Loading...
HomeMy WebLinkAboutFile Documents.550 S Spring St.0053.2018.ACBK 1 DATE:05/03/2018 MASTER PERMIT:0053.2018.ACBK PERMIT NUMBER:0008.2016.ACBK • COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION THECITYOFASPEN PROPERTY INFORMATION ADDRESS 550 S.SPRING STREET UNIT# PARCEL ID# 273718280001 LOT 1 BLOCK 107 TRACT Sky Hotel Subdivision/PD OR SUBDIVISION OWNER NAME ASPEN CLUB LODGE PROPERTIES,LLC CELL 202-625-7890 EMAIL BEST CONTACT David Jackson CELL EMAIL dwjackson@northridgecapital.com NAME PROJECT DETAILS • DESCRIPTION OF Change Order to existingpermit.Revised architectural and zoningdocuments.Revisions:exterior patios/fencingbased on site conditions;removal of door(1) IN DETAIL 9 in mudroom;new guard at master deck. PROJECT N/C Use of Building Class of Work Fixture Counts Equipment Checklist VALUATION ❑■ Commerical Toilets,Bidets SO FT OFID _Forced Air/Gravity Systems WORK AREA 0 Multi-Family 0 Addition Bathtub Wall,Suspended,or Unit Heaters ❑ Single Family 0AlteratonLavatory(Wash Basin) Gas Log Mixed-Use Shower UNITSQFT ❑ ❑ Repair Kitchen Sink(+Disposal) Gas Appliancew LOT SIZE ❑ 0 IFFR Dishwasher Appliance Vents (SQ FT) ❑ Tenant Finish Laundry Bar,Utility Sink Heat,Refrig,Cooling,or DISTURBED Will there be ❑ Demolition Clothes Washer Absorption Unit EXTERIOR AREA any roof/wall 0 Change Order Floor Sink Boilers(includes vent) penetrations? ❑ Floor Drain Air Handling Unit NEW SQ FT ❑ Yes Water Heater(Pan Req) _Cooling Systems Q #Gas Outlets Ventilation_ Fans WITH UT UOTIOf WORK ❑ No _Water Treatment Range Hood Other #of Gas System Outlets ZONE DISTRICT Snowmelt System Sq Ft J N Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or ~ Lot Size:Total surveyed square footage of property. if construction or work is suspended or Y q g p p Y abandoned for a period of 180 days at Z Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced. u_ New Sq Ft:Total added square footage for additions to net livable or net leasble space. p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re- FOR CITY USE ONLY APPROVALS viewer SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Department Needse Sign- Approved Permit Fee PC KH 5/3/2018 Plan Check Parks Impact Zoning x JPO 8/21/18 Engineering Zoning(50%) HPC School Ded. Building x DAM 8/21/18 Zoning(50%) CMP(50%) TDM Impact Fire — Engineering Energy Code REMP Ped.Amenity CMP Plan Check Water CMP(50%) (Hourly) Housing Cash in Lieu Stormwater Zoning Sanitation Parks Review (Hourly) Stormwater Env. Health Utility Review Engineering City Use Tax Parks (Hourly) Landscape GIS County Use Tax Efficiency Approvedrppetjeki# ) Lot Area Deed Restricted To Issue Census Code # of Dwellings 475-896-820 Plans Location Issuance 1,8 ( CITY OF ASPEN December2017 130 S. GALENA ST I ASPEN, CO�81611j l 550 S Spring St, Aspen, CO 0008.2016.ACBK ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET THE CIIYOFASPEN • FOR PLAN REVIEW QUESTIONS • U- "-•••. o ice sco . rowan..rou on.com Name Scott McHale Phone E-mail 9 FOR INSPECTION QUESTIONS Name Levi Prevost Phone E-mail eviprevos . ase.en.com OWNER • • Ile •••- — e• - U -• - i•U Name Phone Cell Phone Mailing Address 709 East Durant Ave City Aspen State CO ZIP 81611 E-mail Address dwjackson©northridgecapital.com OWNER'S AUTHORIZED AGENT Name John Sarpa Phone Cell Phone AdMailiesngs 501 East Hyman Ave City Aspen State CO ZIP 81611 dr E-mail john©johnsarpa.com Address APPLICATION BEST CONTACT Rowland+Broughton Architecture,Scott McHale �' - • - •- Name Phone Cell Phone Mailing 234 E. Hopkins Ave. City Aspen State CO ZIP 81611 Address E-mail Address scott©rowlandbroughton.com ARCHITECT OR DESIGNER OF RECORD Rowland+Broughton Architecture,Scott McHale - - • - •- II Name l Phone Cell Phone a 234 E. Hopkins Ave. City Aspen State CO ZIP 81611 Address E-mail Address scott©rowlandbroughton.com CIVIL ENGINEER OF RECORD Sopris Engineering,Inc - Name Phone Cell Phone Mailing 502 Main St City Carbondale State CO ZIP 81623 Address E-mail Address jswann@soriseng.com STRUCTUAL ENGINEER OF RECORD Name KL&A,Inc Jeff Myers Phone • , Cell Phone Mailings 1717 Washington Ave Suite 100 City Golden State CO ZIP 80401 Addres E-mail Address jmyers@klaa.com GENERAL CONTRACTOR aseen Construction - Name H ld Phone • Cell Phone Mailing Address 6950 S Potomac Street City Centennial State CO ZIP 80112 E-mail Address brianhunt©haselden.com INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to rev. w the approved plans and any comments that are contained thereon and see that the structure and/or project bu" i co lance with all applicable codes. Contractor 5/3/18 Signature Date 114 I ❑ Check if y are a t ed owner builder(single-family homes only).You must take a test and complete the owner%building a a . (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file 1,8 ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO/81611J BUILDING DEPARTMENT 550 S Spring Street,Aspen, CO 0008.2016.ACBK ADDRESS: p 9 p PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST THECnorASPL, LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? Part of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District ❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high non-unit space water mark ❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure ❑ Work involves exterior of structure Changes to elevator or stair configuration ElChanging the number of residential units Changes to the use of existing structure or space ❑ Changes to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? ❑ Exterior lighting added or changed ❑ Work involves exterior wall penetrations ElWork involves roof penetrations El Work involves digging or excavation ❑ Work adds, removes, or changes ❑ Work involves restaurant or food service plumbing fixtures ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys 12 months ❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines ❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries dripline of a tree • RECEIVE ( CITY OF ASPEN _August130 S. GALENA ST I ASPEN, CO/81611j t l BUILDING DEPARTMENT COMMUNITY DEVELOPMENT DEPARTMENT Homeowner Association Compliance Policy All land use applications within the City of Aspen are required to include a Homeowner Association Compliance Form (this form) certifying the scope of work included in the land use application complies with all applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. Property Name: ASPEN CLUB LODGE PROPERTIES, LLC Owner("I"): Email: Phone No.: 202-625-7890 Address of 550 SOUTH SPRING STREET Property: ASPEN, CO 81611 (subject of application) I certify as follows: (pick one) This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application do not require approval by the homeowners association or covenant beneficiary. n This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application have been approved by the homeowners association or covenant beneficiary. Evidence of approval is attached. I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: date: q (I a ((a Owner printed name: 7)J l� tN ❑71cC]cs��l, {4 5('FN (JE o(Ei2i 7 E s, or, Attorney signature: date: Attorney printed name: RECEIVED 05/03/2018 ASPEN BUILDING DEPARTMENT ADDRESS: PERMIT NUMBER: 0008zo6A�BK COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THE Cif Y OF ASPEN Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed mea$ur m' 1:- Additional roof plans showing location of measurements may be necessary. CITY OF ASPEN August2o1� 05/03/20 130 S. GALENA ST I ASPEN, CO 81611j PERMIT NUMBER: 0008.2016.ACBK ADDRESS: 550 S Spring St, Aspen, CO COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THEcEOPATE\ 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) Levi Prevost understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zonin itatio . Contractor Signature: Date: 5/3/18 RECE1V 0.5/03/20 ( CITY OF ASPENAugust2o17 130 S. GALENA ST I ASPEN, CO 81611 t l BUILDING DEPARTMENT