HomeMy WebLinkAboutresolution.council.093-23RESOLUTION # 093 (Series of 2023) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CHANGE ORDER BETWEEN THE CITY OF ASPEN AND EXCAVATION SERVICES INC. AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE ORDER ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a change order for E Water Pl. retaining wall improvements, between the City of Aspen and Excavation Services Inc., a true and accurate copy of which is attached hereto as Exhibit "II"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that change order for $167,810, between the City of Aspen and Excavation Services Inc., a copy of which is annexed hereto and incorporated herein and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ, AND ADOPTED by the City Council of the City of Aspen on the 20th day of June 2023. 07'�— Torre, Mayor I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, June 20th, 2023. f t Nicole Henni g, City Clerk DocuSign Envelope ID: 2F93OA01-576D-4D9E-8969-BC268CBCOBB7 EXCA VA TION SER VICES INC. PO Box 1159 CARBONDALE, CO. 81623 PHONE 970-963-8355, FAX 970-963-4336 PROPOSAL DATE 513012023 CONTRACTING PARTY COA Capital Assets Ben Levenson ADDRESS OF PROPERTY• 13-14 Waters Place Aspen, CO 81611 DESCRIPTION OF WORK TO BE DONE: We are pleased to submit the following bid for work done at the site listed above. Bid based on site visits with COA, Excavation Services, and B&Y Drilling. Due to ongoing shortages of plastic resins, cement, and other materials, the manufactures cannot guarantee availability or pricing of PVC, HDPE, precast products, pumps, or related items. Therefore, pricing or scheduling for associated line items cannot be guaranteed until time of contract execution and products are ordered. Due to drastically fluctuating fuel prices a fuel surcharge may be assessed each billing cycle. The surcharge may be adjusted to keep with current market fuel costs. Mobilization. $ 2,725.00 (Move equipment to and from site as needed to complete work.) Construction access. $ 10,270.00 (Import road base to create access road and remove trees.) Remove patio. $ 1,300.00 (Remove and palatize paver from existing patio to complete shoring.) Excavation. $ 9,210.00 (Excavate a 15' by 100' area 3' deep, and export form site to accommodate micro pile wall.) Site support. $ 13,100.00 (Provide shoring support, concrete cleanout, and toilet for the duration of the project.) Micro pile wall. $ 144,395.00 (Supply and install shoring system to prevent further patio and bank failure.) Backiill and reset patio. $ 10,610.00 (Import, backfill, compact, prep, and reset patio pavers, returning patio to original condition.) DocuSign Envelope ID: 2F930A01-576D-4D9E-8969-BC268CBCOBB7 Reclamation. $ 3,850.00 (Remove access road, spread topsoil, seed, and straw disturbances.) Total. $ 195,460.00 Change Order #1. Additional excavation. $ 20,000.00 (Excavate, provide shoring support, backfill, reset patio, and reclamation for an additional 525SgFt of disturbance created from additional 35LF of micropile wall.) Additional micropile wall design. $ 8,855.00 (Redesign shoring system to be 35LF longer, with a third row of piles, and increase pile cap to 42".) Additional micropile wall. $ 139,015.00 (Supply and install shoring system with an additional 35 feet longer, with a third row of piles, and increase pile cap to 42".) CON Total. $ 167,810.00 Job Total. $ 363,330.00 Exclusions: Fire suppression flushing records Sound fencing Storm Water Management Plans and record keeping Rock excavation Survey and layout Soils testing Snow removal Winter protection GPS As- builts Pricing terms: Pricing per line item and total price presented above, are good for one calendar year from date of contract execution. Should pricing for individual line items or total price need to be adjusted, due to increase in cost of materials and goods, an assessment can be made and pricing adjusted accordingly annually. Payment terins: Billing statements will be forwarded on or before the 25th of each month for work completed that month, Payment is due upon receipt. Amounts outstanding after the 15th of the next month shall bear interest at the rate of 1.5% per month or 18% annually. DocuSign Envelope ID: 2F930A01-576D-4D9E-8969-BC268CBCOBB7 Rock Clause: Blasting or splitting of rocks encountered, and special rock handling, including rocks in excess of 2.5 cubic yards or ledges 4 inches or more, shall be charged on a cost plus basis. Dewaterin In the event that underground water is encountered, dewatering the site shall be charged on a cost plus basis. Underground Utilities: Excavation Services is not responsible for the cost of any repairs to private utility lines not shown or located by owner or contracting party. Permits and Tap Fees: Contracting party is responsible for payment of all permits, taps and tap fees, public or private (subdivision regulations) prior to commencement of work. THIS CONTRACT IS ENTERED INTO BETWEEN THE UNDERSIGNED PARTIES AS OF THE DAY AND YEAR ABOVE WRITTEN. EXCAVATION SERVICES INC. Digitally signed by Justin Nunn DN: cn=Justin Nunn, o=Excavation Services Inc, ou, email=justin@excavationservi ces.biz, c=US Date: 2023.06.22 13:10:15 -06'00' TING PARTY CSXQr'0-7... pAaD Eli- - - f f - ■ ■ - f-- - - -- -- - - F -