r„ ' 2.73:1 or 134,580 sf
Coinmercial FARC "�'§
0.38:1 or 18,829 sf
Lodge FAR t s ;` yY. w t,h' 2.35:1 or 115,751 sf
J
Averag $a lod a umtsize ,�� *} �� �� 619 sf
Commercial":net leasable s5IW15,508 sf
.cra. -.. Ar,t:':�.;`#•
LodJge net livable , x $ , f ? 66,282 sf
Lodge umts/keys/bedrooms L 103/107/109
++
PubhcAmenity r 9,980sf(20.2%)
.P.�:-..x..x a.fin. . .�•r .+ ::t
Minimum off street Parking spaces.. ; ` 47
Hotel Jerome
330 E. Main Street
Resolution No.37, Series 2014
Page 9 of 9