HomeMy WebLinkAbout#landuse case.HP.100 E Bleeker St.0008.2006.AHPCPROJECT DIRECTORY:
CLIENT:
NANCY SPEARS
POB 2630
ASPEN, COLORADO 81611
T: g -7O-4148-38-75
ARCHITE_C T.-
CON50RTIUM ARCHITECTS
P.O.B. 1786
BASALT, COLORADO 81621
T: 4f -7O -g2 7-224141
F: 4110-0121-2266
CONTACT: RALLY DUPPS
LAND USE PLANNER:
HAAS LAND PLANNING
201 N. MILL ST. SUITE 105
ASPEN, COLORADO 51611
T: g -7O -412✓ --'78141
F: g -7o-0125--73415
CONTACT: MITCH HAAS
GENERAL CONTRACTOR:
CIVIL ENGINEER:
H16H COUNTRY ENGINEERING
1511 BLAKE AVE -SUITE 101
GLENWOOD SPRIN65, COLORADO 51601
T: 41"10-4145-8676
CONTACT: MATT LANGHORST
SOILS ENGINEER:
HEPWORTH PAWLAK GEOTECHNICAL
5020 COUNTY ROAD 154
6LENW00D SPRINGS, COLORADO 81601
T: 41-70-4145-lgaa
CONTACT: STEVE PAWLAK
MECHANICAL ENGINEER:
MARK 5UR66RAAF AND ASSOC,.
203 GAPE PL. P05 5-110
PA605A SPRGS, GO 8114-7
T: 41-70--731-4278
CONTACT: MARK BURGGRAAF
STRUCTURAL ENGINEER:
SPEARS RESIDENCE REMODEL
100 EAST
SLEEKER
STREET, ASPEN,
COLORADO
81611
LOT K.,
BLOCK
65 PARCEL ID
# 2735-1243-7005
PROFIT PER QUALITY LEVEL AS ILLUSTRATED IN PART I OF
consortium
architects
P.O. B. 786, basalt, Colorado 81621
voice: 970-927-2299 fax: 970-927-2266
LIST OF ARCHITECTURAL DRAWINGS:
COVER
AI.O SITE 4 LANDSCAPE PLAN
AI.I EXISTIN6 SITE PLAN
AIS DOOR & WINDOW SCHEDULES
A2.1 FLOOR PLAN5
A2.2 FLOOR $ ROOF PLANS
A3.1 - A3.4 EXISTING 4 PROP05ED
BUILDING ELEVATIONS
A4.1 - A4.2 BUILDING SECTIONS
A6.1 BUILDIN6 DETAILS
A41.0 F.A.R. CALCULATIONS
A41.1 EXISTIN6 PLANS
S&M
IIS WE5T 6TH ST. DI.O
6LENWOOD SPRIN6S, COLORADO SI60I
T: 41-70-4145-1004
CONTACT: CLAY 6OLDBERG
SITE IMPROVEMENT SURVEYOR:
RIVER GIT'( SURVEYS
POB 213
6LF-NY400D SPGS, CO 51601
T: cro-4145-60141
CONTACT: DAVE COOPER
DEMOLITION PLANS
FINAL
PRESERVATION / DEMOLITION PLAN:
HPC 07-26-2006
I. ALL H15TOR-IC WINDOW5, GLAZING 3 TRIM ARE TO BE
PRESERVED
2. ALL HISTORIC EXTERIOR AND INTERIOR DOORS
ARE TO BE PRESERVED
3. ALL EXISTIN6 STRUCTURAL FRAMING MEMBERS
ARE TO BE PRESERVED
4. ALL EXISTING FLOORING IS TO BE SALVAGED
5. ALL DAMAGED EXTERIOR HISTORIC, 5UILDIN6
MATERIALS ARE TO BE PRESERVED AND RESTORED
PER SECRETARY OF THE INTERIOR'S 5TANDARD5 FOR
REHABILITATION OF HISTORIC STRUCTURES AND
PER HPG GUIDELINES.
THIS 15 TO BE COORDINATED WITH CITY STAFF /
HPG MONITOR $ GENERAL CONTRACTOR
6. ALL HISTORIC ELEMENT5 THAT ARE UNCOVERED
DURING CONSTRUCTION WILL BE COORDINATED W/
CITY STAFF / HPG MONITOR d GENERAL CONTRACTOR
'1. PLEASE REFER TO DEMOLITION DRAWINGS FOR
DEMOLITION PLAN. PLEASE REFER TO SHEETS A41.2 4
Ag.3 FOR EXISTING PLANS AND ELEVATIONS.
a. ALL HISTORIC FRAMING 15 TO REMAIN UNLESS
NOTED OTHERWISE.
g. REMOVAL OF HISTORIC FRAMING WHERE 5HOWN
15 TO BE MINIMIZED AS MUCH AS POSSIBLE.
10. EXISTING HISTORIC, WINDOW5 AND DOORS ARE
5HOWN ON THE BUILDIN6 ELEVATION 5HEET5.
11. NO ELEMENTS ARE TO BE ADDED TO THE
HISTORIC BUILDIN65 THAT DID NOT PREVIOUSLY
EXIST. NO EXISTING MATERIALS OTHER THAN
WHAT HAS BEEN APPROVED PER HPG RESOLUTION
MAY BE REMOVED WITHOUT THE APPROVAL
OF STAFF AND MONITOR.
12. THERE SHALL BE NO DEVIATIONS FROM THE
EXTERIOR ELEVATION AS, APPROVED BY HPG
WITHOUT FIRST BEING REVIEWED AND APPROVED
BY HPG STAFF AND MONITOR OR THE FULL
BOARD
13. PLEASE REFER TO ARCHITECTURAL EXI5TIN6
DRAWIN65 TO DETERMINE ORIGINAL MATERIAL5.
PLEASE REFER TO ARCHITECTURAL AND DEMOLITION
PERMIT 155UE DRAAIN65 FOR WHICH MATERIALS ARE
TO BE 5ALVA6E0 / PRESERVED.
EFFICIENT BUILDIN6 PROGRAM GENERAL NOTES FOR ENTIRE PROJECT:
I. ALL WOOD , METAL, CARDBOARD, CONCRETE, CARPET
g. MECHANICAL EQUIPMENT WILL BE CENTRALLY LOCATED -
PADDING IS TO BE SALVAGED AND RECYCLED, ALL OTHER
REF. MECHANICAL DRAWINGS
DEMOLITION MATERIALS ARE TO BE COMPACTED, ALL
10. ALL DUCTWORK SHALL BE SEALEID WITH MASTIC
AVAILABLE MATERIALS ARE TO BE DONATED TO A NON
II. ALL HOT WATER PIPE5 WILL BE INSULATED TO R2.5
PROFIT PER QUALITY LEVEL AS ILLUSTRATED IN PART I OF
12. REF. ENERGY CALCULATIONS FOR A SIDE ARE HOT
SECTION 2.0 OF THE EFFICIENT BUILDING PROGRAM A5
WATER HEATER IF SPECIFIED
APPLICABLE
13. THE MECHANICAL ENGINEER WILL SPECIFY A 51% MIN.
2. RECLAIMED LUMBER, EXTERIOR TRIM, SIDING, FLOORING,
EFFICIENT BOILER OR A 1014% EFFICIENT FURNACE WITH
RECYCLED CONTENT DECKING, 5HEATHIN6, SIDING, ROOFING,
MODULATING OR SEQUENTIALLY STAGED BOILERS
RAPIDLY RENEWABLE CONTENT FLOORING WILL BE USED PER
14. THERE WILL BE A OUTDOOR THERMOSTAT CONTROL
QUALITY LEVEL A5 ILLUSTRATED IN PART II OF SECTION 2.0
15. HYDRONIC HEATING WILL BE AT LEAST EQUAL TO 50% OF
OF THE EFFICIENT BUILDING PROGRAM AS, APPLICABLE
HEATING SYSTEM
3. PROVIDE FOR BUILT - IN KITCHEN RECYCLINCG CENTER FOR
16. THERE WILL BE "ENERGY STAR" APPLIANCES PER QUALITY
2 BINS
LEVEL A5 ILLUSTRATED IN 5ECTION '7.0 OF THE EFFICIENT
4. REF. LANDSCAPE ARCHITECTURE PLAN FOR XERISCAPE
BUILDIN6 PROGRAM AS APPLICABLE
LANDSCAPING PLAN. INCLUDE THE ADDITION OF ORGANIC
11. THERE WILL BE AN ENERGY EFFICIENT CLOTHES WASHER
MATERIAL TO AND AERATION OF SOIL, 2" DEEP WOOD MULCH
PER EFFICIENT BUILDIN6 PROGRAM LIST SELECTED FROM
PLANTING BEDS, APPROPRIATE USE OF LOW - WATER DEMAND
WWW.GEEI.ORG OF TIER 2 OR HIGHER
PLANTS WITH ZONED DRIP IRRIGATION SYSTEM AS, SPECIFIED
Ia. THERE WILL BE COMPACT FLUORESCENT BUL55 PER
IN EFFICIENT BUILDIN6 PR06RAM IF APPLICABLE
QUALITY LEVEL A5 ILLUSTRATED IN SECTION T.O OF THE
5. ADDITIONAL TREES WILL BE PLANTED ON SITE BEYOND
EFFICIENT 5UILDIN6 PROGRAM AS, APPLICABLE.
THE REQUIRED NUMBER OF TREES, PER SECTION 3.0 OR A5
11. THERE WILL BE EFFICIENT LIGHT CONTROLS TO CONTROL
REQUIRED BY THE ASPEN PARKS DEPT.
MORE THAN OR EQUAL TO TWO INTERIOR SPACES A5
6. ALL TOPSOIL AND SITE ROCK WILL BE REUSED ON SITE
SPECIFIED IN EFFICIENT BUILDING PROGRAM LIST.
FOR PLANTING AREAS AND USE PERVIOUS MATERIALS IN
20.
HARDSGAPE AREAS PER SITE PLAN PER QUALITY LEVEL A5
21.
ILLUSTRATED IN SECTION 3.0 OF THE EFFICIENT BUILDIN6
22. THERE 15 NO ATTACHED GARAGE
PROGRAM A5 APPLICABLE
23. THERE WILL BE LOW TOXIC FLOOR COVERING5
T. REFER TO STRUCTURAL DRAWIN65 FOR MORE NOTES
24. THERE WILL BE LOW Y.O.G. / LOW TOXIC PAINT AND
REGARDING THE COMPLIANCE WITH THE EFFICIENT BUILDIN6
CONSTRUCTION ADHESIVE5, AND WOOD FINISHES PER QUALITY
PROGRAM. THE FOLLOWING ARE TO BE SPECIFIED PER
LEVEL AS ILLUSTRATED IN SECTION 11.0 OF THE EFFICIENT
QUALITY LEVEL AS ILLUSTRATED IN SECTION 4.0 OF THE
BUILDIN6 PROGRAM AS APPLICABLE
EFFICIENT BUILDING PROGRAM AS APPLICABLE.
25. THERE WILL BE A COMPLETED RADON MITIGATION
THE FOLLOWING NOTES ARE NOT INTENDED TO BE
SYSTEM
COMPREHENSIVE
26. THERE WILL BE CARBON MONOXIDE DETECTORS OUTSIDE
A. USE FINGER JOINTED STUDS
ALL BEDROOMS
B. USE 055 IN 5U5FLOOR5 AND FOR WALL 5HEATHIN6
G. USE ENGINEERED LUMBER IN FLOORS AND WALLS
D. USE ENGINEERED LUMBER IN PLACE OF 2XIO AND 12
E. U5E NON -SOLVENT BA5ED WATERPROOFING
F. USE 2096 OR MORE FLYASH CONTENT CONCRETE
a. USE F5C CERTIFIED CABINETRY PER QUALITY LEVEL AS
ILLUSTRATED IN SECTION 4.0 OF THE EFFICIENT 5UILDIN6
PROGRAM AS APPLICABLE
VICINITY MAP
GENERAL SITE PLAN NOTES:
I. ALL TREES MUST BE REMOVED OR REPLACED ON
SITE OR MITIGATED WITH THE CITY OF ASPEN PARKS
DEPT. THERE ARE NO PROPOSED TREES TO BE
ADDED
2. ROOF PLAN SHOWN
5. GEN. CONT. 15 TO PROVIDE CONSTRUCTION
FENCING AT PROPERTY LINES
4. ALL ROOF GUTTERS AND DOWNSPOUT ARE TO
DRAIN TO TO ON SITE DRYWELL(5) REF. CIVIL
EN6INNERING DRA►NINGS FOR MORE INFORMATION.
S. REF. SHEET A.O FOR HPG APPROVED
LANDSCAPING PLAN
6. REFER TO DRAINAGE AND GRADING PLAN
PROVIDED BY HIGH COUNTRY ENG. FOR GRADING
PLAN, TARGET SITE ELEVATIONS, DRYWELL
LOCATIONS, CURB AND GUTTER AND SIDEWALK
DETAILS, AND 6ENERAL DRAINAGE REPORT NOTES
AND ANNOTATIONS.
'7. EXTERIOR LI6HTIN6 PLAN TO BE DETERMINED AT
A LATER TIME. ALL EXTERIOR LIGHTING FIXTURES TO
BE APPROVED BY HPC STAFF AND MONITOR PER
FINAL APPROVAL.
8. ALL DUMPSTER AND RECYCLE AREAS, UTILITY
METERS AND PEDESTALS MUST BE LOCATED ON THE
PROPERTY, IA4T ITY
I i
a. SETBACKS ARE ESTABLISHED DURING HPC
HEARIN65. THEES ARE RESENTED BY HPC FINAL
RESOLUTION e? SERIES OF 2006. SETBACKS FOR
NEW CONSTRUCTION ARE ESTABLISHED WITH RESPECT
TO THE HISTORIC HOUSE.
W
Lu
tli
X
GENERAL RELOCATION NOTES,
I. GENERAL CONTRACTOR IS RESPONSIBLE FOR
ACCURACY REGARDING HISTORIC BUILDINGS
FITTIN6 ONTO THEIR NEW FOUNDATIONS
AFTER THE HISTORIC 51-065 HAVE BEEN
RELOCATED.
2. GENERAL CONTRACTOR 15 RESPONSIBLE
FOR MATCHING THESE ORAWIN65 TO THE
51TE PLAN. THESE DRAWIN65 ARE BASED
UPON THE SITE IMPROVEMENT SURVEY BY
RIVER CITY SURVEYS. GENERAL CONTRACTOR 15
RESPONSIBLE FOR VERIFYING THE ACCURACY
OF THE SITE IMPROVEMENT SURVEY.
GENERAL CONTRACTOR WILL CONSULT
WITH ARCHITECT SHOULD DIMENSIONAL
CONFLICTS OCCUR.
5. HISTORIC BUILDING OUTLINE SHOWN IS
APPROIXIMATE. THE ACTUAL FOOTPRINT OF THE
EXISTING FOUNDATION MAY VARY. GENERAL
CONTRACTOR 15 RESPONSIBLE TO CONSTRUCT
THE NEW FOUNDATION IN THE SAME CONFI6. A5 THE
HISTORIC FOUNDATION. GENERAL CONTRACTOR
WILL CONSULT WITH ARCHITECT SHOULD
DIMENSIONAL CONFLICTS OCCUR.
HOUSE RELOCATION PLAN=
HISTORIC HOUSE 15 TO BE MOVED FORWARD PER HPC
APPROVED SITE PLAN. THE GROUND LEVEL FLOOR
FRAMING 15 TO BE REMOVED ALONG WITH THE
FOUNDATION. HISTORIC HOUSE 15 TO BE PROPERLY
BRACED FOR LATERAL
STRESSES PRIOR TO BEING MOVED. HOUSE IS TO BE
RAISED ON TEMPORARY SHORING AND OR CRIBBING
PER HOUSE MOVING CONTRACTOR AND STORED ON
SITE. AFTER CONSTRUCTION d PREPARATION,
OF NEWLY CONSTRUCTED FOUNDATIONS, HOUSE 15 TO
BE LOWERED ONTO THESE
NEW FOUNDATIONS.
NOTE: ALL HOUSE RELOCATIONS AND HOUSE MOVING
METHODOLOGIES ARE TO BE VERIFIED AND
APPROVED BY HOUSE MOVING SUBCONTRACTOR.
SETBACK ® UPPER LEVEL
0
ft1
SETBACK 0 MAIN LEEL-//
RESTORE TO
&PASS YARD
EXISTING VAALK
L16HTAELL
`- STONE WALKWAY
0
- EX15TINCP FENCE
1.1
STAIRS
< 30"
ALL EXISTING TREES
ARE TO REMAIN - NO
4 TREES ARE
BE ADDED
a
1/2"
CONCRETE DRIVE
I
30.00'
If ===W
I
r
%3) n_
W
LOT K
— — _ — — PROPERTY LINE _
LE
6RA VEL ALLEY
a
' 1 1/2"
--F PROPERTY LINE T
��f I
�I I
of
0-2 CAR
{
a f WALKWAY (SARA E
L161-ITWELL !
I
a
I
f
I � u
I
STAIRS tc p
f 3
W
51-0
Q
O
I I I
HOT TUB
{
( I
1 I �
110 E. BLEEKER
TWO STORY
HISTORIC HOU5E
I
LIGHTWELL I
f {
1 {
I
I
I
\-L1(9HTAELL
c3 {
f a i
I H15TORIC HOUSE TO
BE MOVED FORWARD TOWARD5
SLEEKER STREET {
( � I
Q I
LOT L LOT M I LOT N
---- --- --- --- --- --- -- --
WOO60.00'D FENCE ^
WALKWAY
SLEEKER STREET
NORTH SITE ELEVATION -lSci I' = ARCH I TEGTURAtL 100'
('C� ('I '� PROP05E1D 51 TE PLAN
�:7V I.O 1/511
/n1I = it—all
I
O
F
0
W
9
O
a
z
0
F�
r1
n.
L
p...
4
3
JUL 26 2006
CONSORTIUM ARCHITECTS
W Z
W
a
Q
Z u-
0
W t—r
Q v� W
...� VZ � co
�o�o
pWo
W
Z
CN < W 0
m
tl) W��W
Y
QOp<
CL
_j
u
W Y
CL U
0
m
N
10
OD
O ti
o c o0
U rn
m rn
o om �
O
a a,
v
0
A
HPC FINAL: 06-12-2006
Const►uadon
Issue date:
Drawing Title:
SITE PLAN
Al ■ 01
I
O
F
0
W
9
O
a
z
0
F�
r1
n.
L
PARKING
8.5'X18'
SLOPE
TO DRAIN
ak T.O. sLAe o\<
ACCESS HATCH
< 151-55 OPENING
PRE�RE
76A:2
CAR
RACGE
101
CONNECTOR
106
PARKING
8.5'X18'
SLOPE
TO DRAI
PDR.
105
STAIR
00'7
&LASS PARTITION
WALL
f I
�I
�I
�I QI
A 1 LIVING Q 1017 IYI
&AS APPLIAN E T.B.D -
i WILL PROVIVE OUT SHEET AT
-HANICAL�111LDING PERMIT
LIGATION']
KITCHEN DE516N T.B.D -
VERIFY KITCHEN
DES16N AND LAYOUT
WITH KITCHEN
DE516NER
I
SCULPTURE WALL
10 PATIO
112
RIDGE ABOVE DINING
108
EXISTING
r DOOR ,1
WOOD
DECKIN6 PORCH
110
GONG. STEP
poi
00</
pu I I back
counter
1
I
co
— CLOSET —
102
i-------------
!
DN I R a 7 5/ib"
z
2T ® ii"
IoLT.O.
P.P. ® MAIN
W
ELEV. 100'-0"
I
I
DN
ENTRY
�
M
c1f) 00
1<
z
o
BEow
I
.�
UP
CONNECTOR
106
PARKING
8.5'X18'
SLOPE
TO DRAI
PDR.
105
STAIR
00'7
&LASS PARTITION
WALL
f I
�I
�I
�I QI
A 1 LIVING Q 1017 IYI
&AS APPLIAN E T.B.D -
i WILL PROVIVE OUT SHEET AT
-HANICAL�111LDING PERMIT
LIGATION']
KITCHEN DE516N T.B.D -
VERIFY KITCHEN
DES16N AND LAYOUT
WITH KITCHEN
DE516NER
I
SCULPTURE WALL
10 PATIO
112
RIDGE ABOVE DINING
108
EXISTING
r DOOR ,1
WOOD
DECKIN6 PORCH
110
GONG. STEP
poi
00</
pu I I back
counter
DESK
MAIN LEVEL PLAN
60"
ANTF
/
48"
E
KITCHEN I
IQQ
I4 D��
A
IX �
6 ,
e
Same elev. 05
bay window
- Pi�OPOSED
1/4 If = I $-®„ REF. I/A2.2 FOR &ENERAL PLAN NOTES
ACCESS HATCH
< 15LB5 OPENING
PRESSURE
ACCESS HATCH
< 151-55 OPENING
PRE55URE
r
BA5EMENT LEVEL PLAN - PROPOSED
1/4" = I1-011 REF. I/A2.2 FOR 6ENERAL PLAN NOTES
OPEN TO
ABOVE
SLOPE TO
DRAIN
/ MECH. \
000
—� T.O. SLAB a MEGH.
� ELEY big-O
EXTERIOR MATERIALS LIST:
I. DARK PATINA ZING - PROVIDE I" WOOD
SLEEPERS FOR SIDING VENTILATION
2. DARK PATINA STANDING SEAM ZINC ROOF -
PROVIDE HEAT RESISTANT W.P. MEMBRANE
S. 4" T86 PROPERLY SEASONED FOR MOISTURE
CONTENT IPE BRAZILIAN WALNUT SIDING, PRE
Sa
I T INED W/ STAIN T.B.D.
4. ROUGH SAWN SEALED it STAINED EXPOSED
TIMBER BEAM - REF. 5TRUCT.
S. 8" CEDAR LAP SIDING PRE STAINED W/ STAIN I
T.B.D.
6. R.S. STAINED CEDAR TRIM BOARD
'I. DULLED METAL FLASHING - 6" HIGH ® GRADE I
8. 1/2" GOR TEN METAL SHEET ROOFIN6
Q. 1/2" TEMPERED CLASS SHEETS W/ STAINLESS
STEEL SUPPORTS. NO HANDRAIL ON TOP OF
GLASS.
10. CONCRETE SLAB W/ INTEGRAL COLOR, I
WEATHER SEALED W/ TEXTURED FINISH - REF.
I PLANS FOR SNOW MELT AREAS
11. STAINED IPE WOOD DECKING W/ I/4" GAP
I DETWEEN 50ARD5, SCREW AND 6LUE TO
PALLETIZED DECKING SYSTEM BELOW - REF, PLANS
FOR SNOW MELT AREAS
I 12. DARK PATINA ZING TRIM
13. STAINLESS STEEL / GALVANIZED OPEN
GRATING W/ E6RESS HATCH PER 1Rc 8311
14. CUSTOM STAINED WOOD GARAGE DOOR I
I5. HISTORIC PAINTED WOOD CLAPBOARD SIDING -
I REPLACEMENT SIDING TO MATCH HISTORIC
16. WOOD TRIM - REPLACEMENT TO MATCH I
HISTORIC
I17. HISTORIC FISH SCALE SIDING I
I8. HISTORIC BRICK CHIMNEY TO 5E REBUILT TO
MATCH HISTORIC AFTER HOUSE 15 MOVED
IQ. CEDAR SHINGLE ROOFIN6
20. CONCRETE FOUNDATION
I I
LI f
— � — — — — DASHED LINE OF LEVEL ABOVE
NORTH
5U5 5A5EMENT LEVEL PLAN - PR0P05ED
A2.1 1/4" s I I -oil REF. I/A2.2 FOR GENERAL PLAN NOTES
JUL 2 6 2006
CONSORIJUM
S
W
1
I
co
Issue date:
Q
Drawing Title:
z
W
g
W
O
W W r
V5 W
f.
M
c1f) 00
z
DESK
MAIN LEVEL PLAN
60"
ANTF
/
48"
E
KITCHEN I
IQQ
I4 D��
A
IX �
6 ,
e
Same elev. 05
bay window
- Pi�OPOSED
1/4 If = I $-®„ REF. I/A2.2 FOR &ENERAL PLAN NOTES
ACCESS HATCH
< 15LB5 OPENING
PRESSURE
ACCESS HATCH
< 151-55 OPENING
PRE55URE
r
BA5EMENT LEVEL PLAN - PROPOSED
1/4" = I1-011 REF. I/A2.2 FOR 6ENERAL PLAN NOTES
OPEN TO
ABOVE
SLOPE TO
DRAIN
/ MECH. \
000
—� T.O. SLAB a MEGH.
� ELEY big-O
EXTERIOR MATERIALS LIST:
I. DARK PATINA ZING - PROVIDE I" WOOD
SLEEPERS FOR SIDING VENTILATION
2. DARK PATINA STANDING SEAM ZINC ROOF -
PROVIDE HEAT RESISTANT W.P. MEMBRANE
S. 4" T86 PROPERLY SEASONED FOR MOISTURE
CONTENT IPE BRAZILIAN WALNUT SIDING, PRE
Sa
I T INED W/ STAIN T.B.D.
4. ROUGH SAWN SEALED it STAINED EXPOSED
TIMBER BEAM - REF. 5TRUCT.
S. 8" CEDAR LAP SIDING PRE STAINED W/ STAIN I
T.B.D.
6. R.S. STAINED CEDAR TRIM BOARD
'I. DULLED METAL FLASHING - 6" HIGH ® GRADE I
8. 1/2" GOR TEN METAL SHEET ROOFIN6
Q. 1/2" TEMPERED CLASS SHEETS W/ STAINLESS
STEEL SUPPORTS. NO HANDRAIL ON TOP OF
GLASS.
10. CONCRETE SLAB W/ INTEGRAL COLOR, I
WEATHER SEALED W/ TEXTURED FINISH - REF.
I PLANS FOR SNOW MELT AREAS
11. STAINED IPE WOOD DECKING W/ I/4" GAP
I DETWEEN 50ARD5, SCREW AND 6LUE TO
PALLETIZED DECKING SYSTEM BELOW - REF, PLANS
FOR SNOW MELT AREAS
I 12. DARK PATINA ZING TRIM
13. STAINLESS STEEL / GALVANIZED OPEN
GRATING W/ E6RESS HATCH PER 1Rc 8311
14. CUSTOM STAINED WOOD GARAGE DOOR I
I5. HISTORIC PAINTED WOOD CLAPBOARD SIDING -
I REPLACEMENT SIDING TO MATCH HISTORIC
16. WOOD TRIM - REPLACEMENT TO MATCH I
HISTORIC
I17. HISTORIC FISH SCALE SIDING I
I8. HISTORIC BRICK CHIMNEY TO 5E REBUILT TO
MATCH HISTORIC AFTER HOUSE 15 MOVED
IQ. CEDAR SHINGLE ROOFIN6
20. CONCRETE FOUNDATION
I I
LI f
— � — — — — DASHED LINE OF LEVEL ABOVE
NORTH
5U5 5A5EMENT LEVEL PLAN - PR0P05ED
A2.1 1/4" s I I -oil REF. I/A2.2 FOR GENERAL PLAN NOTES
JUL 2 6 2006
CONSORIJUM
S
W
w
co
Issue date:
Q
Drawing Title:
z
W
g
W
O
W W r
V5 W
f.
M
c1f) 00
z
Cl3
W
cv
c'0LL'0
'hF-W
L.L.
�zW0
Q J
O
Cl3
WU�W
Y
'
0: i--
a0o<t
S
Y
a
rr��
v,
—1
m
9
9
V
co
8
LL
0
0
MPC FINAL: 06-12-2006
wnsaumn
co
Issue date:
O
Drawing Title:
+_
FLOOR PLANS
f.
w
O
N CD
Z
�...0
V
co
LL
0
L
cu
V
0
Z
cl)
c1714
~ N
O
O
t>l: �
v
o
V
o
9L
MPC FINAL: 06-12-2006
wnsaumn
Issue date:
0
Drawing Title:
+_
FLOOR PLANS
A 2.1 ���